ML20134J665

From kanterella
Jump to navigation Jump to search
Advises of Planned Insp Effort Resulting from Plant Performance Review.Six Months Insp Plan Encl
ML20134J665
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/07/1996
From: Belisle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 9611150325
Download: ML20134J665 (7)


Text

.. -- .- .. - ,.- .~ .- ., .- -.

l l i

!*wember 7,1996 i

l South Carolina Electric & Gas Company  !

ATTN: Mr. Gary J. Taylor l Vice President. Nuclear Operations l Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville. SC 29065 ,

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - SUMMER

Dear Mr. Taylor:

On October 4.1996, the regional staff completed the semiannual Plant  !

Performance Review (PPR) of Summer. The staff conducts these reviews for all  ;

operating nuclear power plants to develop an integrated understanding of i safety performance. The results are used by regional management to facilitate l' planning and allocation of inspection resources. The PPR for Summer involved the participation.of all technical divisions in evaluating inspection results i and safety performance information for the period from March 1996 through August 1996. PPRs provide regional management with a current summary of licensee 3erformance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews:. j This letter advises you of our planned inspection effort resulting from the Summer PPR review. It is provided in an attempt to minimize the resource-  !

impact.on your staff and to allow for scheduling conflicts to be resolved in advance of inspection dates. The enclosure presents our inspection plan for the next six months. Specific dates are-included'for near term inspections.  !

Long term inspection dates will be announced prior'to the inspections and any i' scheduling conflicts will be resolved with your staff. The rational or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for em)hasis in these program areas. Resident inspections are not listed due.to t1eir ongoing and continuous nature, nor are ,

region based inspections which accomplish Resident Core Modules to compensate for Resident Inspector absences due to training.

During each NRC inspection planned during this period, specific attention will continue to be given to the verification of selected Updated Final Safety Analysis Re) ort-(UFSAR) commitments. Applicable portion (s) of the UFSAR that relate to tie inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant-

. practices. procedures and/or parameters.

+

9611150325 961107 PDR ADOCK 05000395 l

, G PDR  :

  1. a

SCE&G 2 We will inform you of any changes to the inspection plan. If you have any questions, please contact G. A. Belisle at (404) 331-4196.

Sincerely.

Original signed by George A. Belisle George A. Belisle. Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No. 50-395 License No. NPF-12

Enclosure:

Inspection Plan cc w/ encl:

R. J. White Nuclear Coordinator (Mail Code 802)

S.C. Public Service Authority c/o Virgil C. Summer Nuclear Station  ;

P. O. Box 88 l Jenkinsville. SC 29065 l l

I J. B. Knotts, Jr.. Esq. I i Winston and Strawn 1400 L Street. NW j Washington D. C. 20005-3502 l Chairman  !

Fairfield County Council l l P. O. Drawer 60 l l Winnsboro. SC 29180 l l

l Virgil R. Autry. Director Radioactive Waste Management Bureau of Solid and Hazardous l

Waste Management l S. C. Department of Health l and Environmental Control 2600 Bull Street Columbia. SC 29201 cc w/ encl continued: See page 3 I

4 SCE&G 3 cc w/ encl: Continued R. M. Fowlkes. Manager Operations (Mail Code 303)

South Carolina Electric & Gas Company

~

Virgil C. Summer Nuclear Station P. O. Box 88

,Jenkinsville. SC 29065 April Rice,. Manager Nuclear Licensing & Operating Ex)erience (Mail Code 830)

Sout1 Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville. SC 29065

. Distribution w/ encl:

A. Johnson. NRR R. Gibbs. RII P. Fillion. RII D. Jones. RII W. Stansberry. RII C. Payne, RII G. Hallstrom. RII PUBLIC-NRC Resident Inspector  !

