05000255/LER-2013-001, Regarding Technical Specification Required Shutdown Due to a Component Cooling Water System Leak

From kanterella
(Redirected from 05000255/LER-2013-001)
Jump to navigation Jump to search
Regarding Technical Specification Required Shutdown Due to a Component Cooling Water System Leak
ML13100A019
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/09/2013
From: Vitale A
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PNP 2013-023 LER 13-001-00
Download: ML13100A019 (5)


LER-2013-001, Regarding Technical Specification Required Shutdown Due to a Component Cooling Water System Leak
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)

10 CFR 50.73(a)(2)(ii)(8)

10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(8)

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(8)
2552013001R00 - NRC Website

text

,.

~Entergy PNP 2013-023 Apri19,2013 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Technical Specification Required Shutdown Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Anthony J. Vitale Site Vice President Due to a Component Cooling Water System Leak Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Dear Sir or Madam:

Licensee Event Report (LER) 2013-001 is enclosed. The LER describes the discovery of a component cooling water system leak that required a plant shutdown to repair.

This LER is being submitted in accordance with 10 CFR 50.73(a)(2)(i)(B), for an operation or condition which was prohibited by the plant's Technical Specifications and 10 CFR 50.73(a)(2)(i)(A), for the completion of a plant shutdown required by Technical Specifications.

This letter contains no new commitments and no revisions to existing commitments.

Sincerely, ajv/tad Attachment: LER 2013-001, Technical Specification Required Shutdown Due to a Component Cooling Water System Leak CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

ATTACHMENT LER 2013-001 TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO A COMPONENT COOLING WATER SYSTEM LEAK 3 Pages Follow

NRC FORM 366 APPROVED BY OMB NO. 3150-0104 EXPIRES 10/31/2013 U.S. NUCLEAR REGULATORY COMMISSION (10-2010)

, the NRC (See reverse for re~ulred nUmbe{lof may not conduct or sponsor, and a person is not required to respond to, the information collection.

diaitslcharacters or each block 13* PAG 1

E PALISADES NUCLEAR PLANT 05000255 OF 3

4. TITLE Technical Specification Required Shutdown Due to a Component Cooling Water System Leak
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED YEAR I SEQUENTIAL I REV FACILITY NAME DOCKET NUMBER MONTH DAY YEAR NUMBER NO MONTH DAY YEAR FACILITY NAME DOCKET NUMBER 02 14 2013 2013 -

001 - 00 04 15 2013

19. OPERATING 1\\ lODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) 0 20.2201(b)

D 20.2203(a)(3)(i)

D 50.73(a)(2)(i)(C) o 50.73(a)(2)(vii) 1 0

20.2201(d) o 20.2203(aX3)(ii) o 50.73(a)(2)(ii)(A) o 50.73(a)(2)(viiiXA) 0 20.2203(a)(1 )

o 20.2203(a)(4)

D 50.73(a)(2)(ii)(8)

D 50.73(aX2)(viii)(8) 0 20.2203(a)(2)(i)

D 50.36(cX1Xi)(A) 0 50.73(a)(2Xiii) o 50.73(aX2)(ix)(A)

10.

~._.. LEVEL 0

20.2203(a)(2)(ii)

D 50.36(c)(1 )(iiXA) 0 50.73(a)(2)(iv)(A) o 50.73(a)(2)(x) 0 20.2203(a)(2)(iii) o 50.36(c)(2) 0 50.73(a)(2)(v)(A) o 73.71(a)(4) 100 0

20.2203(aX2)(iv) o 50.46(aX3Xii)

D 50.73(a)(2)(v)(8)

D 73.71(a)(5) 0 20.2203(a)(2)(v)

~ 50.73(a)(2)(i)(A)

D 50.73(a)(2)(v)(C) o OTHER 0

20.2203(a)(2)(vi}

~ 50.73(a)(2)(i)(8) 0 50.73(a)(2)(v)(D)

Specify in Abstract below or in 12. LICENSEE CONTACT FOR THIS LER FACILITY NAME I

