March 2003 Monthly Operating Report for Crystal River Unit 3
ML031080418
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/10/2003
From: Franke J
Progress Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0403-01
Download: ML031080418 (3)


Text

Progress Energy Docket No. 50-302 Operating license No DPR-72 Ref: ITS 5.7.1.2 April 10, 2003 3F0403-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Progress Energy Florida, Inc. hereby submits the Crystal River 2003 Monthly Operating Report in accordance with CR-3 Specification 5.7.1.2.

Unit 3 (CR-3) March Improved Technical If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida, Inc Crystal River Nuclear Plant 15760 W Powerline Street Crystal River, FL 34428

  CD-4

APPENDIX A OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-302 FLCRP-3 April 1, 2003 J E Lane W

b (352) 795-6486 x3698 REPORTING PERIOD (MonthlYear):

March 2003 MONTH YEAR TO DATE CUMULATIVE 1

DESIGN ELECTRICAL RATING (MWe-Net) 2 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 3 NUMBER OF HOURS REACTOR WAS CRITICAL 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 5

UNIT RESERVE SHUTDOWN HOURS 6

NET ELECTRICAL ENERGY GENERATED (MWH) 860 834 744.0 744.0 0.0 639,946 2,160.0 2,160.0 0.0 1,848,651 160,275 157,975 0

123,118,222

C APPENDIX B UNIT SHUTDOWNS

(

DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE April 1, 2003 COMPLETED BY J E Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

March 2003 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EQUIPMENT FAILURE (Explain) 8-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (ExplaIn)

(2) Method 1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)