U.S. Nuclear Regulatory Commission <

Route 1. Box 64 Jenkinsville. SC 29065 I

  • See previous concurrence - attached 0FFICF PIf DPS Pff DRS Rif-DPS Pff OP9 Pff 099 Pff OPP SIGNATURE * * * *
  • NAME CChristensen Pfredrickson CCasto KBarr TPeebles EMerschoff DATE 10 / /% 10 / /% 10 / /% 10 / / 96 10 / / 96 10 / / 96 COPY? YES NO VES NO YES NO YES NO YES NO VES NO

{

UFFALIAL KLLUKU LUFY DULUMLN1 h/flE: 6: blNFK. .iR l l

l

SCE&G 3 cc w/ encl: Continued R. M. Fowlkes. Manager Operations (Mail Code 303)

South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville. SC 29065 April Rice. Manager Nuclear Licensing & Operating Ex)erience (Mail Code 830)

Sout1 Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville. SC 29065 Distribution w/ encl:

A. Johnson. NRR R. Gibbs RII P. Fillion. RII D. Jones. RII W. Stansberry. RII C. Payne, RII G. Hallstrom. RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Co ission Route 1. Box 64  !

l Jenkinsville. SC 29065 i

I I  !

I l

i i

Orritt p;; pos! pt; Opg pti poq pit pps p!f gas ,

V Q [{

NAME CC isiensen rickson #Mto KS TP ebles DATE 10 / M / 96 10 / / 96 10 / N / 96 10 / / 96 10 / / 96 10 / / 96 CDPf? [kf/ N3 KS) NO YES NO D NO [ES f NO YES NO Orr ICIAL WORD CuFy DOCUMENT NAMt; 6: uuMr'Pk..in V I

i l

SUMMER ,

INSPECTION PLAN INSPECTION PROCEDURE / TITLE / PROGRAM AREA NUMBER OF PLANNED INSPECTION TYPE OF INSPECTION TEMPORARY INSTRUCTION INSPECTORS DATES IP 64704 FIRE PROTECTION 1 10/14-18/96 CO PROGRAM IP 37550 ENGINEERING 2 10/14-18/96 CO - INCLUDES 10/21-25/96 RESOLUTION OF LEAKS / TRANSIENTS IN PIPING SYSTEMS, MODIFICATIONS.

50.59. FSAR. AND REVIEW CONTROL ROOM INSTRUMENTS (GREEN BANDS)

IP 71714 COLD WEATHER 1 NOVEMBER 1996 RI PREPARATIONS IP 62700 MAINTENANCE 1 12/9-13/96 RI - MAINTENANCE PROGRAM AND TESTING OF THE IMPLEMENTATION SAFE SHUTDOWN PANEL 1 ENCLOSURE

SUMMER INSPECTION PLAN INSPECTION PROCEDURE / TITLE / PROGRAM AREA NUMBER OF PLANNED INSPECTION TYPE OF INSPECTION TEMPORARY INSTRUCTION DATES IP 84750 RADI0 ACTIVE WASTE 1 1/27-31/97 C0 TREATMENT. &

EFFLUENT &

ENVIRONMENTAL MONITORING IP 86750 SOLID RADI0 ACTIVE WASTE MANAGEMENT &

TRANSPORTATION OF RADI0 ACTIVE MATERIALS TI 2515/133 IMPLEMENTATION OF REVISED 49 CFR PARTS 100-179 & 10 CFR PART 71 IP 62700 MAINTENANCE 1 1/27-31/97 RI - ELECTRICAL PROGRAM MAINTENANCE IMPLEMENTATION REACTOR TRIP BREAKERS TI 2515/109 INSPECTION 2 3/3-7/97 SI REQUIREMENTS FOR GL 89-10 SAFETY RELATED MOTOR OPERATOR VALVE TESTING AND SURVEILLANCE 2 ENCLOSURE i __ _ _ _ _ _ _ _ _ . . . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _

SUMMER INSPECTION PLAN INSPECTION PROCEDURE / TITLE / PROGRAM AREA NUMBER OF PLANNED INSPECTION TYPE OF INSPECTION TEMPORARY INSTRUCTION DATES OSRE OPERATIONAL 7 3/3-7/97 RI SAFEGUARDS

RESPONSE

EVALUATION IP 83750 OCCUPATIONAL 2 3/17-21/97 C0 RADIATION EXPOSURE IP 71001 LICENSED OPERATOR 1 APRIL 1997 C0 REQUALIFICATION PROGRAM EVALUATION 3 ENCLOSURE