3F0902-02, August 2002 Monthly Operating Report for Crystal River Unit 3

From kanterella
Jump to navigation Jump to search
August 2002 Monthly Operating Report for Crystal River Unit 3
ML022660036
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/11/2002
From: Franke J
Florida Power Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0902-02, ITS 5.7.1.2
Download: ML022660036 (3)


Text

Florida Power A Progress Energy Company Crystal River Nuclear Plant Docket No. 50-302 Operating License No DPR-72 Ref: ITS 5.7.1.2 September 11, 2002 3F0902-02 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Florida Power Corporation hereby submits the Crystal River Unit 3 (CR-3) August 2002 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

i

ely, J

Franke lant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Crystal River Nuclear Plant 15760 W Power Line Street Crystal River, FL 34428

APPENDIX A OPERATING DATA REPORT DOCKET NO.

50-302 UNIT NAME FLCRP-3 DATE September 3, 2002 COMPLETED BY J E. Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD (MonthlYear):

August 2002 MONTH DESIGN ELECTRICAL RATING (MWe-Net)

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net)

NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 1 2

3 4

5 6

YEAR TO DATE 825 834 CUMULATIVE 744.0 744.0 0.0 622,296 5,812.0 5,804.4 0.0 4,887,247 155,219 152,927 0

118,856,510

. 3 APPENDIX B UNIT SHUTDOWNS DOCKET NO.

50-302 UNIT NAME FLCRP-3 DATE September 3, 2002 COMPLETED BY J E Lane TELEPHONE (352) 795-6486 x3698 REPORTING PERIOD:

August 2002 No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments None

SUMMARY

Crystal River Unit 3 operated at full power for the entire month.

(1) Reason:

A-EQUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUEUNG D-REGULATORY RESTRICTION E-OPERATOR TRAINING I LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method I-MANUAL 2-MANUAL TRIP ISCRAM 3-AUTO TRIP I SCRAM 4-CONTINUATION S-OTHER (Explain)