3F0184-05, Forwards Ltrs Submitted to EPA Re 316 Study Info,Per ETS, Part Ii,Section 3.2 Re Thermal Impacts from Plant Operation & Larval Entrainment & Adult Impingement

From kanterella
Jump to navigation Jump to search
Forwards Ltrs Submitted to EPA Re 316 Study Info,Per ETS, Part Ii,Section 3.2 Re Thermal Impacts from Plant Operation & Larval Entrainment & Adult Impingement
ML20083J775
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/05/1984
From: Westafer G
FLORIDA POWER CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20083J777 List:
References
3F0184-05, 3F184-5, NUDOCS 8401100304
Download: ML20083J775 (2)


Text

, . . -

bk) l l

g (t$h@JI8 Yh3 d

dae ir ws M

Power COnPOR4feON January 5,1984 3F0184-05 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Environmental Protection Agency 316 Study Information

Dear Sir:

Attached are five (5) letters which have been submitted to the Environ-mental Protection Agency and are hereby transmitted in accordance with Crystal River Unit 3 Technical Specifications, Appendix B, Part II, Section 3.2. These letters were only recently identified as not having been transmitted to your office. All future correspondence should be transmitted on a more timely basis.

Sincerely,

?/

G. R. Westafer 7

Manager t Nuclear Operations Licensing and Fuel Management Attachments Westafer(R01)C1-1 cc: Mr. J. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303 8401100304 840105 PDR ADOCK 050003C2 C 00 I R PDR General Office 3201 inirty-fourtn street souin . P O Box 14042. St Petersburg, Flonda 33733 e 813-866 5151 h

,d '*: r. I sv e-u -

W d l

    • s; "

J ca.........

October 11, 1983 Mr. Paul J. Traina, Director Water Management Division U. S. Environment 1 Protection Agency 345 Courtland Street NE Atlanta, CA 30365

Subject:

Crystal River 316 Study

Dear Mr. Traina:

Enclosed are two copies of Florida Power Corporation's first quar-terly report for the Crystal River 316 Study. This report was prepared by our consultant, Stone and Webster Engineering Corpora-tion. Major emphasis of this report was placed on detailing program modifications incorporated into the study subsequent to submittal of the approved Plan of Study, and to update the current status of sample collection and analysis.

Should you have questions concerning this report, please contact Mr. Paul J. Behrens at 813/866-5521.

Sincere bn nh.

R. Eustice Parnelle Manager Environmental Operations f*l*l* w w w ,

r~ 3 , j g O @; j

- . al i CT) U*. ,

l% i- y * =

e 3 $ II c 8C

~ 8g l j a s a si E

=EEgg e a .m =g y el 8  ! 8  ! [5 li  : 4

u. g- Y bl W 8 Y SS
  • Sc e[Esh Y t: !13 5 l II II III II: 5 1 b

o

  • g y -

E 33Md3S 1d13335 Null 133 {gl E

ZC uJ E

  • A I
f. 0 8 S33MN3$ IVN0lld0 g l E

said und 831sVnisod 11nsNos  ! I bener as vuew .. .. ., ... . 9161 '2dv 'oows uuo3 g Detersburg. Fionda 33733 e 813-866 5151