3F0503-01, April 2003 Monthly Operating Report for Crystal River Unit 3

From kanterella
Jump to navigation Jump to search
April 2003 Monthly Operating Report for Crystal River Unit 3
ML031410074
Person / Time
Site: Crystal River 
Issue date: 05/12/2003
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0503-01
Download: ML031410074 (3)


Text

Progress Energy Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 May 12, 2003 3F0503-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) April 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, J.

ranke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428 K

,--e 7) -f

.3QI

APPENDIX A OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-302 FLCRP-3 Ma2 1, 2003 J. E. Lane

~

(352) 795-6486 x3698 REPORTING PERIOD (Month/Year):

April 2003 MONTH 1

DESIGN ELECTRICAL RATING (MWe-Net) 2 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net)

YEAR TO DATE 860 834 3

NUMBER OF HOURS REACTOR WAS CRITICAL 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 5

UNIT RESERVE SHUTDOWN HOURS 6

NET ELECTRICAL ENERGY GENERATED (MWH)

CUMULATIVE 719.0 719.0 0.0 603,558 2,879.0 2,879.0 0.0 2,452,209 160,994 158,694 0

123,721,780

(

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE May 1, 2003 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

April 2003 SUMIARY:

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EQUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explin)

H-OTHER (Explain)

(2) Method 1-MANUAL 2-MANUAL TRIP I SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)

(.

(2 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None