TELEPHONE NUMBER (1(;~e~e~C;~_2049 Otto Gustafson Licensing Manager CAUSE SYSTEM COMPONENT MANU-REPORTABLE

CAUSE

SYSTEM COMPONENT MANU-REPORTABLE FACTURER TO EPIX FACTURER TO EPIX X

CC HX 1055 Y

14. SUPPLEMENTAL REPORT EXPECTED
15. EXPECTED I MONTH I DAY YEAR 0

YES (If yes, complete 15. EXPECTED SUBMISSION DATE)

~ NO SUBMISSION I

I DATE ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines On February 10, 2013, due to a slowly lowering level trend in the component cooling water (CCW) surge tank, investigations began to identify a potential CCW leakage path. On February 14, 2013, at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br />, the right train of the CCW system was declared inoperable due to the identification of an approximate 40 gallons per hour CCW leak into the service water system section of the "A" CCW heat exchanger. The "A" CCW heat exchanger is one of two essentially identical ASME Section III class 3 heat exchangers installed in the CCW system.

Technical Specification 3.7.7.A.1 requires restoration of an inoperable CCW system train within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Due to the inability to repair the leak within the required 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> time frame, a plant shutdown was initiated at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on February 15, 2013. The plant entered Mode 3 at 1649 hours0.0191 days <br />0.458 hours <br />0.00273 weeks <br />6.274445e-4 months <br /> on February 15, 2013. At 1111 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.227355e-4 months <br /> on February 16, 2013, the plant entered Mode 5 to execute repairs.

The majority of CCW leakage was attributed to one tube, located in the center of the tubesheet, within the CCW heat exchanger. Very minor leakage was identified from the tube plug area of seven previously plugged tubes. Due to the inability to fully isolate CCW system flow into the heat exchanger, the failed tube could not be inspected to determine a definitive failure mechanism.

Mechanical type tube plugs were installed in the tubes where leakage was identified.

NRC FORM 366 (10-2010) u.s. NUCLEAR REGULATORY COMMISSION (10-2010)

1. FACILITY NAME PALISADES NUCLEAR PLANT

EVENT DESCRIPTION

LICENSEE EVENT REPORT (LER)

CONTINUATION SHEET

2. DOCKET YEAR 05000255 2013
6. LER NUMBER I

SEQUENTIAL IREVISION NUMBER NUMBER 001 00

3. PAGE 2

OF 3

In Mode 1 at 100% power, on February 10, 2013, due to a slowly lowering level trend in the component cooling water [CC] (CCW) surge tank, investigations began to identify a potential CCW leakage path. On February 14, 2013, at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br />, the right train of the CCW system was declared inoperable due to the identification of an approximate 40 gallons per hour CCW leak into the service water (SW) system [BI]

section of the "A" CCW heat exchanger [HX]. The majority of CCW leakage was attributed to one tube, located in the center of the tubesheet, within the CCW heat exchanger. Very minor leakage was identified from the tube plug area of seven previously plugged tubes. No additional structures, components, or systems were inoperable or contributed to the event at the time of discovery.

Technical Specification (TS) 3.7.7.A.1 requires restoration of an inoperable CCW system train within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Due to the inability to repair the leak within the required 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> time frame, a plant shutdown was initiated at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on February 15, 2013. The plant entered Mode 3 at 1649 hours0.0191 days <br />0.458 hours <br />0.00273 weeks <br />6.274445e-4 months <br /> on February 15, 2013. At 1111 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.227355e-4 months <br /> on February 16, 2013, the plant entered Mode 5 to execute repairs.

This condition is reportable in accordance with 10 CFR 50.73(a)(2)(i)(A) for the completion of a plant shutdown required by TS.

The right train of the CCW system was subsequently determined to have been inoperable since January 30, 2013, when the CCW surge tank first exhibited a lowering level trend. Therefore, this condition is reportable in accordance with 10 CFR 50.73(a)(2)(i)(B) for an operation or condition which was prohibited byTS.

