ML110630148

From kanterella
Jump to navigation Jump to search
Report 22, Inspection/Activity Plan 01/01/2011 - 06/30/2012
ML110630148
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/04/2011
From:
NRC/RGN-II
To:
Southern Nuclear Operating Co
Shared Package
ML110630133 List:
References
IR-11-001
Download: ML110630148 (2)


Text

Inspection / Activity Plan Page 1 of 2 03/04/2011 08:54:42 Report 22 01/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Farley EB3 HS

- HEAT SINK 1

1, 2 IP Heat Sink Performance 7111107T 02/14/2011 02/18/2011 TFPI

- 805 TFPI 6

1, 2 IP Fire Protection-NFPA 805 Transition Period [Triennial]

7111105P 03/07/2011 03/11/2011 1, 2 IP Fire Protection-NFPA 805 Transition Period [Triennial]

7111105P 03/21/2011 03/25/2011 OL EXAM

- INITIAL EXAM PREP 6

1 FARLEY/MAY 2011 EXAM AT POWER FACILITIES V23349 04/18/2011 04/22/2011 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1, 2 IP Alert and Notification System Testing 7111402 05/02/2011 05/06/2011 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/02/2011 05/06/2011 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/02/2011 05/06/2011 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/02/2011 05/06/2011 1, 2 IP Performance Indicator Verification 71151 05/02/2011 05/06/2011 OL EXAM

- INITIAL EXAM - WEEK 1 5

1 FARLEY/MAY 2011 EXAM AT POWER FACILITIES V23349 05/09/2011 05/14/2011 OL EXAM

- INITIAL EXAM - WEEK 2 5

1 FARLEY/MAY 2011 EXAM AT POWER FACILITIES V23349 05/16/2011 05/20/2011 PI&R

- PROBLEM IDENIFICATION AND RESOLUTION 4

1, 2 IP Identification and Resolution of Problems 71152B 06/06/2011 06/10/2011 1, 2 IP Identification and Resolution of Problems 71152B 06/20/2011 06/24/2011 CDBI

- COMPONENT DESIGN BASES INSPECTION 9

1, 2 IP Component Design Bases Inspection 7111121 08/15/2011 08/19/2011 1, 2 IP Component Design Bases Inspection 7111121 08/29/2011 09/02/2011 1, 2 IP Component Design Bases Inspection 7111121 09/12/2011 09/16/2011 1, 2 IP Component Design Bases Inspection 7111121 09/26/2011 09/30/2011 EB3 ISI

- UNIT 2 IN-SERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 10/17/2011 10/21/2011 EB3SGISI

- UNIT 2 SG IN-SERVICE INSPECTION 2

2 IP Inservice Inspection Activities - PWR 7111108P 10/17/2011 10/21/2011 PSB1-RP

- RP HAZARD ASSESSMENT 2

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/24/2011 10/28/2011 PSB1-RP

- RP PUBLIC RADIATION PROTECTION INSP 4

1, 2 IP Occupational Dose Assessment 71124.04 12/12/2011 12/16/2011 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 12/12/2011 12/16/2011 1, 2 IP Radiological Environmental Monitoring Program 71124.07 12/12/2011 12/16/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 03/04/2011 08:54:42 Report 22 01/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Farley PSB1-RP

- RP PUBLIC RADIATION PROTECTION INSP 4

1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/12/2011 12/16/2011 1, 2 IP Performance Indicator Verification 71151 12/12/2011 12/16/2011 MC&A

- MC&A INSPECTION 2

1, 2 IP Material Control and Accounting (MC&A) 7113011 01/02/2012 12/31/2012 EB3 ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 04/02/2012 04/06/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK1 3

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/02/2012 04/06/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/02/2012 04/06/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/02/2012 04/06/2012 1, 2 IP Occupational Dose Assessment 71124.04 04/02/2012 04/06/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 04/02/2012 04/06/2012 1, 2 IP Performance Indicator Verification 71151 04/02/2012 04/06/2012 EB3SGISI

- UNIT 1 SG INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 04/09/2012 04/13/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK2 3

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/16/2012 04/20/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/16/2012 04/20/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/16/2012 04/20/2012 1, 2 IP Occupational Dose Assessment 71124.04 04/16/2012 04/20/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 04/16/2012 04/20/2012 1, 2 IP Performance Indicator Verification 71151 04/16/2012 04/20/2012 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2 IP Exercise Evaluation 7111401 05/07/2012 05/11/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/07/2012 05/11/2012 1, 2 IP Performance Indicator Verification 71151 05/07/2012 05/11/2012 OL EXAM

- INITIAL EXAM PREP 4

1 FARLEY / JUNE 2012 EXAM AT POWER FACILITIES V23373 05/28/2012 06/01/2012 OL EXAM

- INITIAL EXAM - WEEK 1 4

1 FARLEY / JUNE 2012 EXAM AT POWER FACILITIES V23373 06/18/2012 06/22/2012 OL EXAM

- INITIAL EXAM - WEEK 2 4

1 FARLEY / JUNE 2012 EXAM AT POWER FACILITIES V23373 06/25/2012 06/29/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure