From: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9006200376
Download: ML18057A277 (4)


Text

....

consumers Power Kenneth W Berry Director l'DWERINli Nuclear Licensing MICHlliAN'S l'RDliRESS General Offices: 1945 West Parnall Road, Jackson, Ml 49201 * (517) 788-1636 June 15, 1990 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

CORRECTION TO PALISADES SIMULATOR SUBMITTAL - NRG FORM 474 By letter dated June 11, 1990, Consumers Power Company submitted the Palisades Simulator Certification. Both the cover letter and the attached documentation clearly indicated that Consumers Power Company was taking some exceptions to the requirements of ANSI/ANS 3.5, 1985. However, due to an oversight, NRG Form 474 was not marked to indicate that exceptions to ANSI/ANS 3.5, 1985 were taken. Therefore, please replace NRG Form 474 submitted June 11, 1990 with the attached, corrected version of -

NRG Form 474.

Kenneth W Berry Director, Nuclear Licensing CC Administrator, Region III, USNRC NRG Resident Inspector - Palisades

/l!ll~

'I 1 A OMS' ENERGY COMPANY

NRC ~ORM '74 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31!5CM)138 EXPIRES: 9-30-92 (1-801 10-CFR 5&.46lbl, 51.4 ond 66.5 ESTIMATED BURDEN PER RESPONSE TO COWLY WITH THIS INFORMATION COLLECTION REQUEST: 120 HRS. FORWARD SIMULATION FACILITY CERTIFICATION COMMENTS REGARDING BURDEN ESTIMATE TO THE INFOR*

MATION AND RECORDS MANAGEMENT BRANCH (MNlll 77141 U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, oC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (31!i0-0138), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.

INSTRUCTIONS. This form is to b* filed for initial certification, recertification (if required), and for any change to a simulation facilitY performance testing plan made after initial submittal of such a plan. Provide the following information, and check the appropriate box to indicate reason for submittal.

FACILITY IDOCKET NUMBER PALISADES NUCLEAR PLANT 50- 255 LICENSEE jDATE CONSUMERS POWER COMPANY 6/11/90 This is to certify that:

1. The above named facility licensee is using 1 simulation facility consisting solely of a plant-referenced simulator that meets the requirements of 10 CFR 55.45.
2. Documentation is available for NRC review in accordance with 10 CFR 55.45(b).
3. This simulation facility mots the guidance contained in ANSI/ANS 3.5, 1985, as endorsed by NRC Regulatory Guide 1.149.

If there are any exceptions to the certification of this item, check here [XI and describe fully on additional pages as necessary.

NAME (or ath11r idMttificatian) AND LOCATION OF SIMULATION FACILITY MIDLAND TRAINING CENTER .

324'9 E GORDONVILLE ROAD MIDLAND, MI 48640 X I SI MU LATION FACILITY PER FOR MANCE TEST ABSTRACTS ATTACH ED. (Far performance tests conduct<</ in the period ending with th11 dat* of thi* C#tiflcation)

DESCRIPTION OF PERFORMANCE TESTING COMPL:::: .~D (Attach additional Pllf/fl(s) s nec-.ry, and id11ntify th11 it11m dncription being continu9d}

SEE ATTACHED: REAL TIME, STEADY STATE, NORMAL OPERATION, TRANSIENT AND MALFUNCTION TEST ABSTRACTS X

I SIMULATION FACILITY PERFORMANCE TESTING SCHEDULE ATTACHED. (Far th11 conduct of approxim11t11ly 25% of p11rform11nce tllSts,,., y*r for t/M four y -

fHriod comm111Cin11 with th* dat11 of this cllffiflcatian.J OESCR IPTION OF PERFORM AN CE TESTING TO BE CONDUCTED. (Attach additional pafltl(s) as nectlSSlry, and identify thtl itt1m dlJSCription being continulld)

SEE ATTACHED PERFORMANCE TEST SCHEDULE X I PERFORMANCE TESTING PLAN CHANGE. (For *nY modification to a p11rform11nce trnting plan submittlld an a previous e11rrificatian)

DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Att<<h addition*/ pag11(s) as necllSSllry, and identify roe it11m dt!SCriptian being cantinulldJ NOT APPLICABLE XI R ECERTI FICATION (DtlSl:ri1- cotrW:tivuctions takm, attl/Ch mu/ts of camplt1tlld pfJrfarm11nct1tming in accor .'~ce with 10 CFR § 55.45(b)(5)1v).

Attach additionel page(*) n ,,_,,,,Mid idmtlfy th* it1m dnt:riptian being continulld.J NOT APPLICABLE SIGN~I) REPRESENTATIVE l

I "I 11 jTITLE

  • a.

Any false stat1ment or omiuion in this document, including attachmenu, may be subject to civil and criminal sanctions. I certify under penalty of perjury that thl information in thi1 docum1nt and 1tt1ehm1nu i1 tru1 and corrlCt.

