3F0804-01, July 2004 Monthly Operating Report for Crystal River Unit 3

From kanterella
Jump to navigation Jump to search

July 2004 Monthly Operating Report for Crystal River Unit 3
ML042320262
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/10/2004
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0804-01, ITS 5.7.1.2
Download: ML042320262 (3)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 August 10, 2004 3F0804-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - July 2004 Monthly Operating Report

Dear Sir:

Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) July 2004 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 J3EZ11

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Aupust2, 2004 COMPLETED BY J. E. Lane i

d TELEPHONE (352) 795-6486 x369{

REPORTING PERIOD (Month/Year):

July 2004 MONTH YEAR TO DATE CUMULATIVE 1

2 DESIGN ELECTRICAL RATING (MWe-Net)

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 860 838 3

NUMBER OF HOURS REACTOR WAS CRITICAL 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 5

UNIT RESERVE SHUTDOWN HOURS 6

NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0 0.0 625,326 5,061.2 5,039.3 0.0 4,292,500 171132.5 168766.9 0.0 132,141,501

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Auqust 2. 2004 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

July 2004 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting l

S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EOUIPMENT FAILURE (Expain)

B-MAINTENANCE OR TEST C-REFUELING 0-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method I-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 3-OTHER apn)