August 31, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
CLINTON POWER STATION
Dear Mr. Crane:
On August 14, 2007, the NRC staff completed its performance review of the Clinton Power Station for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix based on one White Notice of Violation (NOV) of 10 CFR 50, Appendix B, Criterion III, Design Control, requirements. The White finding was issued as an apparent violation in November 2006 for failure to adequately address vortexing in the reactor core isolation cooling (RCIC) storage tank and its effect on operability of the high pressure core spray (HPCS) system. The NOV was issued on February 7, 2007.
In June 2007, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the failure to adequately address vortexing in the RCIC storage tank and its effect on operability of the HPCS system.
Therefore, we began the Supplemental Inspection 95001 on August 28, 2007.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
C. Crane Routine resident inspections are not listed due to their ongoing and continuous nature.
Additional inspections scheduled include: component design bases inspection, triennial fire protection inspection, and mods/50.59 inspection. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mark A. Ring at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Anthony H. Hsia Acting for/
Cynthia D. Pederson, Director Division of Reactor Projects Docket No. 50-461 License No. NPF-62
Enclosure:
Clinton Power Station Inspection/Activity Plan DISTRIBUTION:
See next page
C. Crane Routine resident inspections are not listed due to their ongoing and continuous nature.
Additional inspections scheduled include: component design bases inspection, triennial fire protection inspection, and mods/50.59 inspection. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mark A. Ring at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Anthony H. Hsia Acting for/
Cynthia D. Pederson, Director Division of Reactor Projects Docket No. 50-461 License No. NPF-62
Enclosure:
Clinton Power Station Inspection/Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME: G:\\Branch TSS\\ALL MOC\\midcycle 2006 to 2007\\Clinton\\Clinton MOC Letter 2007.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive
- See previous concurrence To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME MRing*:dtp AHsia for CPederson DATE 08/29/07 08/29/07 OFFICIAL RECORD COPY
Letter to C. Crane from C. Pederson dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
CLINTON POWER STATION cc w/encl:
Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Manager Licensing - Clinton Power Station Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois Chairman, Illinois Commerce Commission Clinton Police Department Mayor of Clinton Mayor of Weldon DeWitt County Board Chairman DeWitt County Sheriff EMA Coordinator, DeWitt County Mayor of Wapella McLean County Board Chairman McLean County Sheriff EMA Coordinator, McLean County Piatt County Board Chairman Piatt County Sheriff EMA Coordinator, Piatt County Macon County Board Chairman Macon County Sheriff EMA Coordinator, Macon County INPO
Letter to C. Crane from C. Pederson dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
CLINTON POWER STATION DISTRIBUTION:
TEB RAG1 SPS1 MMT RidsNrrDirslpab JLC1 MAS KGO JKH3 RML2 SAM9 SRI Clinton DRSIII DRPIII PLB1 TXN
Clinton Inspection / Activity Plan 09/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 2
95001
- 95001 FOR RCIC/HPCS VORTEXING Supplemental Program 08/28/2007 09/07/2007 95001 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 4
BI EP
- EP EXERCISE INSPECTION / PI VERIFICATION Baseline Inspections 09/10/2007 09/14/2007 7111401 IP Exercise Evaluation Baseline Inspections 09/10/2007 09/14/2007 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 09/10/2007 09/14/2007 71151-EP02 IP ERO Drill Participation Baseline Inspections 09/10/2007 09/14/2007 71151-EP03 IP Alert & Notification System 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/17/2007 09/21/2007 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/17/2007 09/21/2007 71151-PR01 IP RETS/ODCM Radiological Effluent 5
BI ENG
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 10/15/2007 11/16/2007 7111121 IP Component Design Bases Inspection 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 11/05/2007 11/09/2007 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/05/2007 11/09/2007 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 2
BI OL
- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 11/05/2007 11/09/2007 7111111B IP Licensed Operator Requalification Program 1
BI RP
- RADIATION PROTECTION BASELINE INSPCETION Baseline Inspections 11/26/2007 11/30/2007 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/26/2007 11/30/2007 7112102 IP ALARA Planning and Controls 1
BI ENG
- ENGINEERING INSERVICE INSPECTION Baseline Inspections 01/14/2008 02/08/2008 7111108G IP Inservice Inspection Activities - BWR 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 01/28/2008 02/01/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/28/2008 02/01/2008 7112102 IP ALARA Planning and Controls 1
BI EP
- EP ROUTINE INSPECTION / PI VERIFICATION Baseline Inspections 03/17/2008 03/21/2008 7111402 IP Alert and Notification System Testing Baseline Inspections 03/17/2008 03/21/2008 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 03/17/2008 03/21/2008 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 03/17/2008 03/21/2008 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/17/2008 03/21/2008 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/17/2008 03/21/2008 71151-EP03 IP Alert & Notification System 2
BI ENG
- BIENNIAL HEAT SINK INSPECTION Baseline Inspections 03/31/2008 04/04/2008 7111107B IP Heat Sink Performance
Clinton Inspection / Activity Plan 09/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 04/07/2008 04/11/2008 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 06/16/2008 06/20/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 06/16/2008 06/20/2008 7112102 IP ALARA Planning and Controls 3
BI ENG
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 09/15/2008 10/03/2008 7111105T IP Fire Protection [Triennial]
1 BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 10/20/2008 10/24/2008 71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 10/20/2008 10/24/2008 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/20/2008 10/24/2008 71151-PR01 IP RETS/ODCM Radiological Effluent 2
BI ENG
- ENGINEERING MODIFICATIONS / 50.59 INSP.
Baseline Inspections 12/01/2008 12/19/2008 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 12/01/2008 12/19/2008 7111117B IP Permanent Plant Modifications