05000354/LER-1994-002, Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC

From kanterella
Jump to navigation Jump to search
Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC
ML20087J315
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/14/1995
From: Storz L
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N95129, NUDOCS 9508210061
Download: ML20087J315 (4)


LER-2094-002, Provides Clarification of Corrective Actions in LER 94-002-00 & Update on C/A Status,In Response to NOV Issued to Pse&G in NRC
Event date:
Report date:
3542094002R00 - NRC Website

text

V

~

O PSEG^

Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit AUG 141995 LR-N95129 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

REPLY TO A NOTICE OF VIOLATION FAL8IFICATION OF EDUCATIONAL RECORDS OFFICE OF INVESTIGATIONS REPORT NO. 1-94-016 NOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 A notice of violation i DV) was issued to PSEEG in a letter dated June 30, 1995. The transmittal letter stated the following:

"The NRC has determined that information regarding the reason for the violation and the actions taken and planned to correct the violation and prevent recurrence is addressed already on the docket in Hope Creek Generating Station LER 94-002-00, dated April 14, 1994. Therefore, you are not required to respond to this letter unless the description of your corrective actions in the LER does not reflect your actions or your position accurately" The description of our corrective actions in the LER does reflect our actions and position accurately; however, we have chosen to respond by providing a clarification of our corrective actions and an update on their status. The updated information is provided in the attachment to this letter.

Should you have any questions or comments on this transmittal, do not hesitate to contact us.

Sincerely,

%0

[g /.

L. F. Storz Senior Vice President -

Nuclear Operations Attachment 9508210061 950814 PDR ADOCK 05000354 a Q PDR lhe juxerisillymirlunk 952168 REV 694

, 4

~

' AUG 141995 Document Control Desk LR-N95129 C Mr. T. T.' Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. D. Jaffe Licensing Project Manager - Hope Creek

.U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 14E21 11555 Rockville Pike Rockville, MD 20852 Mr. R. Summers USNRC Senior Resident Inspector (SO9)

Mr. K. Tosch, Manager IV N.J. Department of Environmental Protection Division of Environmental Quality Bur 6au of Nuclear Engineering CN 415 Trenton, NJ 08625 f

.. e s.

1 1

ATTACHNENT REPLY TO NOTICE OF VIOLATION

.FAL8IFICATION OF EDUCATIONAL RECORDS  !

OFFICE OF INVESTIGATIONS REPORT NO. 1-94-016 NOPE CREEK GENERATING STATION FACILITY. OPERATING LICENSE NPF-57 _!

DOCKET NO. 50-354 LR-N95129 5 1

Iz INTRODUCTION 1 A notice of_ violation (NOV) has been issued for the incident involving a senior reactor operator who served in the role of a  !

shift-technical advisor without meeting the requirements  ;

(bachelor's degree or professional engineer's license) for the 1 position. -This resulted because the SRO had falsified his educational records by stating that he held a degree when in fact ,

he did not. j i

PSE&G has previously submitted information regarding the reason for the violation and the actions taken and planned to correct the violation and prevent recurrence'in Hope Creek Generating Station LER 94-002-00, dated April 14, 1994. These corrective actions included the following: )

1. The subject individual's employment at PSE&G has been terminated.
2. A review of the educational qualifications of all individuals currently performing STA duties at Hope Creek I Generating Station has been completed. This review verified that these individuals meet the educational requirements for an STA.
3. The present application and hiring process now requires that j transcripts be provided directly from the educational j institution for all employees who claim to have degrees.
4. An independent investigation by personnel other than Hope Creek Management is being conducted into this event. The results will be used to assess and strengthen our current employee qualification process.

IIz CLARIFICATION AND STATUS OF CORRECTIVE ACTIONS This attachment provides clarification of one corrective action ,

and an update on the status of all of the corrective actions identified in the LER. The clarifying and updated information is Page 1 of 2

.a AttachmIent LR-N95129 Reply to NOV - Falsification of Educational Records provided below.

Corrective Action 1: No change.

Corrective Action 2: The letter which transmitted the NOV stated that we had verified "that all individuals performing STA duties at Hope Creek and Salem met the educational requirements (by requiring all transcripts be provided directly from the educational institution for all employees who claim to have degrees)." In our letter (NLR-N94124) dated July 25, 1995, we stated that "a 100% review and verification was initiated for all licensed operators and STAS at both Hope Creek and Salem";

however, the method by which the review and verification was completed did not necessarily involve obtaining transcripts from the educational institution; in some cases, the verification was based upon discussions with the educational institution. The existing process requires obtaining transcripts directly from the educational institution, but this requirement was not e

retroactively applied to individuals hired before implementation of the new process.

Corrective Action 3: No change.

Corrective Action 4: An independent investigation was completed by the QA organization which resulted in various recommendations to strengthen the employee qualification process.

During recent activities to review the status of the corrective actions, it was determined that the recommendations of the QA investigation had not been adequately dispositioned and addressed. As a result, the Human Resources (HR) Department completed procedural changes to strengthen the employee qualification process. In addition, the HR department will ensure that the remaining QA recommendations are addressed and will conduct a self assessment to evaluate the effectiveness of implementation of the recommendations during the first quarter of 1996.

l Page 2 of 2