Pages that link to "PNO-II-92-053, on 920821,plant Experienced Safety Injection & Reactor Trip.Unit Being Cooled by Dumping Steam to Main Condenser.Cause of Low Pressure Safety Injection Being Investigated.State of Tn Informed"
Jump to navigation
Jump to search
The following pages link to PNO-II-92-053, on 920821,plant Experienced Safety Injection & Reactor Trip.Unit Being Cooled by Dumping Steam to Main Condenser.Cause of Low Pressure Safety Injection Being Investigated.State of Tn Informed:
Displayed 45 items.
- PNO-II-85-078, crack Identified on Weld of 3/4-inch Sample Line Running Off RCS Letdown Line.Weld Crack in Identical Location to One Found on 850729.Weld Repaired.Pipe Supports Being Installed (← links)
- PNO-III-80-113, on 800623,while Heating Up Plant for Initial Criticality,Inadvertent Actuation of Safety Injection Occurred.Caused by Manual Opening of Main Steam Isolation Valves.All Equipment Functioned as Expected (← links)
- PNO-II-86-007, on 860117,local Media Interest Developed as Result of Detection of Contamination on Outside Wall of Condensate Demineralizer Waste Evaporator on 860115.Licensee Analyzing Addl Soil Samples for Possible Contamination (← links)
- PNO-II-85-080, on 850821,orderly Shutdown Directed by TVA Due to Independent Contractor Concerns That Documentation Inadequate for Environ Qualification of Electrical Equipment.State of Tn Informed (← links)
- PNO-II-85-074, on 850729,employees Received Minor Contamination.Caused by Weld Leak Off RCS Letdown Line.Flow Rate Reduced & Path Opened to Maintain Water Control. Employees Decontaminated at Plant (← links)
- PNO-II-96-071, on 961011,Unit 2 Experienced Low Seal Flow Alarm on RCP 4,seal 1 & High Standpipe Alarm on RCP 4. Controlled Shutdown Begun as Required by Procedures.Licensee Currently Investigating Cause of Equipment Malfunctions (← links)
- PNO-II-96-069, on 961005,potential Transformer in Plant 500 Kv Switchyard Exploded.Cause Determined to Be Unusual Event. Licensee Has Developed Plans for Damage Assessment,Repairs, Investigation & Root Cause Analysis (← links)
- ML20126D190 (← links)
- ML20154M820 (← links)
- ML20154H026 (← links)
- ML20154G084 (← links)
- ML20154D916 (← links)
- ML20154D884 (← links)
- ML20154C622 (← links)
- ML20151J912 (← links)
- ML20196B716 (← links)
- ML20155E582 (← links)
- ML20198M827 (← links)
- ML20197E175 (← links)
- PNO-II-80-164, on 801123,unanticipated Safety Injection Occurred During Testing Involving Loss of Offsite Power. Safeguards Actuation Signal Reset Locally.Caused by Inverter Failure (← links)
- PNO-II-93-007, on 930204,plant Commenced Power Reduction Due to Identified Steam Leakage on 1B1 MSR High Pressure Operating Vent Line.Resident Inspectors Have Been Following Licensee Actions.State of Tn Not Required to Be Informed (← links)
- ML20203G053 (redirect page) (← links)
- PNO-II-92-053 (redirect page) (← links)
- PNO-II-86-049, on 860711,earth Tremor Measuring 3.7 on Richter Scale Occurred in Dalton,Ga.No Seismic Monitor Alarms Received.No Damage Occurred to Plant.Remote Seismic Monitoring Instruments Being Checked (← links)
- ML20206G977 (← links)
- ML20209D347 (← links)
- ML20209D223 (← links)
- PNO-II-86-083, on 861024,util Could Not Determine Exact Location of 11 of 23 in-core Detectors Containing 0.004 G U-235.Region Will Monitor Util Followup Actions During 861029-30 Insp (← links)
- ML20212F065 (← links)
- ML20212E324 (← links)
- ML20212E237 (← links)
- ML20212C656 (← links)
- ML20212C649 (← links)
- ML20212C635 (← links)
- ML20212C627 (← links)
- ML20212C608 (← links)
- ML20212C595 (← links)
- ML20237L360 (← links)
- ML20249B946 (← links)
- PNO-II-97-055, on 971006,contaminated Person Transported from Sequoyah Nuclear Plant to Offsite Medical Facility,Following Apparent Heart Attack.Victim Pronounced Dead at Hosp,Due to Apparent Heart Attack.Licensee Responded to Media Inquirie (← links)
- ML20215J488 (← links)
- ML20214W406 (← links)
- PNO-II-87-010, on 870201,approx 3,000 to 4,000 Gallons of Reactor Coolant Spilled Through Steam Generator Manway & Into Containment.No Water Released Outside Plant.Caused by Failure to Close RHR Suction Valves to RCS (← links)
- PNO-II-93-008A, on 930301,plant Was Manually Tripped from Full Power When Operators Noticed Increase in Main Generator Voltage.Leak Believed to Be Caused by Erosion of Piping (← links)
- PNO-II-94-001, on 940107,plant Began CPR from 100% Power to Mode 4 Due to Inoperable Ccp.Resident Inspector Dispatched. State of Tn Informed (← links)