MONTHYEARML24282A9072024-10-17017 October 2024 Summary of June 28, 2024, Pre-submittal Meeting with Arizona Public Service Company to Discuss a Planned License Amendment Request Changes to Technical Specifications 3.5.1 and 3.5.2 ML24271A3052024-10-0404 October 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss a LAR to Modify the TS 5.6.5 List of Allowable Methodologies for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML23258A1402023-09-27027 September 2023 Summary of August 31, 2023, Presubmittal Meeting with Arizona Public Service Company to Discuss Planned Submittal of License Renewal Commitment Regarding Alloy 600 Management Program Plan at Palo Verde Station, Units 1, 2, & 3 ML23150A1982023-06-0505 June 2023 Summary of 5/25/2023, Presubmittal Meeting with Arizona Public Service Company to Discuss ASME, Section XI Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde, Units 1, 2, and 3 ML23097A0692023-04-14014 April 2023 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request Regarding Containment Temperature and Safety Injection Tank Volume at Palo Verde Units 1, 2, and 3 ML23095A0932023-04-0606 April 2023 Summary of April 4, 2023, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station ML23072A0312023-03-14014 March 2023 March 1, 2023, Summary of Meeting with Arizona Public Service Company to Discuss Proposed 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML22314A2742022-11-15015 November 2022 October 27, 2022 Meeting with Arizona Public Service Company to Discuss Proposed LAR to Adopt TSTF-107, Revision 4, Separate Control Rods That Are Untrippable Versus Inoperable, for Palo Verde, Units 1, 2, & 3 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22098A0322022-04-20020 April 2022 Summary of April 6, 2022, Public Meeting with Arizona Public Service Company to Discuss Upcoming License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-487 (EPID L-LRM-0025) ML21347A9522021-12-14014 December 2021 Summary of December 9, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming LAR to Adopt TSTF-567, Add Containment TS to Address GSI-191 Issues for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21333A0022021-12-0202 December 2021 Summary of Pre-Submittal Meeting with Arizona Public Service Company RIPE Exemption for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21278A5462021-10-13013 October 2021 Summary of Meeting with Arizona Public Service Company to Discuss Relief Request No. 68 for Certain ASME Code Piping for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21245A4152021-09-0808 September 2021 Summary of Public Meeting with Arizona Public Service Company to Discuss Upcoming Exemption to Eliminate Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station ML21168A2632021-06-24024 June 2021 Summary of June 16, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming Relief Request No. 67, Extension of Containment Tendon Inservice Testing from 10 Years to 20 Years for Palo Verde Nuclear Generating Station, U ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21134A0002021-05-18018 May 2021 Summary of Public Meeting with Arizona Public Service Company to Discuss Upcoming Order License Transfer from Pnm to Salt River Project Agriculture Improvement and Power District for Palo Verde, Units 1 and 2 and the ISFSI ML21061A3202021-03-10010 March 2021 Summary of February 25, 2021, Public Meeting with Nuclear Energy Institute to Further Discuss the Inclusion of TSTF-425 Under the Risk-Informed Process for Evaluations Initiative ML21055A8502021-02-24024 February 2021 Public Meeting Summary ML21011A2742021-01-26026 January 2021 Summary of January 6, 2021, Public Meeting with Arizona Public Service Company to Discuss Upcoming LAR Regarding Containment Integrated Leak Rate Test Permanent Extension to 15 Years for Palo Verde Nuclear Generating Station, Units 1, 2, an ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19219A6122019-08-13013 August 2019 Summary of July 11, 2019, Teleconference with APS to Discuss Proposed License Amendment Request to Revise the Emergency Plan for Palo Verde Nuclear Generating Station ML17353A1902017-12-29029 December 2017 Summary of 12/12/2017, Public Meeting with Arizona Public Service Company, on Proposed Relief Request 50 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML17003A0352017-01-0404 January 2017 Summary of Pre-Application Meeting with Arizona Public Service to Discuss a Proposed Second Emergency License Amendment Request to Revise Technical Specification 3.8.1, AC (Alternating Current) Sources - Operating, for Palo Verde Nuclear ML16088A0602016-04-15015 April 2016 3/24/16 Summary of Pre-application Meeting with Arizona Public Service Company to Discuss Next Generation Fuel License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML16028A3942016-02-12012 February 2016 Summary of Prelicensing Meeting with Arizona Public Service Company to Discuss Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML16011A0582016-01-21021 January 2016 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15306A2352015-11-13013 November 2015 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Degraded Voltage Relay Setpoints License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15286A0282015-10-23023 October 2015 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Revised Methodology for Spent Fuel Pool Criticality Analysis and