|
---|
Category:Inspection Plan
MONTHYEARIR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) ML23005A0682023-01-0505 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000461/2023010 ML22312A5362022-11-0808 November 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000461/2023401 IR 05000461/20220052022-08-22022 August 2022 Updated Inspection Plan for Clinton Power Station (Report 05000461/2022005) IR 05000461/20210062022-03-0202 March 2022 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2021006) ML21333A0832021-11-29029 November 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Teams), Inspection Report Report 05000461/202201 IR 05000461/20210052021-09-0101 September 2021 Updated Inspection Plan for Clinton Power Station; Report 05000461/2021005 ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21076A5112021-03-17017 March 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000461/2021013 ML21071A1882021-03-12012 March 2021 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Clinton Power Station IR 05000461/20200062021-03-0404 March 2021 Annual Assessment Letter for Clinton Power Station Unit 1 (Report 05000461/2020006) ML20329A0662020-11-24024 November 2020 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection IR 05000461/20200052020-09-0101 September 2020 Updated Inspection Plan for Clinton Power Station, Unit 1 (Report 05000461/2020005) ML20183A1932020-06-30030 June 2020 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000461/2020010 IR 05000461/20190062020-03-0303 March 2020 Annual Assessment Letter for Clinton Power Station, (Report 05000461/2019006) IR 05000461/20190052019-08-28028 August 2019 Updated Inspection Plan for Clinton Power Station (Report 05000461/2019005 ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency IR 05000461/20180062019-03-0404 March 2019 Annual Assessment Letter for Clinton Power Station (Report 05000461/2018006) ML19037A4772019-02-0606 February 2019 Information Request to Support Upcoming Problem Identification and Resolution Inspect at Clinton Power Station ML19003A1912019-01-0303 January 2019 Request for Information for an NRC Triennial Baeline Design Bases Assurance Inspection; Inspection Report 05000461/2019011 IR 05000461/20180052018-08-28028 August 2018 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2018005) ML18088A5662018-03-28028 March 2018 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection 05000461/2018010 IR 05000461/20170062018-03-0202 March 2018 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2017006) ML17333A0782017-11-28028 November 2017 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2018002 IR 05000461/20170052017-08-28028 August 2017 Updated Inspection Plan for Clinton Power Station, Unit 1 and Quarterly Assessment Letter (Report 05000461/2017005) ML17146B2492017-03-31031 March 2017 Inspection Plan for Clinton Power Station for Triennial Fire Protection Baseline Inspection Report 2017 008 ML17076A3382017-03-16016 March 2017 Notification of NRC Baseline Inspection and Request for Information 05000461/2017002 IR 05000461/20160062017-03-0101 March 2017 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016006) IR 05000461/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016005) ML16098A3242016-04-0707 April 2016 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Clinton Power Station ML16076A2542016-03-15015 March 2016 Ltr. 03/15/16 Clinton Power Station, Unit 1 - Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000461/2016009 (Jen) ML16076A2462016-03-15015 March 2016 Ltr. 03/15/16 Clinton Power Station - Notification of NRC Inspection and Request for Information (Vlm) IR 05000461/20150062016-03-0202 March 2016 Annual Assessment Letter for Clinton Power Station Unit 1 (Inspection Report 05000461/2015006) IR 05000461/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2015005) IR 05000461/20140012015-03-0404 March 2015 Annual Assessment Letter for Clinton Power Station, Unit 1, (Report 05000461/2014001) ML14245A2362014-09-0202 September 2014 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 ML14177A3812014-06-25025 June 2014 Notification of NRC Supplemental Inspection (95001) and Request for Information IR 05000451/20130012014-03-0404 March 2014 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000451/2013001) ML13308B1302013-11-0101 November 2013 Ltr 11/1/13 Clinton Fire Protection Request for Information ML13246A2152013-09-0303 September 2013 2013 Clinton Power Station Mid-Cycle Letter Combined IR 05000461/20130082013-07-25025 July 2013 IR 05000461-13-008, May 20 - 24, 2013, June 3 - 7, 2013, and June 17 - 21, 2013, Clinton Power Station, Component Design Bases Inspection (CDBI) IR 05000461/20120012013-03-0404 March 2013 Annual Assessment Letter for Clinton Power Station (Report 05000461/2012001) ML13038A3122013-02-0707 February 2013 Request for Information for an NRC Triennial Baseline Component Design Bases Inspection Report 05000461-13-008 ML12249A4462012-09-0404 September 2012 Mid-Cycle Assessment Letter for Clinton Power Station, Unit 1 IR 05000461/20110072012-03-0505 March 2012 Annual Assessment Letter for Clinton Power Station (Report 05000461/2011007) IR 05000461/20110062011-09-0101 September 2011 Mid-Cycle Letter for Clinton Power Station, Unit 1; 05000461-2011-006 IR 05000461/20110012011-03-0404 March 2011 Annual Assessment Letter for Clinton Power Station (Report 05000461-11-001) ML1024400282010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Clinton Power Station ML1006103312010-03-0303 March 2010 EOC Annual Assessment Letter, Inspection/Activity Plan ML0924402412009-09-0101 September 2009 Clinton - Mid-Cycle Performance Review and Inspection Plan 2023-03-01
