3F1002-01, September 2002 Monthly Operating Report for Crystal River Unit 3
| ML022940472 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/10/2002 |
| From: | Franke J Florida Power Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3F1002-01 | |
| Download: ML022940472 (3) | |
Text
k Florida Power A Progress Energy Company Crystal River Nuclear Plant Docket No 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 October 10, 2002 3F1002-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Monthly Operating Report
Dear Sir:
Florida Power Corporation hereby submits the Crystal River Unit 3 (CR-3) September 2002 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
Plant General Manager JAF/ff Attachment xc:
Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Crystal River Nuclear Plant 15760 W Power Line Street Crystal River, FL 34428
APPENDIX A OPERATING DATA REPORT DOCKET NO.
50-302 UNIT NAME FLCRP-3 DATE October 1, 2002 COMPLETED BY J.E Lanev-
/y,,e TELEPHONE (352)795-6486x3o8 REPORTING PERIOD (Month/Year):
September 2002 MONTH YEAR TO DATE DESIGN ELECTRICAL RATING (MWe-Net)
MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 3 NUMBER OF HOURS REACTOR WAS CRITICAL 4
NUMBER OF HOURS THE GENERATOR WAS ON LINE 5
UNIT RESERVE SHUTDOWN HOURS 6
NET ELECTRICAL ENERGY GENERATED (MWH) 1 2
825 834 CUMULATIVE 720.0 720.0 0.0 605,075 6,532.0 6,524.4 0.0 5,492,322 155,939 153,647 0
119,461,585
APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE October 1, 2002 COMPLETED BY J E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:
September 2002 No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments None
SUMMARY
Crystal River Unit 3 operated the entire month without an outage or significant downpower.
(1) Reason:
A-EQUIPMENT FAILURE (Explain)
B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING I UCENSE EXAMINATION F-ADMINISTRATIVE 0-OPERATIONAL ERROR (Expitun)
H-OTHER (Explain)
(2) Method 1-MANUAL 2-MANUAL TRIP I SCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION 5-OTHER (Explain)