Progress Energy Docket No. 50-302 Operating license No. DPR-72 Ref: ITS 5.7.1.2 June 11, 2003 3F0603-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Monthly Operating Report
Dear Sir:
Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) May 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida. Inc.
Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 3442B q-
APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE June 2 2003 COMPLETED BY K.V.Dyer TELEPHONE x
REPORTING PERIOD (MonthlYear):
May 2003 MONTH 1
DESIGN ELECTRICAL RATING (MWe-Net) 2 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net)
YEAR TO DATE 860 834 3
NUMBER OF HOURS REACTOR WAS CRMCAL 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 5
UNIT RESERVE SHUTDOWN HOURS 6
NET ELECTRICAL ENERGY GENERATED (MWH)
CUMULATIVE 744.0 744.0 0.0 626,708 3,623.0 3,623.0 0.0 3,078,917 161,738 159,438 0
124,348,488
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNT NAME FLCRP-3 DATE June 2. 2003 COMPLETED BY KV. Dver TELEPHONE (352) 795-641 REPORTING PERIOD:
16 x3494 Mav 2003
SUMMARY
Crystal River Unit 3 operated the entire month without an outage.
(1) Reason:
A-EQUIPMENT FAILURE (Expln)
B-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E4-PERATOR TRAINING LICENSE EXAMINATION FADMINISTRATVE GOPERATIONAL ERROR (Expin)
H OTHER (hin)
(2) Method 1-MANULL 2-MANUAL TRIP I SCRAM
-AUTO TRIPI SCRAM 44NownNUATION
&OTHER h)
No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments None