Proposes to Postpone Scheduled Insp of Plant Based on Listed Technical & Personal Reasons.Author Will Conduct Procedure 35200 After FSAR Amended to Cover Organizational Changes & in Unscheduled Bits & Pieces
ML20238B268
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/30/1978
From: Renee Taylor
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20238B208 List:
References
FOIA-87-428 NUDOCS 8709010143
Download: ML20238B268 (2)


Text

_ - , . . . . . _ _ . - -

i

, fI /

)

7 Y >

\ ,

June 30,1978

[ .a

~5
  • C 1

v; / C E MEMORANDUM FOR: W. C. Seidle, Chief, RC&ES Branch THRU: W. A. Crossman, Chief, Projects Section "

h)

r. , r FROM: R. G. Taylor, Reactor Inspector, Projects Sect (bn g

SUBJECT:

COMANCHE PEAK HID-TERM QA INSPECTION 4 m DN 50-445; 50-446 -

By memorandum, dated March 7,1978, I proposed to conduct the rufemneed .

inspection in the June-July 1978 time frame. Your concurmnce was received,

-- H - and I scheduled the inspection for July 11-14, 1978 as inspection 78-12. n i

I now propose to postpone the inspection based upon the following technicaf and personal reasons: g

a. Technical 1 5

as<

,.. Procedure 35200 mquires identification of substantive chadges in the.

licensee and/or contractor QA/QC organizations since last reviewed by -

NRR-QAB. As we are all aware, substantive changes have been made which h will not be reviewed by licensing until the at least Amendment two (2)

I to the FSAR is filed. If we conduct the inspection as scheduled, we would have to describe these changes and call them either unresolved or deviation items; ooth of which in varying degrees f@ly a briticism o,f, their actions. None of their actions on their organization changes ,

appear to warrant criticir,m to date and in fact appear to have only enhanced the effectiveness of their program. The other prpgransnatic ,

aspects of the inspectior. have been in varying degrees reviewed in ' ~

regular inspections to the extent they art applicable withithe possible exception of site originated procurement of which there is*1ittle thay is aafety related.

n.'

t

' i - -

0709010143 070827 kLIA -428 PDP.

co o,,,e, y R QMr i__

,,,,,,,, TayIr/nh Crossman p E V ,'

pave > . 5/ 30/7.8... ..5/M/R '

NRC FORM 518 (9 76) NRCM 0240 W us s. oovannuswr emnersne orrsea se7e-ase4sd

4

,.  ;.....s

, ...=~

W. C. Seidle June 30, 1978

b. Personal As of this date, I am planning on making the physical sove to the site area during the week beginning Monday, July 24. I have'not yet identified anything specific that.must be done in the week of July 11-14 to facilitate the move, but I'm sure that both sqy wife and I would be much more comfortable if I.wem not away during what will probably turn into a panic period. .

I would propose to conduct 35200 after the FSAR has been amended to cover the organizational changes and in unscheduled bits and pieces after I'm in residence at the site.

l Your concurrence to this proposal at the earliest.possible time is mquested.

i I

j s V l ll' . .

R. G. Taylor, Reactor Inspector i' Projects Section ,

i Concur Date W. C. Seidle i

vv hi ;

i k

l

' ) l{'l '

f:* ..,. .

1 1

i l

0 r,' b;.

% N/

e.

UNn LI> STATES

,:/g':~i h"Jv'a j NUCL E Af t REGUL. ATORY COMMISSION S taiaton tv )

j;g ,j;..k,ibg' d Gil HYAN PL AZA DHIVE, SulTE 1000 >

/  %, '.....f Anuoc, TON, TEX AS 70012 In Reply Refer To: November 2, 1979 l

{

RIV

{

Docket No. 50-445/Hpt. 78-13 50 446/npt. 78-18 Texas Util.i ties Generat in;; Company ATTN: Mr. R. J. Gary, Executive Vice President and General Mana;;cr 5 2001 Eryan Tower  !