Associated Technical Specification Changes for Palo Verde, Units 1, 2, and 3 (CAC MF6600-MF6602) ML15268A1312015-10-0505 October 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15239B3222015-09-0909 September 2015 Summary of Public Meeting Via Conference Call with Arizona Public Service Company Regarding Ongoing Resolution of Generic Letter 2004-02 for Palo Verde, Units 1, 2, and 3 ML15244B0772015-09-0101 September 2015 Summary of Annual Assessment Meeting with Arizona Public Service Regarding Palo Verde Nuclear Generating Station 2014 Performance ML15173A2892015-06-30030 June 2015 June 9, 2015, Summary of Category 1 Public Meeting with Arizona Public Service Company to Discuss Palo Verde Nuclear Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned NTTF Recommendation ML15140A3142015-06-16016 June 2015 Summary of Preapplication Meeting with Arizona Public Service Company to Discuss Revised Methodology for Spent Fuel Pool Criticality Analysis and Associated Technical Specification Changes for Palo Verde, Units 1, 2, and 3 (TAC MF5843-MF584 ML15117A0422015-04-29029 April 2015 Memorandum to File Summarizing 4/24/15 Telephone Conference Granting Verbal Relief for Relief Request 53, Request for Approval of an Alternative to ASME Code, Section XI, Requirements for Flaw Removal ML15078A0052015-03-25025 March 2015 Summary of 2/18/2015 Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3 on TSTF-505, Risk-Informed Technical Specifications ML14150A1772014-06-0202 June 2014 Summary of Conference Call Regarding Spring 2014 Steam Generator Tube Inspections ML14136A0582014-06-0202 June 2014 5/14/2014 Summary of Meeting with Arizona Public Service Company to Discuss Flooding Hazard Reevaluation Extension Request for Palo Verde, Units 1, 2, and 3; Near-Term Task Force Recommendation 2.1 ML14099A4692014-04-21021 April 2014 Summary of 4/2/2014 Pre-Application Meeting with Arizona Public Service Company to Discuss Extension of Authorized Repair to Palo Verde, Unit 3, Bottom Mounted Instrumentation to End-of-Unit Life ML13333B5742013-12-0505 December 2013 Summary of 11/1/2013 Conference Call Regarding the Fall 2013 Steam Generator Tube Inspections ML13330A5732013-12-0505 December 2013 Verbal Authorization of Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval ML13312A5402013-11-18018 November 2013 11/5/2013 Summary of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13311B1832013-11-18018 November 2013 Summary of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13234A0052013-08-26026 August 2013 8/21/2013 - Summary of Preapplication Meeting with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13203A0852013-08-0505 August 2013 Summary of Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request Related to the Startup Test Activity Reduction Program at Palo Verde, Units 1, 2, and 3 (TAC Nos. MF1932-MF1934) ML13161A2522013-06-26026 June 2013 Summary of Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831) ML13154A4502013-06-26026 June 2013 Summary of Meeting Via Conference Call with Arizona Public Service Co. to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME816 ML13154A4322013-06-13013 June 2013 5/30/13 Summary of Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF083 ML12244A2152012-09-20020 September 2012 8/30/2012 Summary of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 2024-09-27
[Table view] |
Text
January 22, 2010 LICENSEE: Arizona Public Service Company
FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 14, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on January 14, 2010, to discuss and clarify the staff's draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's draft RAI.
provides a listing of the participants and Enclosure 2 contains a listing of the draft questions discussed with the applicant, including a brief description on the status of the items. The applicant had an opportunity to comment on this summary.
/RA/ Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation
Docket Nos. 50-528, 50-529, and 50-530
Enclosures:
As stated cc w/encls: See next page
ML100141784 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR
NAME SFigueroa LRegner DWrona LRegner DATE 01/19/10 01/20/10 01/22/10 01/22/10 Memo to Arizona Public Service Company from Lisa M. Regner dated January, 22, 2010
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 14, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION DISTRIBUTION
- HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail Resource -------------
L. Regner D. Drucker R. Hall B. Mizuno, OGC R. Treadway, RIV G. Pick, RIV ENCLOSURE 1 TELEPHONE CONFERENCE CALL PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JANUARY 14, 2010 PARTICIPANTS AFFILIATIONSLisa Re gner U.S. Nuclear Re gulator y Commission (NRC) Albert Won g NRCTodd Mintz Center for Nuclear Waste Re gulator y Anal y ses (CNWRA)Roman Kazban CNWR A An gela Krainik Arizona Public Service Com p an y (APS) Glenn Michael APS Neal Schneider Strate gic Teamin g and Resource Sharin g (STARS) AllianceDonald Stevens STARSNicholas Gawel STARSAl Saunders STARS
ENCLOSURE 2 TELEPHONE CONFERENCE CALL CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION JANUARY 14, 2010 The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on January 14, 2010, to discuss and clarify the following draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, license renewal application (LRA).
