Crystal River Unit 3 NRC Emergency Preparedness Annual Inspection Report 05000302/2010502
ML110730807
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/09/2011
From: Bonser B R
NRC/RGN-II/DRS/PSB1
To: Franke J A
Florida Power Corp
References
IR-10-502
Download: ML110730807 (3)


Text

March 9, 2011

Mr. Jon Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street Crystal River, FL 34428-6708

SUBJECT: CRYSTAL RIVER UNIT 3 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000302/2010502

Dear Mr. Franke:

On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Crystal River Nuclear Plant. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000302/2010502. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72

cc w/encl.: (See page 2)

FPC 2 cc w/encl: R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution

Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc. Electronic Mail Distribution

James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A) Florida Power Corporation Electronic Mail Distribution

Christos Kamilaris Director Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution

William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B) Electronic Mail Distribution

Joseph W. Donahue Vice President Nuclear Oversight Carolina Power and Light Company Electronic Mail Distribution Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution

David T. Conley Associate General Counsel Legal Dept. Progress Energy Service Company, LLC Electronic Mail Distribution

Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd Crystal River, FL 34428

Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050

Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250

ML110730807 X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP SIGNATURE RA RA NAME B. BONSER D. RICH DATE 03/09/2011 03/08/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO