MONTHYEAR3F0104-03, Special Report 04-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 132004-01-27027 January 2004 Special Report 04-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 13 Project stage: Request 3F0804-01, July 2004 Monthly Operating Report for Crystal River Unit 32004-08-10010 August 2004 July 2004 Monthly Operating Report for Crystal River Unit 3 Project stage: Request 3F0804-04, Response to NRC Request for Additional Information Regarding Special Report 03-012004-08-10010 August 2004 Response to NRC Request for Additional Information Regarding Special Report 03-01 Project stage: Response to RAI 3F0904-03, Response to NRC Request for Additional Information Regarding Special Report 03-012004-09-0909 September 2004 Response to NRC Request for Additional Information Regarding Special Report 03-01 Project stage: Response to RAI ML0428300022004-10-0606 October 2004 RAI, Special Report 03-01 Project stage: RAI 3F1004-05, 60-Day Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections2004-10-27027 October 2004 60-Day Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections Project stage: Request 05000302/LER-2004-004, Regarding NUREG-1022 Clarification Required Reporting of Previous Steam Generator Tube Inspection Results2004-11-22022 November 2004 Regarding NUREG-1022 Clarification Required Reporting of Previous Steam Generator Tube Inspection Results Project stage: Request 3F1104-06, Response to NRC Request for Additional Information Regarding Once-Through Steam Generator, Special Reports 03-01 and 04-012004-11-24024 November 2004 Response to NRC Request for Additional Information Regarding Once-Through Steam Generator, Special Reports 03-01 and 04-01 Project stage: Response to RAI 3F0105-03, License Amendment Request 290, Revision 0, Probabilistic Methodology to Determine the Contribution to Main Stream Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria2005-01-27027 January 2005 License Amendment Request 290, Revision 0, Probabilistic Methodology to Determine the Contribution to Main Stream Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria Project stage: Request ML0502600212005-02-0101 February 2005 RAI, Refueling Outage 13 SG Tube Inspection Project stage: RAI ML0510203602005-03-30030 March 2005 Response to NRC Request for Additional Information Regarding Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 13 Project stage: Response to RAI ML0511903302005-04-26026 April 2005 Steam Generator Inspection Presentation Project stage: Request 3F0505-12, Revised Response to NRC Request for Additional Information Regarding Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 132005-05-20020 May 2005 Revised Response to NRC Request for Additional Information Regarding Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 13 Project stage: Response to RAI 3F0705-02, Response to Request for Additional Information (RAI) Regarding the Crystal River Unit 3, 60 - Day Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections2005-07-0808 July 2005 Response to Request for Additional Information (RAI) Regarding the Crystal River Unit 3, 60 - Day Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections Project stage: Response to RAI ML0524101112005-08-12012 August 2005 License Amendment Request 290, Revision 1 Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack Alternate Repair Criteria Project stage: Request 3F0805-06, Attachment F, Crystal River Unit 3 - License Amendment Request 290, Revision 1, Addendum C, 08/12/2005 to Topical Report 2346P, Revision 02005-08-12012 August 2005 Attachment F, Crystal River Unit 3 - License Amendment Request 290, Revision 1, Addendum C, 08/12/2005 to Topical Report 2346P, Revision 0 Project stage: Request ML0530803302005-11-23023 November 2005 Ltr., Steam Generator Tube Inservice Inspection Summary Reports from Fall 2003 Outage Project stage: Other 2005-01-27
[Table View] |
Text
Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 August 10, 2004 3F0804-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - July 2004 Monthly Operating Report
Dear Sir:
Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) July 2004 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 J3EZ11
APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Aupust2, 2004 COMPLETED BY J. E. Lane i
d TELEPHONE (352) 795-6486 x369{
REPORTING PERIOD (Month/Year):
July 2004 MONTH YEAR TO DATE CUMULATIVE 1
2 DESIGN ELECTRICAL RATING (MWe-Net)
MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 860 838 3
NUMBER OF HOURS REACTOR WAS CRITICAL 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 5
UNIT RESERVE SHUTDOWN HOURS 6
NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0 0.0 625,326 5,061.2 5,039.3 0.0 4,292,500 171132.5 168766.9 0.0 132,141,501
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Auqust 2. 2004 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:
July 2004 No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting l
S: Scheduled Down (2)
Comments None
SUMMARY
Crystal River Unit 3 operated the entire month without an outage.
(1) Reason:
A-EOUIPMENT FAILURE (Expain)
B-MAINTENANCE OR TEST C-REFUELING 0-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)
H-OTHER (Explain)
(2) Method I-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 3-OTHER apn)