3F0205-02, January 2005 Monthly Operating Report for Crystal River Unit 3

From kanterella
Jump to navigation Jump to search
January 2005 Monthly Operating Report for Crystal River Unit 3
ML050490174
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/09/2005
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0205-02, ITS 5.71.2
Download: ML050490174 (3)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 February 9, 2005 3F0205-02 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - January'2005 Monthly Operating Report

Dear Sir:

Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) January 2005 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

,f A. Franke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE February 1, 205 COMPLETED BY J. E. Lane5¢t t,

TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (Month/Year):

January 2005.

MONTH YEAR TO DATE CUMULATIVE 1

DESIGN ELECTRICAL RATING (MWe-Net) 860 2

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 838 3

NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 175428.3 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 744.0 173056.6 5

UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 6

NET ELECTRICAL ENERGY GENERATED (MWH) 640,517 640,517 135,792,827

., I.. of I

APPENDIX B UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE 50-302 FLCRP-3 February 1, 2005 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

January 2005 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EOUIPMENT FAIWRE (Explain)

B-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G.OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OTHER (Explain)