DOCKET 50-305 KEWAUNEE NUCLEAR POWER PLANT

SUMMARY

OF OPERATING EXPERIENCE DECEMBER, 1984 OP ER ATIO NS: On December 2, unit load was reduced to 72% for performance of the monthly Turbine Stop Valve test. The unit was returned to full power operation the same day.

MAINTENANCE: Rebuilt a Service Water pump motor.

Replaced a lower motor bearing on a Service Water pump motor.

Replaced four leading U bends on a Containment Fan Coil Unit.

Rebuilt a Foxboro resistance to current converter.

2fl LB

\ g 8501160593 841231 PDR ADOCK 05000305 R PDR

A YERAGE DA ILY UNIT POW ER LEVEL DOCKET No- 50-305 UNIT- KEWAUNEE

, COMPLETED BY- G. H. BUITER TELEPHONE- 414-388-2560 X225 REPORT MONTH DECEMBER, 1984 AVERAGE DAILY DAY POWER LEVEL (HWE-NET) 1 521 2 501 3 521 4 521 5 517 6 525 7 521 8 521 9 517 10 525 11 521 12 517 13 521 14 522 15 521 16 522 17 521 18 526 19 521 20 517 21 526 22 521 23 521 24 517-25 517 26 521~

27 522 28 517 29 526 30 521 31 521 W

A .

O < j UN IT SHUTD0 5 NS AND PO NER R EDDCTIONS -

DOCIET 50: 50-305 ,J UNIT NAME: Kevaunee DATE: January 2, 1984 COMPLETED BY: G. H. Buiter J TELEPHONE: 414-389-2560 x225 O

REPORT MONTH - DECEEDER, 1984 g

l NO. l DATE l TYPE l DURATION l REASON l METHOD lLERNU3BEP lSYS l COMPONENT l COMMENTS l 3 l l l l l l l l l 1 I I I I I I I I I I I 1 I I I i 1 1 I i 1 No shutdowns or power reductions in December. I J l 1 I I i 1 1 I I I I I I I I i 1 1 I I I I I I I i 1 1 I I i 1 I J l i I I I i 1 I I I I I I I I I I I I I I i 1 1 1 I I I I I I I I J l i I i i i I I I I I I I I I I 1 1 I I I I 1 I I I i i i I i 1 8 >

I I I i 1 1 I I I I I I I I I I I I I I I I

+ 1 1 1 1 1 I I I I I I V i 1 1 i i i I I i a i I i 1 I I i i i I i i 1 1 1 1 I I I I I I I O I i 1 1 1 1 I I I I I I I I I I I I I I I I I 1 1 I I l i I I I I O I I I I i i i 1 I I I I I I I I I I I I I I 1 1 I I I I I i 1 I I J l I I i 1 1 1 I I I I I I i 1 1 1 I I I I I I I i 1 1 1 I 1 I I i >

I I i 1 1 1 I I I I I I i l l  ! I I l l l l I I i 1 1 I I i I I I J l 1 I I I I I I I I I I I I I I I. I I

, e . . . .I . .I . . .I >

TYPE RE ASON RETHOD SYSTER S C05PONENT CCDES F: Forced A-Equipment Failure (Explais) 1-5anual From WDREG-0161 S: Scheduled B-Maintenance or Test 2-sanual Scras

- C-Befueling 3-Automatic Scras N D-Regulatory Bestrictica 4-Continuations E-operator Trainiaq & License Examination 5-Load Beductions

  • F- Administra tive 9-Other O G-operational Error (Explais)

H-Other (Explais) g

E)

  • OPFRATING DATA REPORT O DOCERT NO- 50-305 * >

COMPLETED BI- G. H. BUITER .

OPERATIEG STATUS TELEPHONE- 414-388-2560 1225 l

, 1 U4IT Wait REW AUREE **********************************************

l- e e )

2 REPOPTI1G PERIOD D EC EM B E R, 1984

  • NOTES
  • 3 LICENSED THERNAL POWER (MWT) 1650
  • Normal power operation continued
  • II
  • throu9h this reporting period.
  • 4 N AM EPLATE R ATING (GROSS MUE) 560 * *

- *

  • O

! 5 DESIGN ELECTRIC AL R ATING (NET MWE) 535 *

  • l 6 MAIIMUS DEFERDAELE CAPACITY (GROSS MWE) 529 )

7 M AIISUN DEPENDABLE CAPACITY (EET RWE) 503 **********************************************

)

8 IF CHANGES OCCUB 15 CAPACITI BATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS Ro ne

- J l 9 POW FR LEVEL TO WHICH RESTRICTED, IF ANY (5 ET BU E) Bone 1- )

13 REASONS FOR RESTRICTIONS, IF ABI

~ )

THIS MONTH TR-TO-DATE CUMULATIVE iw m) 11 HOURS IN REPORTING PERICD 744 8784 92449 l

l -- 12 RU5BER OF HOURS REACTOR W AS CRITICAL 744.0 7570.6 78750.5 II 13 R! ACTOR RESERVE SUUTDOWN HOURS 0.0 0.0 2330.5 14 HOURS GEN ER ATOR O D-LINE 744.0 7528.3 77340.7

- 15 U1IT RESERTE SUTDOWN HOURS 0.0 0. 0 10.0 J 16 GROSS THERM AL ENERGT GENERATED (Rus) 1222229 12096038 121067124 l 17 GPOSS ELECTRTCAL EWERGY GENER ATED (598) 405400 3999200 39857300

! '- 18 E ET ELECTRICAL EWF'4T GENER ATED (RUS) 387201 3910000 37942036 >

19 UNIT SERVICE FACTC: 100.0 85.7 83.7 1

~- )

l 20 UNIT AVAILABILITY FACTOR 100.0 85.7 83.7 s- 21 UNIT CAPACITY FACTOR (USING HDC NET) 103.5 86.2 79.1 J 22 UNIT CAPACITT F ACTOR (USING DER NET) 97.3 81.1 76.7 U

! 23 UsIT FORCED OUTAGE BATE 0.0 0.2 3.6 b" 24 SEUTD0653 SCHEDULED OYER NEIT 6 505T85 (TYPE, D ATE, AND DURATION OF EACH) II Refueling sketdown of D-week duration scheduled to start Febcaary 15, 1985.

25 IF SMUT D03E AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP - N/A kh

[

l l

. . . . NRC-85-3 WlSCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, WI 54305 January 10, 1985 Director, Office of Inspection and Enforcement Attention Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The narrative " Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for December 1984 are enclosed in accordance with Technical Specification 6.9.1(c).

Very truly yours, D. C. Hintz Manager - Nuclear Power JGT/js Enc.

cc - Mr. J. G. Keppler, Reg Adm US NRC - Region III Mr. Robert Nelson, NRC Sr Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 Mr. S. A. Varga, Chief US NRC - Div. of Licensing INP0 Records Center, Suite 1500, 1100 Circle 75 Parkway, Atlanta, GA 30339