[Table view] Category:Letter
MONTHYEARIR 05000461/20230042024-02-0202 February 2024 Integrated Inspection Report 05000461/2023004 ML23361A1572024-01-24024 January 2024 Audit Plan in Support of Review of License Amendment Request Regarding Revision of Technical Specifications Related to Reactor Water Cleanup Isolation ML24004A0792024-01-18018 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0041 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000461/20234022023-12-27027 December 2023 Security Baseline Inspection Report 05000461/2023402 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 IR 05000461/20235012023-12-0505 December 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000461/2023501 ML23284A2512023-11-22022 November 2023 Amendment No. 250 to Adopt TSTF-332 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000461/20230032023-11-0808 November 2023 Integrated Inspection Report 05000461/2023003 ML22300A2212023-11-0202 November 2023 Preliminary Decommissioning Cost Estimate and Fuel Management Plan RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000461/20234202023-08-29029 August 2023 Security Baseline Inspection Report 05000461/2023420 RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20230022023-08-0404 August 2023 Integrated Inspection Report 05000461/2023002 RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release ML23209A8102023-07-28028 July 2023 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23202A0992023-07-24024 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2023004 ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary IR 05000461/20234012023-07-19019 July 2023 Cyber Security Inspection Report 05000461/2023401 ML23194A1662023-07-19019 July 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Partial Site Release ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release IR 05000461/20230102023-05-26026 May 2023 Triennial Fire Protection Inspection Report 05000461/2023010 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23143A3182023-05-23023 May 2023 Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 IR 05000461/20230012023-05-0404 May 2023 Integrated Inspection Report 05000461/2023001 ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000461/20220062023-03-0101 March 2023 Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2022006) RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air ML23031A2972023-03-0101 March 2023 Issuance of Amendment No. 248 Adoption of TSTF-269, Revision 2 RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23039A1852023-02-10010 February 2023 Integrated Inspection Report 05000461/2022004 07201046/2022001 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000461/20220112023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000461/2022011 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing ML23005A0682023-01-0505 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000461/2023010 ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20224022022-12-0606 December 2022 Security Baseline Inspection Report 05000461/2022402 RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI 2024-02-02
[Table view] |
Text
August 31, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
CLINTON POWER STATION
Dear Mr. Crane:
On August 14, 2007, the NRC staff completed its performance review of the Clinton Power Station for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix based on one White Notice of Violation (NOV) of 10 CFR 50, Appendix B, Criterion III, Design Control, requirements. The White finding was issued as an apparent violation in November 2006 for failure to adequately address vortexing in the reactor core isolation cooling (RCIC) storage tank and its effect on operability of the high pressure core spray (HPCS) system. The NOV was issued on February 7, 2007.
In June 2007, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the failure to adequately address vortexing in the RCIC storage tank and its effect on operability of the HPCS system.
Therefore, we began the Supplemental Inspection 95001 on August 28, 2007.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
C. Crane Routine resident inspections are not listed due to their ongoing and continuous nature.
Additional inspections scheduled include: component design bases inspection, triennial fire protection inspection, and mods/50.59 inspection. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mark A. Ring at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Anthony H. Hsia Acting for/
Cynthia D. Pederson, Director Division of Reactor Projects Docket No. 50-461 License No. NPF-62
Enclosure:
Clinton Power Station Inspection/Activity Plan DISTRIBUTION:
