3F0402-02, March 2002 Monthly Operating Report for Crystal River Unit 3

From kanterella
Jump to navigation Jump to search
March 2002 Monthly Operating Report for Crystal River Unit 3
ML021070367
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/08/2002
From: Roderick D
Florida Power Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0402-02
Download: ML021070367 (3)


Text

Florida Power A Progress Energy Company Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 April 8, 2002 3F0402-02 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Florida Power Corporation hereby submits the Crystal River Unit 3 (CR-3) March 2002 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

D. L. Roderick Plant General Manager DLR/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager I

NuierF' P3a42 Crystal River, FL 34428

APPENDIX A OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD (Month/Year):

50-302 FLCRP-3 April 1, 2002 L.J. Barbieri (352) 795-6486 x3761 March 2002 MONTH DESIGN ELECTRICAL RATING (MWe-Net)

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net)

NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 1 2

3 4

5 6

YEAR TO DATE 825 834 CUMULATIVE 744.0 744.0 0.0 631,962 2,160.0 2,160.0 0.0 1,835,005 151,567 149,283 0

115,804,268

APPENDIX B UNIT SHUTDOWNS DOCKET NO.

50-302 UNIT NAME FLCRP-3 DATE April 1, 2002 COMPLETED BY L.J. Barbieri TELEPHONE (352) 795-6486 x3761 REPORTING PERIOD:

March 2002 No.

Date Type Duration Reason Method of Cause /Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated at full power for the entire month.

(1) Reason:

A-EQUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING/

LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method I-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)