Dallas, Texas 75201 i

Gentlemen:

Thank you october 1, for your lot t( rs dated Naven.ber 16, 1978, December 20,1978, and j 1

December 8, 1979, in i e.u pon s e tu our lett ers dated October 20, 1978, and 1978. M. havo no furt her questions at this tina and will review your corrective action durinr, a future inspe ct ion. i Sincerely, ,

)

, j?(' ,. ll 4 fy (~)

,',f';r::

,.(f W. C. Seidle, Chief Reactor Construction and Engineering Support Branch f

{

i g Ill1*I.c '

ist

e nM% f UNI ri D S1 ATES A& @

p/ c, NUCI E AI: REGUL ATOHY COMMISSloN E

  • T r (j,'

Sj,4 4 o

2 HLG'ON tv c,n n vnN n Aza naivr cui ro 1000 c, ?d'i![!,LQj.-

an una ron. Tt xas 7soii s., .

y January 4,1979 In Reply Refer To:

RIV Docket No. 50-445/Rpt. 78-18 50-446/Rpt. 78-18 Texas Utilities Generating Company ATIN: Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Centlemen:

Thank you for your letters dated November 16, 1978 and December 20, 1978, in reponse to our letters dated October 20, 1978 and December 8, 1978.

We have no further questions at this time and will review your corrective action during a future inspection.

Sincerely,

/ _.

/' .

2 *-< de_*

W. C. Sei);1e, Chief Reactor C'o'ns truction and Engineering Support Branch 4

b C I

@oirgo33 i

/M/ U

  • ' UNITED STATES

[pa naGeq< i:,r '

NUCLEAR REGULATORY COMMISSION f" $ REGION IV T.

' $ 611 RYAN PLAZA DRIVE,SulTE 1000 AR LINGTON, TE XAS 76011

% *****/ February 20, 1979 In Reply Refer To:

RIV Docket No. 50-446/79-03 '

Texas Utilities Generating Company ATTH: Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen: .

This refers to the inspection activities performed by our Resident In-spector, Mr. R. G. Taylor, of activities authorized by.NRC Construction Permit No. CPPR-127 for the Comanche Peak Steam Electric Station, Unit 2, and to the discussion of the findings by the inspector with members of your staff on February '15,1979.

( During the inspection, it was found that certain activities under your license appear to be in noncompliance with Appendix B to 10 CFR 50 of the NRC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."

The item of noncompliance and references to the pertinent requirements are 4 identified in the enclosed Notice of Violation. Details of this item will be included in an inspection report to be issued in the near future and identified as Inspection Report No. 50-445/79-03; 50-446/79-03.

This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10 Code of Federal Regulations. Section 2.201 requires you to submit to this office, with-in 30 days of your receipt of this notice, a written statement or expla-nation in reply including: (1) corrective steps which have been taken by you, and the results achieved; (2) corrective steps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.

S L_ -__ _ _-

  • t t

Texas Utilities Generating Company ~ February 20, 1979 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.  ;

Sincerely, j k  ;

W. C. Se e, Chief Reactor nstruction and Engineering Support Branch j Enclosure- i Appendix A, Notice of Violation cc: w/ enclosure Texas Utilities Generating Company ATTN: Mr. H. C. Schmidt, Project Manager 2001 Bryan Tower Dallas, Texas 75201 l

l i

l ,

1 i

  • i l

b l - _ - _

, - __ = _

50-446/79-13 t

Appendix A  ;

i NOTICE OF VIOLATION Based on the results of the NRC inspection conducted on February 15, 1979, it appears that certain of your activities were not conducted in full compliance with the conditions of your NRC Construction Permit No.

CPPR 127 as indicated below:

Failure to Follow Concrete Placement Procedure Criterion V of Appendix B to 10 CFR 50 requires that activities I affecting quality shall be accomplished in accordance with docu-mented instructions, procedures, or drawings of a type appropriate to the circumstances.

Project Quality Procedure Ql-QP-11.0-3 references Specification 2323-55-9, " Concrete," which invokes Section 8.3 of ACI 301-72 for depositing of concrete. Paragraph 8.3.3 of ACI 301-72 states that, " Concrete shall not be subjected to any procedure which will l cause segregation."

