Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20217D6551999-10-0101 October 1999 Requests That Natl Communication Sys Arrange for Licensee Participation in Government Emergency Telecommunications Service,Per NRC Info Notice 99-025 ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-12, Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested1999-06-23023 June 1999 Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 3F0699-08, Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments1999-06-21021 June 1999 Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments 3F0699-09, Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl1999-06-0404 June 1999 Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl 3F0599-21, Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads1999-05-28028 May 1999 Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads 3F0599-10, Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl1999-05-26026 May 1999 Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 3F0599-22, Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs1999-05-21021 May 1999 Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs 3F0599-18, Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM1999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM 3F0599-17, Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments1999-05-14014 May 1999 Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments 3F0599-07, Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 19781999-05-14014 May 1999 Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 1978 3F0599-03, Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR1999-05-12012 May 1999 Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR 3F0599-05, Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl1999-05-12012 May 1999 Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl 3F0599-08, Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments1999-05-0303 May 1999 Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments 3F0599-09, Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 19981999-05-0101 May 1999 Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 1998 3F0499-24, Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent1999-04-30030 April 1999 Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent 3F0499-09, Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 9907301999-04-30030 April 1999 Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 990730 3F0499-23, Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements1999-04-23023 April 1999 Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements 3F0499-18, Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl1999-04-20020 April 1999 Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl 3F0499-05, Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin1999-04-16016 April 1999 Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin 3F0499-08, Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 19981999-04-16016 April 1999 Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 1998 1999-09-27
[Table view] Category:UTILITY TO NRC
MONTHYEAR3F0990-11, Forwards Final Status Update Re Design & Operations Verification for Instrument Air Sys Per Generic Ltr 88-141990-09-20020 September 1990 Forwards Final Status Update Re Design & Operations Verification for Instrument Air Sys Per Generic Ltr 88-14 3F0990-05, Forwards 1990 Inservice Insp Summary Rept. Rept Contains Owners Data Rept,Data Summary Sections for Class 1,2 & 3 Components,Rept for Repair & Replacements & Listing of Exams1990-09-14014 September 1990 Forwards 1990 Inservice Insp Summary Rept. Rept Contains Owners Data Rept,Data Summary Sections for Class 1,2 & 3 Components,Rept for Repair & Replacements & Listing of Exams 3F0990-08, Forwards Response to Violations Noted in Insp Rept 50-302/90-23.Corrective Actions:Training Session Conducted to Stress Importance of Attachments Being Part of Work Package When Required by Procedure1990-09-13013 September 1990 Forwards Response to Violations Noted in Insp Rept 50-302/90-23.Corrective Actions:Training Session Conducted to Stress Importance of Attachments Being Part of Work Package When Required by Procedure 3F0890-23, Discusses Decommissioning Financial Assurance Rept Dtd 900726.Amount Util Collecting Exceeds Amount Necessary Based on NRC Formula & Does Not Include Estimated Cost of Removal & Disposal of Nonradioactive Structures & Matls1990-08-30030 August 1990 Discusses Decommissioning Financial Assurance Rept Dtd 900726.Amount Util