Updated Inspection Plan for Joseph M. Farley Nuclear Plant Reports 05000348/2019005 and 05000364/2019005
ML19240B067
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/28/2019
From: Alan Blamey
Division Reactor Projects II
To: Gayheart C
Southern Nuclear Operating Co
Geanette D
References
IR 2019005
Download: ML19240B067 (6)


Text

ust 28, 2019

SUBJECT:

UPDATED INSPECTION PLAN FOR JOSEPH M. FARLEY NUCLEAR PLANT REPORTS 05000348/2019005 AND 05000364/2019005

Dear Ms. Gayheart:

The enclosed inspection plan lists the inspections scheduled through June 30, 2021, for Joseph M. Farley Nuclear Plant, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The NRC will conduct Inspection Procedure 92702, "Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders" during the week of February 10, 2020. This inspection will assess your implementation of the "Confirmatory Order Related to the NRC Office of Investigations Report No. 2-2017-022", Protection of Safeguard Information (EA-18-032, ADAMS ACCESSION No. ML19029B321).

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of the letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (404) 997- 4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8 Enclosure(s):

Farley Inspection Activity Plan Report (9/1/2019 - 6/30/2021)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR JOSEPH M. FARLEY NUCLEAR PLANT REPORTS 05000348/2019005 AND 05000364/2019005 dated August 28, 2019 DISTRIBUTION:

M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMFarleyResource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML19240B067 OFFICE RII:DRP RII:DRP NAME DMasPenaranda ABlamey DATE 8/28/2019 8/28/2019 OFFICIAL AGENCY RECORD

Enclosure