3F0502-02, April 2002 Monthly Operating Report for Crystal River Unit 3

From kanterella
Jump to navigation Jump to search
April 2002 Monthly Operating Report for Crystal River Unit 3
ML021970471
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/13/2002
From: Franke J
Florida Power Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0502-02, ITS 5.7.1.2
Download: ML021970471 (3)


Text

S 'Florid a Power A, Progress Energy Con-pam, Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 May 13, 2002 3F0502-02 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Florida Power Corporation hereby submits the Crystal River Unit 3 (CR-3) April 2002 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, J.

.Fran2ke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager ys Ri\\,,ei Njdea t

P C R ;,,sz Rier, FL 3442B

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Ma 2, 2002 COMPLETED BY J E Lane 9 TELEPHONE (352) 795-6486 x: 698 REPORTING PERIOD (MonthlYear):

April 2002 MONTH YEAR TO DATE CUMULATIVE DESIGN ELECTRICAL RATING (MWe-Net) 825 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 834 NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,879.0 152,286 NUMBER OF HOURS THE GENERATOR WAS ON LINE 719.0 2,879.0 150,002 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0

NET ELECTRICAL ENERGY GENERATED (MWH) 608,001 2,443,006 116,412,269

APPENDIX B UNIT SHUTDOWNS DOCKET NO.

50-302 UNIT NAME FLCRP-3 DATE May 2, 2002 COMPLETED BY L. J. Barbieri TELEPHONE (352) 795-6486 x3761 REPORTING PERIOD:

April 2002 No.

Date Type Duration Reason Method of Cause I Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated at full power for the entire month.

(1) Reason:

A-EQUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE n-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method:

1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)