Vt~ /u.~cL.-t-- Ylu~c:f) ~11-Cfo 1DATE In acc:ordance with 10 CFR'"'§ SN, Communication1, thl1 form shall be submitted to the NRC as follows:

BY MAIL ADDRESSED TO: Dil9Ctar, Office of NuclNr RIKIDr R19ulation U.S. Nudur Rqulmry Commluion BY DEt.IVERY IN PERSON TO THE NRCOFFICE AT:

One Whltw Flint Nonh 1151515 Roc:kwille Pille Wllhktgcon, DC ZClll5I Rodlwilll,,.,

NRC FO ..M 47411-801

'NRc'F1~RM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315CMl138 EXPIRES: 9-3Q.92 11.aol **

10 CFR 55.'4is(bl, . ESTIMATED BURDEN PEA RESPONSE TO COWLY WITH THIS 55.4-66.5 INFORMATION COLLECTION REQUEST: 120 HRS. FORWARD SIMULATION FACILITY CERTIFICATION COMMENTS REGARDING BURDEN ESTIMATE TO THE INFOR*

MATION ANO RECORDS MANAGEMENT BRANCH (MNl8 77141, U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON DC 20565, AND TO THE PAPERWORK REDUCTION PROJECT c:i1110-0138), OFFICE OF MANAGEMENT. AND BUDGET, WASHINGTON, DC 20503.

INSTRUCTIONS. This form is to b* filed for initial certification, recertification (if required), and for any change to a simulation facility performance-testing plan made after initill submitt1I of such a pl1n. Provide th* following information, and check the appropriate box to indicate reason for submittal.

FACILITY IDOCKET NUMBER PALISADES NUCLEAR PLANT 50- 255 LICENSEE jDATE CONSUMERS POWER COMPANY 6/11/90 This is to certify that:

1. The above n1med f1eility licensee is using 1 simul1tion facility consisting solely of a plant*referenced simulator that meets the requirements of 10 CFR 55.46.
2. Oocum1nt1tion is aV1i11ble for NRC review in accordance with 10 CFR 55.45(b).
3. This simulation facility meets the guidance contained in ANSI/ANS 3.5, 19B5, as endorsed by NRC Regulatory Guide 1.149.

If there ere 1ny1xceptions to the certification of this item, check here [XI and describe fully on additional pages as necessary.

NAME (orothtridMtificatian) ANO LOCATION OF SIMULATION FACILITY MIDLAND TRAINING CENTER .

3249 E GORDONVILLE ROAD MIDLAND, MI 48640 XI SIMULATION FACILITY PERFORMANCE TEST ABSTRACTS ATTACHED. (For performancetf!Sts conduct<</ in the p11riod ending with the d** of thi1 CMifk:atlon)

DESCRIPTION OF PERFORMANCE TESTING COMPLf:: * ~D (Attach additional page(s) as necesary, and identify the item dncriprian being continued)

SEE ATTACHED: REAL TIME, STEADY STATE, NORMAL OPERATION, TRANSIENT AND MALFUNCTION TEST ABSTRACTS I SIMULATION FACILITY PERFORMANCE TESTING SCHEDULE ATTACHED. (For the conduct of approximat11ly 25'16 of p*rformancetests,,.ry*r for the foury-X period comm1111Cing with th* dat* of thi11 certification.)

OESCRIPTION OF PERFORMANCE TESTING TO BE CONDUCTED. (Attach ildditional page(s) as neceaary, and identify thtl it11m d11S1Criptian blling continuad)

SEE ATTACHED PERFORMANCE TEST SCHEDULE X I PERFORMANCE TESTING PLAN CHANGE. (Far any modification ta a performance ttllting plan submftt~ on a previous certifiC11tion)

DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Attech additional page(s) Bil MCt1111111ry, and idt1ntify r~e itt1m dincriprion blling continued}

NOT APPLICABLE XI RECERTI Fl CATION (0.:riM eotret:tiveetlonuu.,,, aruch muhs of comp/et<</ pllfformance testing in accor:* ,,,c,, with 10 CFR § 55.45(b)(5)/llJ.

Attach additional pa~(*) 11 ,,_l'"f, and identify th* itlffl dnt:riptian being continutld.)

NOT APPLICABLE a.

Any false stat1m*nt or omiaion in this docum1nt, including attachmenu, may be subject to civil and criminal sanctions. I certify under pen11ty of perjury that the information in this dociument and 1tt1ehment1 is true md correct. .

SIGN~I REPRESENTATIVE jTITLE IDAT&

l I "'I 11.