)

Contrary to the above:

( Durin Wall)gonconcrete l Feburaryplacement 201-5805-019 15, 1979, at approximately(Unit 11:15No.

a.m., 2 Containment the  !

Resident Inspector observed that concrete was free-falling from j

" elephant-trunks" and impinging on reinforcing steel prior to I reaching the deposit surface. Concrete segregation was evidenced by coarse aggregate emanating from the stream of falling concrete.

This is an infraction. '

\

I l

.i i

.l l

gW py 1

46 l l L

e_.__. _ _ . _

U.S.N.R.C. PREL2MINARY NOTICE OF kIOLAT10N)

DEVIATION Docket Number c;0-fl6 '

  • Date February b l479 To: R .G . Tol son TUGCO Site OA Supervisor t/)TE : This preliminary notice is intended to be an unofficial advice t hat an apparent item of noncompliance or deviation has been identified by the below signed NRC IE Inspector. The addressee is not obligated er requested to take any action on the basis of this notification.

O*ficial notification will be as required by 10CFR2.201.

[lentified condition vs Requirement Requirement : Appendix B Criterion V requires that activities affecting quality be per:ormed in accordance with proedures. Project quality procedure Ql-QP-11.0-3 Concrete Placement Inspection states in paragraph 3.2.2.d " Placement technique I

causes minimum segregation". The procedure references Specification 2323-SS-9

" Concrete" which states in paragraph 8.2.5.b that depositing of concrete shall be in accordance with Section 8.3 of ACI 301-72. Section 8.3 of ACI 301-72 states

( in paragraph 8.3.3 that " Concrete shall not be subjected to any procedure which will cause segregation".

1 1 Condition : Cortrary to the above requirement , the RR1 observed during a portion of I

concrete placement 201-5805-019 (unit 2 containment wall) on February 15, 1979 at approximately 11:15 AM that concrete was free-falling from elephant-trunks and impinging on reinforcing steel prior to reaching the deposit surface. Concrete segregation was evidenced by flying coarse aggregate emanating from the stream of falling concrete.

This is an infraction.

Note: The inspection report transmittal letter and the report details will I

reflect that the condition was immediately corrected after being brought to the attending B&R QC Inspector. The letter will require that you address actions to prevent recurrence.

l l

s%

[, ,/

/

O I U.S.N.R.C. PREt.IMINARY NOTICE OF .

Docket Number 90-226 t Date February 15. 1979 TO: R .G . Tol son TUGCO Site OA Supervisor NOTE: This preliminary notice is intended to be an unofficial advice I that an apparent item of noncompliance or deviation has been identified by the below bigned NRC IE Inspector. The addressee is not obligated or requested to take any action on the basis of this notification.

Official notification will be as required by 10CFR2.201. ,

Identified condition vs Requirement Requirement : Appendix B Critorion V requires that activities affecting quality be performed in accordance with proedures. Project quality procedure Ql-QP-11.0-3 Concrete Placement inspection states in paragraph 3.2.2.d " Placement technique causes minimum segregation". The procedure references Specification 2323-SS-9

" Concrete" which states in paragraph 8.2.5.b that depositing of concrete shall be in accordance with Section 8.3 of ACI 301-72. Section 8.3 of ACI 301-72 states in paragraph 8.3.3 that " Concrete shall not be subjected to any procedure which will cause segregation".

Condition : Contrary to the above requirement , the RR1 observed during a portion of concrete placement 201-5805-019 (unit 2 containment wall) on February 15, 1979 at approximately 11:15 AM that concrete was free-falling from elephant-trunks and impinging on reinforcing steel prior to reaching the deposit surface. Concrete segregation was evidenced by flying coarse aggregate emanating from the stream of falling concrete.

This is an infraction.

Note: The inspection report transmittal letter and the report details will 4 reflect that the condition sas immediately corrected after being brought to the l attending f3&R QC Inspector. The letter will require that you address actions  ;

to prevent recurrence.