Forwards LER 84-023-03 Re Incorrect Setpoint for Reactor Protection Sys Low Primary Coolant Flow Trip.Commitment to Determine Correct three-pump Low Flow Trip Setpoint by 850930 Delayed Until Late 1985.W/o Encl
ML20137M455
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/19/1985
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8601280276
Download: ML20137M455 (2)


LER-2084-023, Forwards LER 84-023-03 Re Incorrect Setpoint for Reactor Protection Sys Low Primary Coolant Flow Trip.Commitment to Determine Correct three-pump Low Flow Trip Setpoint by 850930 Delayed Until Late 1985.W/o Encl
Event date:
Report date:
2552084023R00 - NRC Website

text

_ . . _

e- t sn -

lL w AV t> m a M

h Consumers j Power Company J Generet offices: 1945 West Parnali Road, Jackson, MI 49201 * (517) 788 0550 September 19, 1985 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen E11vn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

IE INSPECTION REPORT 84-27 COMMITMENT WITHDRAWAL IE Inspection Report 50-255/84-27(DPR), dated January 31, 1985, provided one item of noncomplience (255/84-27-01) for a Technical Specification violation involving an incorrect setpoint for the Reactor Protection System Low Primary Coolant Flow Trip. The occurrence was reported by Licensee Event Report (LER) 84-23-02, dated March 20, 1985. A response was submitted to the item of noncompliance by Consumere Power Company letter dated March 4, 1985.

A commitment was provided in the Licensee Event Report and in the response to the violation to determine a correct three pump low flow trip setpoint and to implement the proper setpoint by September 30, 1985. In the interim, three pump operation has been precluded by maintaining a reduced setpoint such that any three pump flow configuration will result in a reactor trip.

The Palisades Plant has been actively pursuing a revised trip setpoint through the appropriate vendor. The required vendor analysis is tentatively expected in late 1985 and a specific date for the impicmentation of the revised three pump low flow trip will be determined at that time.

As previously noted, a three pump low flow trip setpoint has been instituted such that three pump operation is precluded until all concerns relating to the.

setpoint have been resolved. With the current restrictive setpoint, the plant is in full compliance with the low flow trip setpoints required in Technical Specifications.

Based on the foregoing discussion, the commitment to determine a revised three pump, low primary coolant system flow trip setpoint by September 30, 1985 will be delayed and need not be held open, since a sufficiently restrictive 8601280276 850919 PDR ADOCK 05000255-O PDR ~

OC0985-0012B-NLO2 SEP 231985 h TFd{(

r

.on, 9

JGKeppler, Administrator 2 Palisades Plant IEIR 84-27 Commitment September 19, 1985 setpoint will be maintained until all concerns related to the'setpoint have been resolved with our vendor. An appropriate justification will be developed later in order to authorize 3 pump operation.

By separate letter the revision 3 to LER 84-023 is being submitted to the NRC Washington Office and is attached for your information.

// <w' QJ ,.

Brian D Johnson Staff Licensing Engineer CC Director,~0ffice of Nuclear Reactor Regulation Director, Office of Inspection & Enforcement NRC Resident Inspector - Palisades Attachment i