3F0104-01, December 2003 Monthly Operating Report for Crystal River Unit 3
| ML040210486 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/13/2004 |
| From: | Franke J Progress Energy Florida |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3F0104-01 | |
| Download: ML040210486 (3) | |
Text
C Progress Energy Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 January 13, 2004 3F0104-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - December 2003 Monthly Operating Report
Dear Sir:
Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) December 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
'J. A. Franke Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River. FL 34428 I
---11
'---06i
1-;V
APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Januarv 2, 2004 COMPLETED BY J E.Lane TELEPHONE (352) 7 95-6x 3 6 9 8 REPORTING PERIOD (MonthlYear):
December 2003 MONTH YEAR TO DATE CUMULATIVE 1
DESIGN ELECTRICAL RATING (MWe-Net) 860 2
MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 834 3
NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,956.4 166,071 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 734.8 7,912.2 163,728 5
UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0
6 NET ELECTRICAL ENERGY GENERATED (MWH) 630,171 6,579,430 127,849,001
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50.302 UNIT NAME FLCRP-3 DATE January 2, 2004 coMPLETED BY J.E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:
December 2003 No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting
. S: Scheduled Down (2)
Comments 03-04 12/09/200 F
9.15 A
I The plant shut down to repair an EHC fluid leak on RHV-5..
SUMMARY
Crystal River Unit 3 shut down the unit on on 12/10/03.
12/09/03 to repair an EHC fluid leak on RHV-5. The generator was back on-line (1) Reason:
A-EOUIPMENT FAILURE (Explain)
B-MAINTENANCE OR TEST C-REFUELING 0-REGULATORY RESTRICTION E-OPERATOR TRAINING I LICENSE EXAMINATION F-ADMIMSTRATIVE 0-OPERATIONAL ERROR (Epplaln)
H-OTHER (Explain)
(2) Method:
I-MANUAL 2-MANUAL TRIP I SCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OHER (Expain)