Collecting Exceeds Amount Necessary Based on NRC Formula & Does Not Include Estimated Cost of Removal & Disposal of Nonradioactive Structures & Matls ML20028G8251990-08-29029 August 1990 Advises That Supplemental Response to Insp Rept 50-302/89-18 Will Be Submitted by 901030 ML20059G1721990-08-24024 August 1990 Submits Info Re Change in Operator License Status.Re Rawls & Wa Stephenson Senior Reactor Licenses Should Be Terminated, Effective 900817 Due to Reassignment from Position Requiring Licenses 3F0890-15, Forwards Fitness for Duty Program Performance Data for Period of Jan-Jun 19901990-08-23023 August 1990 Forwards Fitness for Duty Program Performance Data for Period of Jan-Jun 1990 3F0890-21, Forwards Semiannual Radioactive Release Rept Jan-June 1990 for Crystal River Unit 3 & Rev 15 to Crystal River Unit 3 Odcm1990-08-23023 August 1990 Forwards Semiannual Radioactive Release Rept Jan-June 1990 for Crystal River Unit 3 & Rev 15 to Crystal River Unit 3 Odcm ML20059A0031990-08-16016 August 1990 Responds to NRC 900613 Request for Addl Info Re Util 871222 Response to Violations Noted in Insp Rept 50-302/87-30 3F0890-03, Forwards Rev 11 to Inservice Insp - Pump & Valve Program, Crystal River Unit 31990-08-16016 August 1990 Forwards Rev 11 to Inservice Insp - Pump & Valve Program, Crystal River Unit 3 3F0890-10, Advises That Util Completed Mods to Comply w/10CFR50.62 Requirements Re Reduction of Risk from ATWS Events1990-08-16016 August 1990 Advises That Util Completed Mods to Comply w/10CFR50.62 Requirements Re Reduction of Risk from ATWS Events 3F0890-05, Forwards Addl Info Re Response to Mode 3 Loca,Per 900711 Request,Providing Background of Factors Considered During Evaluation of Tech Spec Change Request 1741990-08-10010 August 1990 Forwards Addl Info Re Response to Mode 3 Loca,Per 900711 Request,Providing Background of Factors Considered During Evaluation of Tech Spec Change Request 174 ML20058L2001990-08-0202 August 1990 Provides Current Status of Reg Guide 1.97 Activities. Pressurizer Heater Status & Main Steam Safety/Relief Valve Position Indications Completed 3F0790-10, Forwards Justification for Continued Operation Re Emergency Diesel Generator Block Loading Voltage Dips.Util Will Install Higher Accuracy Relays to Improve on Accuracy & Repeatability of Load Intervals1990-07-18018 July 1990 Forwards Justification for Continued Operation Re Emergency Diesel Generator Block Loading Voltage Dips.Util Will Install Higher Accuracy Relays to Improve on Accuracy & Repeatability of Load Intervals 3F0790-06, Forwards Rev 1 to Cycle 8 Core Operating Limits Rept, Correcting Typo in Note 1 of Figures 1-8 & Note 2 of Figures 1,2 & 4-81990-07-12012 July 1990 Forwards Rev 1 to Cycle 8 Core Operating Limits Rept, Correcting Typo in Note 1 of Figures 1-8 & Note 2 of Figures 1,2 & 4-8 ML20055D5561990-06-29029 June 1990 Forwards 890505 & s to Be Placed in Plant File 3F0690-15, Informs That Tech Spec Actions Identified in Util Addressed as Part of Tech Spec Improvement Program,Per 900518 Request for Programmed Enhancements for Generic Ltr 88-171990-06-29029 June 1990 Informs That Tech Spec Actions Identified in Util Addressed as Part of Tech Spec Improvement Program,Per 900518 Request for Programmed Enhancements for Generic Ltr 88-17 3F0690-22, Forwards Annual Financial Repts for 1989 for Orlando Utils Commission & Cities of Bushnell,Leesburg,Ocala & Tallahassee,Per 10CFR50.71(b)1990-06-27027 June 1990 Forwards Annual Financial Repts for 1989 for Orlando Utils Commission & Cities of Bushnell,Leesburg,Ocala & Tallahassee,Per 10CFR50.71(b) 3F0690-19, Responds to Deviations Noted in Insp Rept 50-302/90-15. Corrective Actions:All Reg Guide 1.97 Category 1 Instruments on Main Control Board Marked & Engineered Safeguards Matrix Indicating Lights Arranged in Unique Array1990-06-25025 June 1990 Responds to Deviations Noted in Insp Rept 50-302/90-15. Corrective Actions:All Reg Guide 1.97 Category 1 Instruments on Main Control Board Marked & Engineered Safeguards Matrix Indicating Lights Arranged in Unique Array ML20043H5781990-06-21021 June 1990 Responds to Generic Ltr 89-06, Spds. All Open Issues Identified in NRC SER & Plant SPDS Satisfies NUREG-0737, Item I.D.2 & Suppl 1 ML20044A6121990-06-21021 June 1990 Forwards Payment of Civil Penalty,Per NRC 900524 Order Based on Findings in Insp Rept 50-302/89-09 ML20043J0221990-06-21021 June 1990 Submits Info in Support of Tech Spec Change Request 175,Rev 1,Suppl 1 Re Spent Fuel Pool Storage Capacity at Plant ML20043H4151990-06-21021 June 1990 Forwards Response to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. 