Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 March 10, 2005 3F0305-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - February 2005 Monthly Operating Report

Dear Sir:

Florida Power Corporation, doing business as Progress Energy Florida, Inc., hereby submits the Crystal River Unit 3 (CR-3) February 2005 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely,

,,</

J. A. Ffnke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida. Inc.

Crystal River Nuclear Plant 15760 W. Pover Line Street Crystal River. FL 34428 a

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE March 1, 2005 COMPLETED BY J. E. LaneA 6M TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (MonthlYear):

February 2005 MONTH YEAR TO DATE CUMULATIVE 1

DESIGN ELECTRICAL RATING (MWe-Net) 860 2

MAXIMUM DEPENDABLE CAPACITY (MWe-Net) 838 3

NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 176100.3 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 672.0 1,416.0 173728.6 5

UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 6

NET ELECTRICAL ENERGY GENERATED (MWH) 578,738 1,219,255 136,371,565

APPENDIX B UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE 50-302 FLCRP-3 March 1,2005 COMPLETED BY J. E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

February 2005 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EQUIPMENT FAILURE (ExplaIn)

B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OThER (ExplaIn)

(2) Method 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)