Cn Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating license No. DPR-72 Ref: ITS 5.7.1.2 April 8,2005 3F0405-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - March 2005 Monthly Operating Report

Dear Sir:

Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) March 2005 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, J. A. Franke Plant General Manager JAF/ff Attachment xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida. Inc.

,'I-Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL34428

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Aprili 2005 COMPLETED BY J. E. Lane 1'y TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (Month/Year): March 2005 MONTH YEAR TO DATE CUMULATIVE 1 DESIGN ELECTRICAL RATING (MWe-Net) 860 2 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 838 3 NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 176,844.3 4 NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 2,160.0 174,472.6 5 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 6 NET ELECTRICAL ENERGY GENERATED (MWH) 640,285 1,859,540 137,011,850

. t, ., ' Jr APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE April 1, 2005 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD: March 2005 No. Date Type Duration Reason Method of Cause / Corrective Actions ;. :ur F: Forced (Hours) (1) Shutting S: Scheduled Down (2) Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1)Reason: (2) Method A-EQUIPMENT FAILURE (Explain) I-MANUAL B-MAINTENANCE OR TEST 2-MANUALTRIP ISCRAM C-REFUEUNG 3-AUTO TRIP I SCRAM D-REGULATORY RESTRICTION 4-CONTINUATION E-OPERATOR TRAINING / UCENSE EXAMINATION 5-OTHER (Explahi)

F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)