3F0690-18, Responds to Violations Noted in Insp Rept 50-302/90-09. Corrective Action:Temporary Lettering Placed on Index Plates for Consistency W/Previous Markings Immediately Following Discovery of Error1990-06-20020 June 1990 Responds to Violations Noted in Insp Rept 50-302/90-09. Corrective Action:Temporary Lettering Placed on Index Plates for Consistency W/Previous Markings Immediately Following Discovery of Error ML20043H2901990-06-15015 June 1990 Forwards Results of Refuel 7 once-through Steam Generator (OTSG) Eddy Current Insp,Per Tech Spec Section 4.4.5.5.Eight Defective Tubes & Two Administratively Plugged Tubes in OTSG a Resulted from Review of Insp Data ML20044A0641990-06-13013 June 1990 Forwards Rev 5 to Physical Security Plan,Replacing Currently Approved Rev 4 W/Amends.Rev Withheld (Ref 10CFR73.21) ML20043G2271990-06-12012 June 1990 Suppls 900604 Ltr Describing How Control Room Habitability Dose Would Be Adversely Affected by Elimination of Reactor Bldg Flood Vol Unless Overly Conservative Failure Postulations Also Changed.Quarterly Updates to Be Provided ML20043G3711990-06-12012 June 1990 Forwards 1990 Internal Cash Flow Projection for Plant Which Updates Utils Utilization of Alternative (E) ML20043G2361990-06-12012 June 1990 Forwards Info Re Fire Protection Sys Reliability for Providing Water to Intermediate Bldg Following High Energy Line Break.B&W Issued Contract to Verify Mass/Energy Release & Motor Starters & Terminal Blocks Insulated ML20043F1601990-06-0404 June 1990 Provides Supplemental Info on Reactor Bldg Flooding,Per Util 900517 Ltr Describing Resolution Plan Being Pursued.Util Has Limited Vol of Water Contributed by Borated Water Storage Tank & Sodium Hydroxide Tank to Flood Level ML20043C8721990-05-31031 May 1990 Forwards Rev 0 to Crystal River Unit 3 Cycle 8 Core Operating Limits Rept, Per Tech Spec 6.9.1.7 ML20043B8431990-05-24024 May 1990 Describes Alternative Testing of Reactor Bldg Spray Suction Valves BSV-1 & BSV-8,per Generic Ltr 89-04.At Least One Valve Will Be Disassembled & Inspected During Each Refueling Outage Using Alternate Insp Method ML20043B2771990-05-18018 May 1990 Advises of Mod to Original Commitment & Plans to Store Seal Ring in Original Storage Location During Plant Operations, Per 790606 Ltr.Mod Minimizes Personnel Exposure & Enhances Seal Plate Leak Tightness Due to Less Handling ML20043B0321990-05-17017 May 1990 Provides Details of Resolution Util Will Pursue Re Reactor Bldg Flooding Detailed in Encl LER 90-005.Mod Will Be Installed to Add Alarm in Main Control Room to Indicate When Flood Level Reaches Point & Operator Action Begins ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20042G7681990-05-10010 May 1990 Submits Unsatisfactory Performance Testing Incident Repts, Per 10CFR26, Fitness for Duty. Results of Three Positive Blind Test Samples Certified to Contain No Drugs ML20043A4931990-05-10010 May 1990 Forwards Executed Amend 8 to Indemnity Agreement B-54 ML20042G2101990-05-0707 May 1990 Provides Notice of MW Kirk Permanent Reassignment from Position & Requests Termination of Senior Reactor Operator License 20481-1,effective 900505 ML20042E8611990-04-26026 April 1990 Forwards Annual Financial Repts for Six Participating Owners of Plant ML20012F2941990-03-30030 March 1990 Forwards Nonproprietary Rev to 51-1176431-02, Crystal River 3 Reactor Vessel...Temp Overpressure Protection, in Support of Tech Spec Change Request 174,Suppl 1 Re Response to Generic Ltr 88-11 ML20042D8321990-03-30030 March 1990 Provides Supplemental Response to Station Blackout Rule Implementation & Affirms That Diesel Generator Target Reliability Will Be Maintained ML20012E2041990-03-23023 March 1990 Requests Temporary Waiver of Compliance Granted on Tech Spec 3.9.8.2 Re DHR Power Source Requirements ML20012D9471990-03-21021 March 1990 Requests Approval of Capsule Withdrawal Schedule in Table 3-19 of BAW-1543,Rev 3, Master Integrated Reactor Vessel Surveillance Program to Allow Plant Refuel 7 Outage Plans to Continue on Schedule.Changes Needing NRC Approval Listed ML20012D7371990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47. Util Will Implement Appropriate Sys to Protect Against Overfill Concerns ML20012C4501990-03-13013 March 1990 Forwards Listing of Insurance Policies in Place for Plant as of 900225 ML20012B4821990-03-0707 March 1990 Forwards Inservice Insp Pump & Valve Program Relief Request V-371 Proposing Alternate Acceptance Criteria Requirements for IWP-4150 for Fluctuations in Hydraulic Instrument Readings ML20012B3651990-03-0101 March 1990 Lists Five Addl Drugs Included in 10CFR26 Re fitness-for- Duty Testing Program.Specimens Identified as Positive on Initial Screening Will Be Confirmed Using Gas Chromatography or Mass Spectrometry at Listed cut-off Levels ML20012A4041990-02-27027 February 1990 Forwards 1989 Annual Rept of Personnel Exposure in Accordance w/10CFR20.407 & Tech Spec 6.9.1.5.(a) & Annual Rept of Facility Changes,Tests & Experiments in Accordance w/10CFR50.59 ML20006G1731990-02-23023 February 1990 Advises That Util Voluntarily Agrees to Participate in Emergency Response Data Sys Proposed in Generic Ltr 89-15 ML20011F2411990-02-21021 February 1990 Provides Followup on & Documents Discussion in 900116 Meeting Re Emergency Diesel Generator Loading 1990-09-20
[Table view] |
Text
.-
6 e, -
S 00$%
, . O b*
OSE a
. . .c'l#
o
. Florida Power CORPORAftON September 27, 1988 3F0988-16 ,
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Resolution of High Energy Line Break Issues
Dear Sir:
Please find attached the results of Florida Power Corporation's (FPC) risk assessment associated with the liigh Energy Line Break review reported to the staff on September 7, 1988. The LER will be submitted by October 6, 1988 as required.
As part of the long term resolution of this issue FPC will seek NRC approval to utilize advances in the understanding of high energy line break phenomena reflected in more recent staff guidance. This will 4 include relief granted in Generic Letter 87-11 (i.e. elimination of arbitrary intermediate pipe breaks) and elimination of jet impingement consideration from postulated cracks.
I FPC will request conceptual concurrence as soon as the request can be effectively described. Formal approval will be sought following development and necessary internal reviews. This is likely to be late this year.
Sincerely, N
- h. M [ -
ry ;
98m * .s < >
88
' (
Rolf C. Widell, Director gg Nuclear Operations Sito Support
.o
$@ RCW/KRW/wa 8
, -e Attachments 881 xc: Regional Administrator, Region II Senior Resident Inspector Post Office Box 219
- Crystal River, Flonda 32629
- Telephora (904) 795 3802 A Flonda Progress Company
SUMMARY
Gilbert Associates, Incorporated (GAI) Report #1811, Effects of Hiah Enerav Pinina Systems Breaks Outside the Reactor Buildina, contains the criteria for postulating High Energy Line Breaks (HELB's) outside containment at CR-3. This constitutes the original and current design and licensing basis for CR-3. Included in this report are specific protection requirements for safety-related systems that were existing at the time the report was written. Subsequent to the origination of this report, additional safety-related components were installed at CR-3 as part of plant upgrades. In addition, the safety classification of existing raceways was upgraded to safety-related for many originally non-safety-related systems. A number of these modifications / changes have occurred in areas subject to postulated HELB jet impingements without sufficient documentation on the effects of jet impact forces. It is likely that potential pipe whip, EQ and flooding consequences are not made worse by the addition of new potential targets.
This issue was identified as a follow up to a Quality Programs Surveillance Report issued in January 1983 which pertained to the routing of electrical conduit. This Quality Program concern was that "documents establishing acceptance criteria used in engineering design considerations relative to the effects of missiles and high energy line breaks could not be determined".
'Jo better define postulated high energy line break locations, jet procsures, and the effects of HELB's on electrical raceways, Gilbert / Commonwealth (G/C) prepared a report intended to establish electrical raceway design criteria. This report, Hiah Encrav Line Hrqak Critoria for Electrical Raceway Protection, (G/C Report #2560) was issued in March 1986. This report showed that numerous HELB's were postulated in areas that contain safety-related systems. FPC believed implementation of the criteria in this report, without further research, would result in numerous jet shields or protection devices being added to mitigate the effects of the postulated breaks.
This approach woulo be potentially unnecessary and counter productive.
Jet shields impede maintenance, in-service inspections, etc and thereby increase equipment out-of-service and radiation exposures to plant personnel.
Impell Corporation performed a third-party review of G/C Report #2560 with the purpose of evaluating the criteria and methodologies. This review was completed in November 1986. Impell noted several conservatisms in the HELB criteria for postulating pipe breaks (the GAI #1811 report) in comparison to more recent criteria. The Impell review of the G/C report #2560 lead to a specific study of main steam line associated with penetration $106 to assess alternatives for FPC to address the HELB issue (s). This study was completed in August 1988. PPC determined that the potential exists that safety-related equipment, installed since original construction, did not consider HELB criteria. At that time F9C's recently revised design basis issue resolution process was invoked, and a one-hour notification was made to the NRC in accordance with 10CFR50.72 on September 7, 1988.
FPC evaluated the issues related to the main steam line associated
, with penetration #106. The evaluation has been completed and
! concludes that plant safety and operability has not been affected. A l m
Additional parallel efforts have concentrated on the development of a !
plan which will (1) resolve this HELB concern for the remainder of the high energy lines in CR-3, (2) perform an evaluation of the safety I significance of this issue, and (3) assess what interim corrective actions are required.
A detailed discussion of the plan to resolve this HELB concern for the remainder of CR-3 is included in Attachment B. The Safety Significance Evaluation is contained in Attachment C. Interim corrective actions are being taken to assure that HELB effects are considered in any plant modifications being implemented and/or designed at the present time. A more complete discussion of FPC's interim and long-term corrective actions will be provided as part of the LER submittal.
FPC considers that the results of the Safety Significance Evaluation supports continued operation of CR-3 while the evaluation and resolution of this issue is accomplished. However, if, during the subsequent evaluation, a situation is found which would violate a Technical Specification Limiting Condition for operation, the appropriate ACTION statement would be entered and the appropriate
- action taken unless appropriate relief is sought and granted.
4
ATTACHMENT A component Safety Analysis for HELB Effects The Main Steam Line Associated with Penetration #106 An Impell Corporation study, "Main Steam Line #106 HELB Evaluation (SP83-132)", was performed to assess the practical alternatives which are available to FPC to address the qualification of electrical equipment installed since original construction, for HELB, at CR-3.
The Impell study, using Gilbert Commonwealth (G/C) Report #2560, "High Energy Line Break Criteria for Electrical Raceway Protection", dated March, 1986 determined that of the 12 breaks, one circumferential and one longitudinal in each of the 6 locations, 9 needed to be evaluated.
(The other 3 breaks were eliminated from further consideration since one was already source shielded and the other two were each enveloped by another of the 9 breaks.) For each of these 9 breaks, plant walkdowns were performed and all targets, which had the potential for being adversely impacted by the discharging fluid, were identified.
By applying the more recent NRC criteria (such as that presented in Generic Letter 87-11) the number of breaks which needed further consideration was reduced from 9 to 3. An evaluation of the targets impacted by these remaining 3 breaks was performed to assess safety significance. The evaluation required both trains of the redundant systems to remain operable in order to meet the no loss of redundancy critoria of Gilbert Associates, Inc. (GAI) Report 1811, "Effects of High Energy Piping System Breaks Outside the Reactor Building", dated July 1974. The results of this evaluation are summarized below:
- 1. Break MS Terminal end break on 24 inch main steam line at containment Denetration #106.
The targets affected by this break are:
Component / Conduit # - Associated End Device MSE control station MS-6 (MOV MSV-55)
MSV-412 - (conduit)
MSV-412 - (valvo)
MSV-411 - (conduit)
MSV-411 - (valvo)
MSE Sol MSV-412 - SV-2 MSE terminal block #3 on MSV-411 MSE terminal block #3 on MSV-412 Analysis assumina failure of these components.
All but one of the above listed targets is associated with one of the two main steam isolation valvos, MSV-411 and MSV-412. Thoso valves are energized-to-close solenoid operated valves. Upon loss of the electrical signal to the valves due to either conduit failure, terminal block failure, or solenoid valve failure, thoso valves would not close in the event of this HELB. However, this HELD occurs in the same steam line as those valves, and their failure to close would not impact the steam lino break analysis in Chapter 14 of the FSAR. Since the break is postulated in the 1
I l
\
steam line upstream of the isolation valves, the steam generator would boil off and fail to isolate. The other 2 MSIV's, MSV-413 and MSV-414, would isolate the good steam generator and the Emergency Feedwater System would remove decay heat through that steam generator in accordance with the analysis. The motor control station for MSV-55, could also fail. MSV-55 is a stop check valve in the 6 inch steam line going from the main steam line to the emergency feedwater pump turbine. The failure of the j control station (MS-6) would prevent the function of this valve. .
The isolation function of MSV-55 is not required for HELB mitigation.
Conclusion The failure analysis of these components show that the system relied upon for mitigation, i.e., the Emergency Feedwater System, will continue to operate (i.e. both trains remain operable) and EFIC will provide for isolation of and flow to the good steam generator. Therefore, the ability to remove decay heat via the OTSG's is not impaired.
- 2. Break AS-5. Circumforential break. Six inch steam line to the emercancy feedwater Dumo turbine.
Targets affected by the break are:
Component / Conduit # - Associated End Device MSE motor starter for MSV-55 l
MSE MOV MSV-55 MSE control station MS-6 (MOV MSV-55)
MSV stop check valve MSE control station MS-6 (MSV-55)
MSS MS-107-PT MSS MS-109-PT MS-108-PT MS-106-PT Analysis The first 5 items above are all associated with MSV-55. See analysis for break MS-5.
The other 4 items are associated with or are transmitters providing main steam pressure signals to the Emergency Feedwater Initiation and Control (EFIC) System. These signals are used to initiate the EFW System on a steam line break. There are 8 transmitters total, two por steam line.
l 2
The postulated failures of these 4 transmitters are as follows:
. Loss of power and signal - transmitter fails Low - EFIC actuates. .
. Loss of sensor - transmitter fails Low - EFIC actuates.
. Hot short - transmitter fails High - EFIC will not actuate for these four transmitters. However, it will actuate due to transmitters MS-110, 111, 112, 113-PT (the other 4 transmitters).
Conclusion The postulated failure of MSV-55 and the 4 transmitters will not prevent both trains of the Emergency Feedwater System from actuating and mitigating the HELB.
- 3. Break'AS-5. Loncitudinal breaks six inch steam line to Emeraency Feeder to Dumo turbine.
Targets affected by the break are:
Comoonent/ Conduit # - Associated End Device MSS MS-107-PT MSS MS-109-PT CDR CD-98-LT (spare)
MSS MS-112-PT MSS MS-106-PT MSS MS-110-PT FWE control station FW6 (FWV-34)
MSS MS-108-PT Analysis CDR-41 has been made a spare. FWE-13, the control station FW6 for valve FWV-34 is of no consequence as FWV-34 is locked closed and the power is removed from the breaker. 6 EFIC transmiutors are affected by this break (MS-106, 107, 108, 109, 110, 112*PT). Two failure modes are possible for these transmitters: hot short or fail open. A hot short on all 6 transmitters would prevent the 4 MSIV's from closing. (Should the transmitters fail open, the 4 MSIV's would close and EFIC's function would be accomplished.)
FPC examined the hot short failure, more closely, to determine the failure effects. The following logic is used in the EFIC cabinets.
3
Cabinet A Logic (A + B) (C + D) = Start EFP-1, Closes MSIV 411, 412,
, 413, 414 Cabinet B Logic (A + C) -(B + D) = Start EFP-2, Closes MSIV 411, 412, 413, 414 Transmitters are associated with the EFIC cabinets as follows:
- MS-108-?f C Steam Gen. A Logic
- MS-112-PT C MS-111-PT B Steam Gen. B Logic MS-113-PT D
(*AS-5 Longitudinal HELB affected)
If the six transmitters failed in a hot short condition, then the following occurs:
- 1. Steam Gen. A logic does not actuate.
- 2. Steam Gen. B logic - cabinet A logic can actuate, cabinet B logic will not actuate.
- 3. Therefore, train A EFW will actuate but train B EFW will not actuate.
Therefore, these postulated failures could impact EFW System operability. FPC initiated action to evaluate the jet impingement forces on the conduits going to the six pressure transmitters referenced in this analysis. A field walkdown showed that two of the conduit targets (MSS-45 and MSS-49) going to the transmitters were protected from the jet stream by the rupture restraints on the six inch steam line going to the Emergency Feedwater Pump Turbine. The other four conduits (MSS-41, MSS-43, MSS-46, and MSS-47) that were originally identified as targets (going to the other four transmitters) were located on a conduit support that was partially in the jet stream, but the actual conduits themselves were not in the jet stream. The conduit support was analyzed, and it was determined that the jet impingement forces were not sufficient to compromise the conduit support integrity.
