December 2002 Monthly Operating Report for Crystal River Unit 3
ML030150593
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/08/2003
From: Franke J
Progress Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0103-01
Download: ML030150593 (3)


Text

. Progress Energy Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 January 8, 2003 3F0103-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Florida Power Corporation hereby submits the Crystal River Unit 3 (CR-3) December 2002 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, J. A. Franke Plant General Manager JAF/ff Attachment xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE January2. 2003 COMPLETED BY J. E. Lanei 0GY

)

TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (MonghYear):

December 2002 MONTH YEAR TO DATE CUMULATIVE I

DESIGN ELECTRICAL RATING (MWe-Net) 825 2

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 834 3

NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8,707.9 158,115 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 8,692.4 155,815 5

UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0

6 NET ELECTRICAL ENERGY GENERATED (MWH) 634,766 7,300,308 121,269,571

.0

,I APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE January 2, 2003 COMPLETED BY J. E. Lane TELEPHONE (352) 795.-64 x898 REPORTING PERIOD:

December 2002 No.

Date Type Duration Reason Method of Cause I Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EQUIPMENT FAILURE (Explain)

S-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E-OPERATOR TRAINING I UCENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explai)

(2) Method 1-MANUAL 2-MANUAL TRIP I SCRAM S-AUTO TRIP I SCRAM 4-CONTINUATION

-OThER (Explan)