Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up
ML20135F397
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/06/1996
From: Bezilla M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135F400 List:
References
LR-N96408, NUDOCS 9612130028
Download: ML20135F397 (2)


LER-2096-025, Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up
Event date:
Report date:
3542096025R00 - NRC Website

text

_ _ _ _ . _ . . _ . . _ __ ___ . - - . . _ __

f

. "*O psgG  ;

Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 l

Nuclear Business Unit DEC 061996 I LR-N96408' ,

1 U.S. Nuclear Regulatory Commission  ;

Document Control Desk  ;

Washington, DC 20555 I i

Dear Sir:

! HOPE CREEK GENERATING STATION DOCKET NO. 50-354 I UNIT NO. 1 "

i LICENSEE EVENT REPORT NO. 96-025-00 This Licensee Event Report entitled, " Engineered Safety Feature Actuation - Reactor Core Isolation Cooling System Isolation," is i

being submitted pursuant to the requirements of l

10CFR50.73 (a) (2) (iv) .

i Sincerely, g?ll p' '

Mark Bezilla General Manager -

Hope Creek Operations l l

t Attachment i JPP SORC Mtg.96-111 l

C Distribution LER File

\N 6y 120085 4

9612130028 961206 PDR ADOCK 05000354, S PDR .

Thepwerisinyourfunds.

95-2168 HEV 694

. . _ , _ - . . . . _ _ _ _ _ . _ . _ _ _ . . . . _ _ . . . _ . _ _ _ . . _ _ . . ~ . _ . . _ . _ . _ _ . _ . . - _ . . _ . _ _ _ _ _ _

.. e. .

  • ,_ DEC 061996 Attachment A i The following items represent commitments that Public Service Electric.& Gas (PSE&G)- made to the Nitclear Regulatory Commission (NRC) relative to this LER (354/96-025-00). The commitments are

.as-follows:

l A work order (961126200) has been initiated to install l

recording instrumentation to determine actual line dynamics 1' during the next RCIC warm-up. This work is scheduled to be completed during the next forced / planned cold shutdown of l

the plant.

A plan will be developed to perform a RCIC system walkdown to evaluate the adequacy of the flow venturi installation.

This t plan will be completed by February 28, 1997. This walkdown will be completed no later than the next refueling i outage.