3F0704-01, June 2004 Monthly Operating Report for Crystal River Unit 3

From kanterella
Jump to navigation Jump to search
June 2004 Monthly Operating Report for Crystal River Unit 3
ML042030343
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/14/2004
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0704-01, ITS 5.7.1.2
Download: ML042030343 (3)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 July 14, 2004 3F0704-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - June 2004 Monthly Operating Report

Dear Sir:

Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) June 2004 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, I tf 1 r r J.(A. Cranke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 Lf'~

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNI NAME FLCRP-3 DATE July1, 2004 COMPLETED BY J.E. Lane TELEPHONE (35 86x3692 REPORTING PERIOD (Month/Year):

June 2004 MONTH YEAR TO DATE CUMULATIVE

\\

1 2

DESIGN ELECTRICAL RATING (MWe-Net)

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 860 838 3

4 5

6 NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 720.0 720.0 0.0 605,340 4,317.2 4,295.3 0.0 3,667,174 170388.5 168022.9 0.0 131,516,175

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE July 1, 2004 COMPLETED BY J.E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

June 2004 No.

Date Type Duration Reason Method of Cause / Corrective Actions..

F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EOUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUEEUNG D-REGULATORY RESTRICTION E&OPERATOR TRAINING I LUCENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OTHER (Explain)