See next page
C. Crane Routine resident inspections are not listed due to their ongoing and continuous nature.
Additional inspections scheduled include: component design bases inspection, triennial fire protection inspection, and mods/50.59 inspection. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mark A. Ring at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Anthony H. Hsia Acting for/
Cynthia D. Pederson, Director Division of Reactor Projects Docket No. 50-461 License No. NPF-62
Enclosure:
Clinton Power Station Inspection/Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Clinton\Clinton MOC Letter 2007.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive
- See previous concurrence To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME MRing*:dtp AHsia for CPederson DATE 08/29/07 08/29/07 OFFICIAL RECORD COPY
Letter to C. Crane from C. Pederson dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
CLINTON POWER STATION cc w/encl: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Manager Licensing - Clinton Power Station Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois Chairman, Illinois Commerce Commission Clinton Police Department Mayor of Clinton Mayor of Weldon DeWitt County Board Chairman DeWitt County Sheriff EMA Coordinator, DeWitt County Mayor of Wapella McLean County Board Chairman McLean County Sheriff EMA Coordinator, McLean County Piatt County Board Chairman Piatt County Sheriff EMA Coordinator, Piatt County Macon County Board Chairman Macon County Sheriff EMA Coordinator, Macon County INPO
Letter to C. Crane from C. Pederson dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
CLINTON POWER STATION DISTRIBUTION:
TEB RAG1 SPS1 MMT RidsNrrDirslpab JLC1 MAS KGO JKH3 RML2 SAM9 SRI Clinton DRSIII DRPIII PLB1 TXN
Clinton Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection spection Activity Title on Site Start End Type 001 - 95001 FOR RCIC/HPCS VORTEXING 2 P 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 08/28/2007 09/07/2007 Supplemental Program I EP - EP EXERCISE INSPECTION / PI VERIFICATION 4 P 7111401 Exercise Evaluation 09/10/2007 09/14/2007 Baseline Inspections P 71151-EP01 Drill/Exercise Performance 09/10/2007 09/14/2007 Baseline Inspections P 71151-EP02 ERO Drill Participation 09/10/2007 09/14/2007 Baseline Inspections P 71151-EP03 Alert & Notification System 09/10/2007 09/14/2007 Baseline Inspections I RP - RADIATION PROTECTION BASELINE INSPECTION 1 P 7112202 Radioactive Material Processing and Transportation 09/17/2007 09/21/2007 Baseline Inspections P 71151-PR01 RETS/ODCM Radiological Effluent 09/17/2007 09/21/2007 Baseline Inspections I ENG - COMPONENT DESIGN BASES INSPECTION 5 P 7111121 Component Design Bases Inspection 10/15/2007 11/16/2007 Baseline Inspections I RP - RADIATION PROTECTION BASELINE INSPECTION 1 P 7112101 Access Control to Radiologically Significant Areas 11/05/2007 11/09/2007 Baseline Inspections P 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 11/05/2007 11/09/2007 Baseline Inspections I OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 P 7111111B Licensed Operator Requalification Program 11/05/2007 11/09/2007 Baseline Inspections I RP - RADIATION PROTECTION BASELINE INSPCETION 1 P 7112101 Access Control to Radiologically Significant Areas 11/26/2007 11/30/2007 Baseline Inspections P 7112102 ALARA Planning and Controls 11/26/2007 11/30/2007 Baseline Inspections I ENG - ENGINEERING INSERVICE INSPECTION 1 P 7111108G Inservice Inspection Activities - BWR 01/14/2008 02/08/2008 Baseline Inspections I RP - RADIATION PROTECTION BASELINE INSPECTION 1 P 7112101 Access Control to Radiologically Significant Areas 01/28/2008 02/01/2008 Baseline Inspections P 7112102 ALARA Planning and Controls 01/28/2008 02/01/2008 Baseline Inspections I EP - EP ROUTINE INSPECTION / PI VERIFICATION 1 P 7111402 Alert and Notification System Testing 03/17/2008 03/21/2008 Baseline Inspections P 7111403 Emergency Response Organization Augmentation Testing 03/17/2008 03/21/2008 Baseline Inspections P 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/17/2008 03/21/2008 Baseline Inspections P 71151-EP01 Drill/Exercise Performance 03/17/2008 03/21/2008 Baseline Inspections P 71151-EP02 ERO Drill Participation 03/17/2008 03/21/2008 Baseline Inspections P 71151-EP03 Alert & Notification System 03/17/2008 03/21/2008 Baseline Inspections I ENG - BIENNIAL HEAT SINK INSPECTION 2 P 7111107B Heat Sink Performance 03/31/2008 04/04/2008 Baseline Inspections
Clinton Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection spection Activity Title on Site Start End Type I RP - RADIATION PROTECTION BASELINE INSPECTION 1 P 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 04/07/2008 04/11/2008 Baseline Inspections I RP - RADIATION PROTECTION BASELINE INSPECTION 1 P 7112101 Access Control to Radiologically Significant Areas 06/16/2008 06/20/2008 Baseline Inspections P 7112102 ALARA Planning and Controls 06/16/2008 06/20/2008 Baseline Inspections I ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 P 7111105T Fire Protection [Triennial] 09/15/2008 10/03/2008 Baseline Inspections I RP - RADIATION PROTECTION BASELINE INSPECTION 1 P 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/20/2008 10/24/2008 Baseline Inspections P 71151-BI01 Reactor Coolant System Activity 10/20/2008 10/24/2008 Baseline Inspections P 71151-OR01 Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 Baseline Inspections P 71151-PR01 RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 Baseline Inspections I ENG - ENGINEERING MODIFICATIONS / 50.59 INSP. 2 P 7111102 Evaluation of Changes, Tests, or Experiments 12/01/2008 12/19/2008 Baseline Inspections P 7111117B Permanent Plant Modifications 12/01/2008 12/19/2008 Baseline Inspections