3F1202-01, November 2002 Monthly Operating Report for Crystal River Unit 3
| ML023520179 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/10/2002 |
| From: | Franke J Florida Power Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3F1202-01, ITS 5.7.1.2 | |
| Download: ML023520179 (3) | |
Text
S-0 -3 O-.-
Florida Power A Progress Energy Company Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 December 10, 2002 3F1202-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Monthly Operating Report
Dear Sir:
Florida Power Corporation hereby submits the Crystal River Unit 3 (CR-3) November 2002 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
Sincerely, JJ. A. Franke Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Crystal River Nuclear Plant 15750 W Power Line Street Crystal River, FL 34428
APPENDIX A OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD (Month/Year):
50-302 FLCRP-3 December 1, 2002 J E Lane (352) 795-6486 x3698 November 2002 MONTH YEAR TO DATE DESIGN ELECTRICAL RATING (MWe-Net)
MAXIMUM DEPENDABLE CAPACITY (MWe-Net)
NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 1 2
3 4
5 6
825 834 CUMULATIVE 686.9 679.0 0.0 543,833 7,963.9 7,948.4 0.0 6,665,542 157,371 155,071 0
120,634,805
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE December 1, 2002 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:
November 2002 No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments 2002-02 11/07/02 F: Forced 41.0 H
3 The plant tripped as a result of a protective relay in the switch yard that mis-operated during the cycling of the power supply through a relay contact. The power supply spike caused the main plant output breaker to open which in turn tripped the turbine and resulted in a reactor trip.
Design modifications of the protective relay scheme have been implemented to prevent recurrence.
SUMMARY
Crystal River Unit 3 experienced a plant trip this month due to equipment in the 500 KV switch yard.
(1) Reason:
A-EQUIPMENT FAILURE (Explain)
B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING I LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)
H-OTHER (Explain)
(2) Method: