Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 March 10, 2005 3F0305-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - February 2005 Monthly Operating Report
Dear Sir:
Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) February 2005 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
Sincerely,
,,</
J. A. Ffnke Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida. Inc.
Crystal River Nuclear Plant 15760 W. Pover Line Street Crystal River. FL 34428 a
APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE March 1, 2005 COMPLETED BY J. E. LaneA 6M TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (MonthlYear):
February 2005 MONTH YEAR TO DATE CUMULATIVE 1
DESIGN ELECTRICAL RATING (MWe-Net) 860 2
MAXIMUM DEPENDABLE CAPACITY (MWe-Net) 838 3
NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 176100.3 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 672.0 1,416.0 173728.6 5
UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 6
NET ELECTRICAL ENERGY GENERATED (MWH) 578,738 1,219,255 136,371,565
APPENDIX B UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE 50-302 FLCRP-3 March 1,2005 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:
February 2005 No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments None
SUMMARY
Crystal River Unit 3 operated the entire month without an outage.
(1) Reason:
A-EQUIPMENT FAILURE (ExplaIn)
B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)
H-OThER (ExplaIn)
(2) Method 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)