Conclusion The six transmitter associated failures have been shown to be not credible and the other two postulated failures do not impact EFW system operability. (i.e. both trains would remain operable).
4 J
Summary The jet impingement effects of these three breaks on targets installed since the original review was completed does not pose any undue safety risk. Sufficient equipment will remain functional to mitigate the HELB.
t 1
I f
5
e ATTACHMENT B Action Plan In order to resolve the HELB concern at CR-3, it is necessary to develop a systematic approach to review the high energy lines at CR-3.
The Gilbert Associates Inc. (GAI) Report #1811, "Effects of High (
Energy Piping Breaks Outside the Reactor Building", dated July 1974, contains the HELB methodology and criteria that was used to evaluate safety-related equipment installed during original construction. The focus of this action plan is to identify all safety-related equipment that munt function to mitigate the effects of HELB events and ensure that loss of redundancy does not occur during postulated HELB events.
This action plan has been divided into six phases of evaluation. A discussion of the objective and scope of each of these six phases is presented below.
Phase 1: HELB Jet Imoinaement Zone Maos Obiective: Develop revised HELB jet impingement zone maps using the criteria from Gilbert Commomwealth (G/C) Report #2560, "High Energy Line Break Criteria for Electrical Raceway Protection", dated March 1986, and elimination of Intermediate Arbitrary Breaks.
Scope: The G/C Report #2560 identified 59 break locations that must be evaluated using the existing HELL critoria for CR-3. This phase of the review will apply the new critoria contained in the NRC Generic Letter 87-11, "Relaxation In Arbitrary Intermediate Pipe Rupture Requirements", dated June 19, 1987, to determine the number of break locations that must be evaluated at CR-3.
l The jet impingement zone maps contained in G/C Report
- 2560 will be revised to reflect the break locations for terminal ends and stress related breaks.
This effort began on Friday, September 9, 1988, and a preliminary list of break locations were identified by
, G/C to FPC on Sunday, September 11, 1988. This preliminary review has reduced the number of breaks from 59 to 15 locations in the Intermediate Building that must be evaluated during our review. Jet impingement zone maps will be revised prior to conducting the field walkdowns discussed in Phase 4 of this plan. G/C j documented the basis of their review and provided a report to FPC on September 16, 1988.
1
Phase 2: Systems Identification Obiective: Identify the primary and support systems that must function at'CR-3 to mitigate the consequences of HELB events.
Scope: A review of previous safety analysis reports and documents will be made to identify and document those primary systems that must function to mitigate HELB events defined in GAI Report #1811. Included in this review will be a review of support systems that must also function in order for the primary safety systems to function.
Phase 2 was completed on' Friday, September 23, 1988.
Phase 3: Identification of Potential HELB Taraets pbiective: Review all Safety Related systems identified in Phase 2 to determine the list of potential targets (equipment) chat must be reviewed for HELB effects.
Scope: To accomplish this review, each discipline section has been assigned to develop a plan and criteria for determining which components / equipment / structures would be potential targets for an HELB. The data gathered will be entered into an electronic data base to facilitate control of the work and sorting needs. This data base is compatible with configuration management requirements.
This review effort commenced on Monday, September 12, 1988 and is currently scheduled to be complete by September 30, 1988.
In parallel with this activity, FPC is also evaluating other alternatives available to resolve the HELB issue.
Included in this effort is shielding of sources and adopting the current SRP 3.6.1 and 3.6.2. This parallel activity, which is scheduled to be completed by October 14, 1988, will provide additional detail regarding cost, schedule and resources needed to implement the alternatives considered. Based upon this information a decision will be made regarding which approach will be implemented to resolve the HELB issue at CR-3.
Phase 4: Field Walkdown of Hich Enerav Lines at CR-3 Obiective: Identify the targets (components, cable, piping, etc.)
that are within the HELB jet map zones for postulated breaks in the high energy lines within the Intermediate and Auxiliary Buildings consistant with the adopted criteria and approach from Phase 3.
Scope: This phase of the review will utilize the break location information developed in' Phase 1 and the list of potential targets (equipment) developed in Phase 3 to determine which specific equipment (i.e. , cable, 2
.~
components, piping) are affected by jet impingements in the high energy lines in the Intermediate and Auxiliary Building concistant with the adopted criteria and approach from Phase 3.
