C Progress Energy Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 January 13, 2004 3F0104-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - December 2003 Monthly Operating Report

Dear Sir:

Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) December 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

'J. A. Franke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River. FL 34428 I

---11

'---06i

1-;V

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Januarv 2, 2004 COMPLETED BY J E.Lane TELEPHONE (352) 7 95-6x 3 6 9 8 REPORTING PERIOD (MonthlYear):

December 2003 MONTH YEAR TO DATE CUMULATIVE 1

DESIGN ELECTRICAL RATING (MWe-Net) 860 2

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 834 3

NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,956.4 166,071 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 734.8 7,912.2 163,728 5

UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0

6 NET ELECTRICAL ENERGY GENERATED (MWH) 630,171 6,579,430 127,849,001

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50.302 UNIT NAME FLCRP-3 DATE January 2, 2004 coMPLETED BY J.E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

December 2003 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting

. S: Scheduled Down (2)

Comments 03-04 12/09/200 F

9.15 A

I The plant shut down to repair an EHC fluid leak on RHV-5..

SUMMARY

Crystal River Unit 3 shut down the unit on on 12/10/03.

12/09/03 to repair an EHC fluid leak on RHV-5. The generator was back on-line (1) Reason:

A-EOUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUELING 0-REGULATORY RESTRICTION E-OPERATOR TRAINING I LICENSE EXAMINATION F-ADMIMSTRATIVE 0-OPERATIONAL ERROR (Epplaln)

H-OTHER (Explain)

(2) Method:

I-MANUAL 2-MANUAL TRIP I SCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OHER (Expain)