DRAFT RAI 3.1.2-1
=
Background===
The Generic Aging Lessons Learned (GALL) Report,Section X.M1 recommends the Metal Fatigue of Reactor Coolant Pressure Boundary Aging Management Program (AMP) for managing the aging of selected reactor coolant system components.
Issue In the LRA, Section 3.1.2.2.1, the applicant states that the pressurizer relief tank is not an ASME Section III Class 1 component, nor is it designated to other fatigue or cycle design rules, and therefore has no fatigue time-limited aging analysis (TLAA). However, the GALL Report,Section IV, Subsection C2, item IV.C2-23 states that a time-limited aging analysis is needed to evaluate metal fatigue of the pressurizer relief tank for the period of extended operation.
Request Provide additional information how metal fatigue of the pressurizer relief tank will be evaluated and managed for the period of extended operation.
DRAFT RAI 3.2.2-1
=
Background===
The GALL Report, Table V.C, item V.C-4, indicates that stainless steel containment isolation piping and component internal surfaces exposed to treated water are subject to loss of material/pitting and crevice corrosion as an aging effect/mechanism. The GALL Report states that the aging effect/mechanism can be managed by the Water Chemistry and One-time Inspection Programs. The GALL Report further states that a further evaluation should be conducted on these components.
Issue Section 3.2.2.2.8 of the LRA indicates that the further evaluation associated with this component is not applicable because the containment isolation components were "evaluated in the systems in which the components were found to have the function of containment integrity." Staff is unclear why the applicant indicates that this further evaluation for steel containment isolation piping is not applicable. Request Provide additional information what is meant by the containment isolation components were evaluated in the system in which the components were found to have the function of containment integrity. In addition, if a further evaluation is conducted for these components in a different system, provide the location of the further evaluation. If further evaluations were not conducted for these components, provide additional justification.
DRAFT RAI 3.3.2-1
=
Background===
The GALL Report, Table VIII, item VIII.A-5 is for copper piping exposed to treated water in the steam turbine system. The GALL Report suggests the use of the Water Chemistry Program augmented with the One-Time Inspection Program to manage loss of material and selective leaching in this system. However, the GALL Report in Table VII, item VII.C2-7 is for copper piping (Zinc > 15 percent) exposed to treated water in the Closed-Cycle Cooling Water System. The GALL Report suggests that loss of material and selective leaching for this component and system be managed by the Selective Leaching of Materials Program. One of the main differences between these two programs as described in the GALL Report is that hardness measurements are incorporated into the Selective Leaching of Materials Program, not in the Water Chemistry Program.
Issue Table 3.3.2-4 of the LRA indicates that a copper alloy (Zinc > 15 percent) piping exposed to demineralized water is consistent with GALL Report item VIII.A-5. However, LRA Table 3.3.2-4 is a closed-cycle cooling water system. As such it seems that the GALL Report item VII.C2-7 may be more appropriate for this material. It is not clear to the staff how the Water Chemistry Program augmented with the One-Time Inspection Program is sufficient to manage the loss of material for the LRA closed-cycle cooling water component since these programs do not require hardness testing.
Request Provide additional explanation on how the Water Chemistry Program (B2.1.2) and the One-Time Inspection (B2.1.16) will address the aging effect for loss of material for the copper alloy piping exposed to demineralized water in a Closed-Cycle Cooling Water System.
Discussion: The applicant indicated that all questions are clear. These draft questions will be sent in a formal RAI.
Palo Verde Nuclear Generating Station, Units 1, 2, and 3 cc: Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Mr. Douglas Kent Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 40 Buckeye, AZ 85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 S. 40th Street Phoenix, AZ 85040 Mr. Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Dwight C. Mims, Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. John C. Taylor, Director, Nuclear Generation El Paso Electric Company 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Highway, Bldg. D21 San Clemente, CA 92672 Mr. Robert Henry Salt River Project 6504 E. Thomas Road Scottsdale, AZ 85251 Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Mr. Eric Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100
Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 N. Congress Avenue Austin, TX 78701-3326
Mr. Randall K. Edington Executive Vice President Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Station 7602 Phoenix, AZ 85072-2034