Field walkdowns will be accomplished using teams comprised of engineering personnel. The exact number of teams to be used and,the schedule for starting and completing this phase cannot be determined until Phases 1, 2, and 3 are completed. In preparation for performing these walkdowns, an Engineering consultant team performed field surveys of the break locations on September 14-16, 1988. The intent of this effort was to assess equipment needs, personnel requirements, and to develop a preliminary plan to accomplish the final walkdowns described above. The results of the field survey was presented to FPC on September 20, 1988. A schedule and plan for completing the walkdowns will be developed by October 28, 1988.
Phase 5: Failure Analysis obiective: Evaluate operability of systers needed to mitigate the effects of HELB events at CR-3.
Scoce: Perform a failure analysis on the equipment identified in Phase 4 that is affected by jet impingement forces to determine if their failure would cause any of the systems needed to mitigate the HELB event to become inoperable.
The schedule and resources needed to accomplish this task j cannot be determined until Phase 4 is completed.
Phase 6: Tarcet Survivability Analysis for HELB Events obiective: Determine if identified targets actually fail due to jet impingement forces from HELB events.
Scope: Conduct an engineering evaluation to determine if the jet impingement forces are of sufficient magnitude to cause equipment and/or system failure. The schedule and resources to complete this effort will be dependant upon the number of targets identified in Phaso 5.
i I
3
NI"fACHMENT C Pull Scope Evaluation of Safety Significance FPC's evaluation, to-date, of the safety significance of the potential HELB problems at CR-3 concludes that a threat to the health and safety of the general pub]ic does not exist and continued operation of CR-3 is justified. Tim bases for this conclusion include the following:
- 1. System Re42ndancy CR-3 is analyzed and licensed to have the capability to be shut down using either the HPI System or the EFW System. No HPI System components are located in the Intermediate Building. Therefore, a HELB evnnt in the Intermediate Building could not effect the HPI System, leaving it to safely shutdown the unit.
- 2. Conservative Desian Criteria The HELB criteria described in the GAI Report #1811 is conservative relative to the current SRP requirements. The report contains lower break stress allowables than the SRPs and thus more stress-related breaks are postulated than necessary. The report considered the break postulation stresses to include more conservative seismic loads than does the SRP. Also, the report considers crack induced jet impingement effects which are not required by current standards. These factors show that CR-3 high energy line break effects are conservatively postulated.
- 3. Operator Trainina and Procedures Licensed operators are trained to mitigate accidents initiated by HELBs. Scenarios are routinely run during simulator training providing opportunities for operators to diagnose conditions caused by HELB and mitigate resulting transients.
Emergency / Abnormal operating procedures address compensatory measures which can be taken in the event that certain equipment fails to acttste or does not perform its intended function. These procedures and training provide added assurance that the plant can be safoly shutdown in the event of HELB.
1
e
- 4. Lgy Probability of a Seismjc Event CR-3 is located in an area which is conside * 'o be seismically inactive. Studi m performed before CR-3 begah construction showed that the site has never exceeded a maximum ground motion of 0.025g even during the 1885 Charleston, SC earthquake. For design purposes, the maximum ground acceleration and response spectra l were developed using 0.05g. Piping analysis considered these factors and established the Design Basis Earthquake (DBE) as 0.05g l acting horizontally and 0.033g acting vertically and cccurring simultaneously. The Maximum Hypothetical Earthquake (MHE) is 2 x DBE., The facts that the piping is designed for 4 times the expected ground motion (0.025g) combined with~the historical perspective of earthquake activity discussed in FSAR Section 2.5.4, Seismology, leade FPC to conclude that the seismic load i
contribution to the potential for HELB's is overstated.
- 5. .,Intecrity of PiDina Systems Increased attention given to the integrity of feedwater piping systems brought about by the surry event and the actions required by Bulletin 87-01, Thinning of Pipe Walls in Nuclear Power Plants, reduces the probability of a HELB. FPC's program which is described in our letter dated September 3, 1987 began with the last refueling outage and is ongoing. As stated in our bulletin response, FPC's program provides additional assurance that adequate structural integrity remains in our high energy feedwater .
piping systems and CR-3 can continue to operate safely. I
- 6. MS-106 Evaluation j FPC's detailed evaluation of one particular postulated break in i the main steam line associated with penetration 106 has provided some assurance that other systtEa required to mitigate the effects of a HELB event will rema}n operable. ,