May 2003 Monthly Operating Report for Crystal River Unit 3
ML031700479
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/11/2003
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0603-01, ITS 5.7.1.2
Download: ML031700479 (3)


Text

Progress Energy Docket No. 50-302 Operating license No. DPR-72 Ref: ITS 5.7.1.2 June 11, 2003 3F0603-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Progress Energy Florida, Inc. hereby submits the Crystal River Unit 3 (CR-3) May 2003 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Progress Energy Florida. Inc.

Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 3442B q-

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE June 2 2003 COMPLETED BY K.V.Dyer TELEPHONE x

REPORTING PERIOD (MonthlYear):

May 2003 MONTH 1

DESIGN ELECTRICAL RATING (MWe-Net) 2 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net)

YEAR TO DATE 860 834 3

NUMBER OF HOURS REACTOR WAS CRMCAL 4

NUMBER OF HOURS THE GENERATOR WAS ON LINE 5

UNIT RESERVE SHUTDOWN HOURS 6

NET ELECTRICAL ENERGY GENERATED (MWH)

CUMULATIVE 744.0 744.0 0.0 626,708 3,623.0 3,623.0 0.0 3,078,917 161,738 159,438 0

124,348,488

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNT NAME FLCRP-3 DATE June 2. 2003 COMPLETED BY KV. Dver TELEPHONE (352) 795-641 REPORTING PERIOD:

16 x3494 Mav 2003

SUMMARY

Crystal River Unit 3 operated the entire month without an outage.

(1) Reason:

A-EQUIPMENT FAILURE (Expln)

B-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E4-PERATOR TRAINING LICENSE EXAMINATION FADMINISTRATVE GOPERATIONAL ERROR (Expin)

H OTHER (hin)

(2) Method 1-MANULL 2-MANUAL TRIP I SCRAM

-AUTO TRIPI SCRAM 44NownNUATION

&OTHER h)

No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None