Vt<!.J.. ~~- Ylu~ep b-11-Cfo In ICCOrdance with 10 CFR'"§ ! M, Communications, this form shill be submitted to the NRC as follows:

BY MAILAODRE$SED*TO: Dinctor, Office of Nuc:INr Ruc:Ulr Regulation BY OEt.IVERY IN PERSON '

One Whitw Flint Nardi U.S. Nudar Rqulnlry Commlaion TO THE NRCOFFICE AT: 111i116 Rocnille Pille WaaltlnglOll, DC ZOl5l5I Rodlwille,1111)

NftC FO..M 474 11 <<II

NRC'~ORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315()-0138 (1.001 ** -EXPIRES:~

  • 10.CFR 55'.46lbl, ESTIMATED BURDEN PER RESPONSE TO CO... LY WITH THIS 515.4 .,d 56.5 INFORMATION COLLECTION REQUEST: 120 HRS. FORWARD SIMULATION FACILITY CERTIFICATION COMMENTS REGARDING BURDEN ESTIMATE TO THE INFOR*

MATION ANO RECORDS MANAGEMENT BRANCH IMNllll 77141 U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, oC 20555, ANO TO THE PAPERWORK REDUCTION PROJECT (3150-0138), OFFICE OF MANAGEMENT ANO BUDGET, WASHINGTON, DC 20503.

INSTRUCTIONS. This form is to b* filed for initial certification, recertification (if required), and for any change to a simulation facility performance testing plan made after initial submitUI of such a plan. Provide the following information, and check the appropriate box to indicate reason for submittal.

FACILITY IDOCKET NUMBER PALISADES NUCLEAR PLANT 50- 255 LICENSEE jDATE CONSUMERS POWER COMPANY 6/11/90 This is to certify that:

1. The abov* named facility licensee is using a simul1tion facility consisting solely of a plant-referenced simulator that meets the requirements of 10 CFR 55.45.
2. Documantltion is available for NRC review in accordance with 10 CFR 55.45(b).
3. This simulation facility meets the guidance contained in ANSI/ANS 3.5, 1985, as endorsed by NRC Regulatory Guide 1.149.

If there are any exceP1ions to the certification of this item, check here [X ] and describe fully on additional pages as necessary.

NAME (or oth*r idmtifiClltion} AND LOCATION OF SIMULATION FACILITY MIDLAND TRAINING CENTER .

3249 E GORDONVILLE ROAD MIDLAND, MI 48640 X I SIMULATION FACILITY PERFORMANCE TEST ABSTRACTS ATTACH ED. (For pt1rformanct1 t~s conducttld in tht1 pt1riod t1nding with the d<<* of th;. cwtiflationJ DESCRIPTION OF PERFORMANCE TESTING COMP LE* ::D (Attach additio,,./ paga(s) as nec-f'/, and idt1ntify tht1 itt1m dt1$Cription bt1ing contlnusdJ SEE ATTACHED: REAL TIME, STEADY STATE, NORMAL OPERATION, TRANSIENT AND MALFUNCTION TEST ABSTRACTS X

I SIMULATION FACILITY PERFORMANCE TESTING SCHEDULE ATTACHED. (For tht1 conduct of approximatt1/y 25% of parfo""a~ tt!Stl per y*r for tha four y -

parlod Cf1mmtl!'ICing with th* date of this cartification.J IJESCRIPTION OF PERFORMANCE TESTING TO BE CONDUCTED. (Attach additional pag11(1} as nt1C6S$11fY, and idenrify tht1 itt1m description btling<:f1ntinul!ldJ SEE ATTACHED PERFORMANCE TEST SCHEDULE XI PERFORMANCE TESTING PLAN CHANGE. (For *nY modification to a p11rfo""anc11 t~ing plan submitttld on a previou:s Ctlrtification}

DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Attach addition*/ p~(rJ as MCllSSllf'/, and identify t'>e itt1m description being continul!ldJ NOT APPLICABLE X I RECE RTI Fl CATION (0.:riM corrw:tiv. actiofll takm, mach resuln of complllttld pllrfo""anct1 tming in accor :* wc11 with 10 CF R § 55.45(bJ(5}111}.

AttllCh addition*/ paga(sJ n ,,_t'/, and idlntify th* itmi das:ription being Cf1ntinul!ld.J NOT APPLICABLE Any false statement or omission in this document, including attachments, may be subject to civil and criminal sanctions. I certify under penalty af perjury that the information in

&.A-t~~-Ylu~ep*

this docum11nt and attachments is true nnd correct.

SIGN~!> REPRESENTATIVE jTITLE jDATE l

}I ~* ~

ll Vt<!.J... b-11-~o In acconhlnce with 10 CFR""§ 5M, Communications, this form shall be submitted to the NRC as follows:

BY MAIL AODRE~ED TO: Dll'KtOr, Office of Nuclear R - r Regulation BY DEt.IVERY IN PERSON '

One White Flint Nord!

U.S. Nudar Regulatory Commlaion TO THE NRC OFFICE AT: 11 !iii& Rocbllhl Pille W..nlnQlon, DC ZOll&I Aoc*willa, re Nl'IC FOAM 474 I 1-801