3F0205-02, January 2005 Monthly Operating Report for Crystal River Unit 3
| ML050490174 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/09/2005 |
| From: | Franke J Progress Energy Florida |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3F0205-02, ITS 5.71.2 | |
| Download: ML050490174 (3) | |
Text
Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 February 9, 2005 3F0205-02 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - January'2005 Monthly Operating Report
Dear Sir:
Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) January 2005 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
,f A. Franke Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428
APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE February 1, 205 COMPLETED BY J. E. Lane5¢t t,
TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (Month/Year):
January 2005.
MONTH YEAR TO DATE CUMULATIVE 1
DESIGN ELECTRICAL RATING (MWe-Net) 860 2
MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 838 3
NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 175428.3 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 744.0 173056.6 5
UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 6
NET ELECTRICAL ENERGY GENERATED (MWH) 640,517 640,517 135,792,827
., I.. of I
APPENDIX B UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE 50-302 FLCRP-3 February 1, 2005 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:
January 2005 No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments None
SUMMARY
Crystal River Unit 3 operated the entire month without an outage.
(1) Reason:
A-EOUIPMENT FAIWRE (Explain)
B-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G.OPERATIONAL ERROR (Explain)
H-OTHER (Explain)
(2) Method 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OTHER (Explain)