BACKGROUND The CCW System provides a heat sink for the removal of process and operating heat from safety related components during a design basis accident or transient. During normal operation, the CCW system also provides this function for various nonessential components. The "A" CCW heat exchanger is one of two essentially identical ASME Section III class 3 heat exchangers installed in the CCW system. The heat exchangers are straight tube, fixed tube-sheet, and arranged for single pass flow in both shell and tube side passages with CCW on the shell side and SW on the tube side. The CCW heat exchangers are original equipment and have been in service since the original plant start-up.

In 1990, in response to Generic Letter 89-13, the inspection frequency was aligned such that both heat exchangers would be inspected every refueling outage for three consecutive outages, alternating inspections of the heat exchangers each refueling outage thereafter. Inspections and maintenance consisted of 100% cleaning, eddy current testing of all the tubes that are susceptible to flow induced vibrational damage (outside 8 columns of the tubesheet), eddy current testing a sample of the rest of the tubes, thermal performance testing, and sampling/analyzing for biofouling.

Prior to 1996, the CCW heat exchangers were subjected to high CCW flow rates. Consequently, tube failures resulted from vibration and fretting in the region near the shell side inlet. Failed tubes in this region (in the corners of the support plates) were plugged and the CCW flow rate through the heat exchangers was restricted to reduce the potential for this failure mechanism. As a result, the flow induced vibration damage stabilized.

CCW heat exchanger inspections continued as scheduled until 2010. In 2010, the "A" CCW heat exchanger was not inspected as scheduled. The inspection was deferred to the 2012 refueling outage based on the results of past performance and eddy current testing. Again in 2012, the "A" CCW heat exchanger was not inspected as scheduled. The inspection was deferred to the 2013 refueling outage U.S. NUCLEAR REGULATORY COMMISSION (10-2010)

1. FACILITY NAME PALISADES NUCLEAR PLANT LICENSEE EVENT REPORT (LER)

CONTINUATION SHEET

2. DOCKET
6. LER NUMBER YEAR I

SEQUENTIAL IREVISION NUMBER NUMBER 05000255 2013 001 00

3. PAGE 3

OF 3

based on the results of past performance and eddy current testing. The most recent inspection and maintenance of the "An CCW heat exchanger was in 2007. During the 2007 inspection, 784 tubes (38.8%)

were eddy current tested and 100% of the tubes were cleaned. One tube was plugged due to the indication of some outside diameter damage, approximately 60% wall loss, caused by fretting at the support plate.

Review of the data from the previous inspection, performed in 2004, showed the indication was not present at that time. Even though the indication was determined to be less than the 70% wall loss criteria for tube plugging, the tube was plugged as a precautionary measure. This was the first CCW heat exchanger tube that required plugging since 1996 when CCW flow rates were reduced following the discovery of vibrational damage.

CAUSE OF THE EVENT

Due to the inability to fully isolate CCW system flow into the heat exchanger, the failed tube could not be inspected to determine a definitive failure mechanism. A failure modes analysis determined probable failure mechanisms, but none could be verified. The results of an evaluation for organization and programmatic issues determined the heat exchanger program, developed in part as a response to Generic Letter 89-13, was not designed to discover random failures of CCW heat exchanger tubes. Additionally, periodic assessments of the heat exchanger program did not use adequate rigor when looking for best practices within the industry. Operating experience was not utilized to identify new potential failure modes.

CORRECTIVE ACTIONS TAKEN Mechanical type tube plugs were installed in the tubes where leakage was identified.

CORRECTIVE ACTIONS TO BE TAKEN The inspection scope for both CCW system heat exchangers will be changed to include eddy current testing 100% of the tubes each inspection. The frequency of inspections will be modified to ensure both CCW system heat exchangers are appropriately maintained.

ASSESSMENT OF SAFETY CONSEQUENCES

The CCW leak into the SW system section of the "An CCW heat exchanger did not challenge radiological or nuclear safety. Even though the leak necessitated a TS required plant shutdown due to a right train of the CCW system being declared inoperable, the CCW system maintained the ability to provide 100%

post-accident cooling, as required by TS 3.7.7, during the period between January 30, 2013, and February 14, 2013. Therefore, no event or condition existed that could have prevented fulfillment of a safety function.

PREVIOUS SIMILAR EVENTS

None