UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 28, 2018 Dennis R. Madison Vice President Southern Nuclear Operating Company, Inc.

Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000348/2017006 AND 05000364/2017006, 05000348/2017402 AND 05000364/2017402, 05000348/2017501 AND 05000364/2017501

Dear Mr. Madison:

The Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Joseph M. Farley Nuclear Plant Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that the overall performance at your facility preserved public health and safety.

The NRC determined the performance at Joseph M. Farley Nuclear Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

D. Madison 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (404) 997-4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Alan Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8

Enclosure:

Farley Inspection/Activity Plan cc Distribution via ListServ

ML18059A153 OFFICE RII/DRP RII/DRP NAME DMas-Penaranda ABlamey DATE 2/8/2018 2/8/2018 IP 22 Inspection Activity Plan Report Farley 03/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count UNIT 1 IN-SERVICE INSPECTION 1 1 04/09/2018 04/13/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL - WEEK 1 3 1, 2 04/09/2018 04/13/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/09/2018 04/13/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/09/2018 04/13/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/09/2018 04/13/2018 IP 71124.04 000728 Occupational Dose Assessment 1, 2 04/09/2018 04/13/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 04/09/2018 04/13/2018 IP 71151 000746 Performance Indicator Verification RP OCCUPATIONAL - WEEK 2 2 1, 2 05/07/2018 05/11/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 05/07/2018 05/11/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 05/07/2018 05/11/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/07/2018 05/11/2018 IP 71124.04 000728 Occupational Dose Assessment 1, 2 05/07/2018 05/11/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 05/07/2018 05/11/2018 IP 71151 000746 Performance Indicator Verification MITIGATING STRATEGIES 4 1, 2 06/18/2018 06/22/2018 TI 2515/191 000509 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 TRIENNIAL FIRE PROTECTION INSPECTION 8 1, 2 07/16/2018 07/20/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial) 1, 2 07/30/2018 08/03/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

FARLEY REQUAL INSPECTION 2 1, 2 08/20/2018 08/24/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial SECURITY BASELINE INSPECTION 3 1, 2 08/20/2018 08/24/2018 IP 71130.02 000734 Access Control 1, 2 08/20/2018 08/24/2018 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 08/20/2018 08/24/2018 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

Enclosure

IP 22 Inspection Activity Plan Report DESIGN BASES ASSURANCE INSPECTION (PROGRAM) 3 1, 2 10/15/2018 10/19/2018 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) 1, 2 11/05/2018 11/09/2018 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

EP EXERCISE 5 1, 2 10/29/2018 11/02/2018 IP 71114.01 000716 Exercise Evaluation 1, 2 10/29/2018 11/02/2018 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/29/2018 11/02/2018 IP 71151 001397 Performance Indicator Verification EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3 1, 2 01/14/2019 01/18/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 02/04/2019 02/08/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 02/18/2019 02/22/2019 IP 71152B 000747 Problem Identification and Resolution EP PROGRAM INSPECTION 3 1, 2 04/08/2019 04/12/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 04/08/2019 04/12/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 04/08/2019 04/12/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 04/08/2019 04/12/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 04/08/2019 04/12/2019 IP 71151 001397 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION 1 2 04/15/2019 04/19/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR UNIT 2 SG IN-SERVICE INSPECTION 1 2 04/15/2019 04/19/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP RADHAZARDS & TRANS 2 1, 2 04/15/2019 04/19/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/15/2019 04/19/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation FARLEY INITIAL LICENSE EXAM 4 1, 2 05/06/2019 05/10/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 1, 2 06/10/2019 06/21/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

SECURITY BASELINE INSPECTION 2 1, 2 06/10/2019 06/14/2019 IP 71130.02 000734 Access Control 1, 2 06/10/2019 06/14/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 06/10/2019 06/14/2019 IP 71130.07 000739 Security Training 1, 2 06/10/2019 06/14/2019 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

Enclosure

IP 22 Inspection Activity Plan Report RP PUBLIC 2 1, 2 06/17/2019 06/21/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/17/2019 06/21/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 06/17/2019 06/21/2019 IP 71151 000746 Performance Indicator Verification CYBER SECURITY 4 1, 2 08/12/2019 08/16/2019 IP 71130.10P 000741 Cyber Security 1, 2 08/26/2019 08/30/2019 IP 71130.10P 000741 Cyber Security TARGET SET 1 1, 2 09/09/2019 09/13/2019 IP 71130.14 000743 Review of Power Reactor Target Sets UNIT 1 IN-SERVICE INSPECTION 1 1 10/07/2019 10/11/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR UNIT 1 SG IN-SERVICE INSPECTION 1 1 10/07/2019 10/11/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

Enclosure