3F0503-01, April 2003 Monthly Operating Report for Crystal River Unit 3
| ML031410074 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/12/2003 |
| From: | Franke J Progress Energy Florida |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3F0503-01 | |
| Download: ML031410074 (3) | |
Text
Progress Energy Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 May 12, 2003 3F0503-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Monthly Operating Report
Dear Sir:
Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) April 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
Sincerely, J.
ranke Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428 K
,--e 7) -f
.3QI
APPENDIX A OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-302 FLCRP-3 Ma2 1, 2003 J. E. Lane
~
(352) 795-6486 x3698 REPORTING PERIOD (Month/Year):
April 2003 MONTH 1
DESIGN ELECTRICAL RATING (MWe-Net) 2 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net)
YEAR TO DATE 860 834 3
NUMBER OF HOURS REACTOR WAS CRITICAL 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 5
UNIT RESERVE SHUTDOWN HOURS 6
NET ELECTRICAL ENERGY GENERATED (MWH)
CUMULATIVE 719.0 719.0 0.0 603,558 2,879.0 2,879.0 0.0 2,452,209 160,994 158,694 0
123,721,780
(
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE May 1, 2003 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:
April 2003 SUMIARY:
Crystal River Unit 3 operated the entire month without an outage.
(1) Reason:
A-EQUIPMENT FAILURE (Explain)
B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explin)
H-OTHER (Explain)
(2) Method 1-MANUAL 2-MANUAL TRIP I SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)
(.
(2 No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments None