3F0502-02, April 2002 Monthly Operating Report for Crystal River Unit 3
| ML021970471 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/13/2002 |
| From: | Franke J Florida Power Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3F0502-02, ITS 5.7.1.2 | |
| Download: ML021970471 (3) | |
Text
S 'Florid a Power A, Progress Energy Con-pam, Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 May 13, 2002 3F0502-02 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Monthly Operating Report
Dear Sir:
Florida Power Corporation hereby submits the Crystal River Unit 3 (CR-3) April 2002 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
Sincerely, J.
.Fran2ke Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager ys Ri\\,,ei Njdea t
P C R ;,,sz Rier, FL 3442B
APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Ma 2, 2002 COMPLETED BY J E Lane 9 TELEPHONE (352) 795-6486 x: 698 REPORTING PERIOD (MonthlYear):
April 2002 MONTH YEAR TO DATE CUMULATIVE DESIGN ELECTRICAL RATING (MWe-Net) 825 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 834 NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,879.0 152,286 NUMBER OF HOURS THE GENERATOR WAS ON LINE 719.0 2,879.0 150,002 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0
NET ELECTRICAL ENERGY GENERATED (MWH) 608,001 2,443,006 116,412,269
APPENDIX B UNIT SHUTDOWNS DOCKET NO.
50-302 UNIT NAME FLCRP-3 DATE May 2, 2002 COMPLETED BY L. J. Barbieri TELEPHONE (352) 795-6486 x3761 REPORTING PERIOD:
April 2002 No.
Date Type Duration Reason Method of Cause I Corrective Actions F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments None
SUMMARY
Crystal River Unit 3 operated at full power for the entire month.
(1) Reason:
A-EQUIPMENT FAILURE (Explain)
B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE n-OPERATIONAL ERROR (Explain)
H-OTHER (Explain)
(2) Method:
1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)