July 2004 Monthly Operating Report for Crystal River Unit 3
ML042320262
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/10/2004
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0804-01, ITS 5.7.1.2
Download: ML042320262 (3)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 August 10, 2004 3F0804-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - July 2004 Monthly Operating Report

Dear Sir:

Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) July 2004 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

General Manager JAF/ff Attachment xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc.

Crystal River Nuclear Plant 15760 W.Power Line Street Crystal River, FL34428 J3EZ11

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Aupust2, 2004 COMPLETED BY J. E. Lane i d TELEPHONE (352) 795-6486 x369{

REPORTING PERIOD (Month/Year): July 2004 MONTH YEAR TO DATE CUMULATIVE 1 DESIGN ELECTRICAL RATING (MWe-Net) 860 2 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 838 3 NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,061.2 171132.5 4 NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 5,039.3 168766.9 5 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 6 NET ELECTRICAL ENERGY GENERATED (MWH) 625,326 4,292,500 132,141,501

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE Auqust 2. 2004 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD: July 2004 No. Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours) (1) Shutting l S: Scheduled Down (2) Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason: (2) Method A-EOUIPMENT FAILURE (Expain) I-MANUAL B-MAINTENANCE OR TEST 2-MANUAL TRIP / SCRAM C-REFUELING 3-AUTO TRIP / SCRAM 0-REGULATORY RESTRICTION 4-CONTINUATION E-OPERATOR TRAINING / LICENSE EXAMINATION 3-OTHER apn)

F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)