IR 05000280/2012001

From kanterella
Revision as of 17:52, 18 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Assessment Letter, Surry Power Station, Units 1 and 2, 05000280/2012001 and 05000281/2012001
ML13063A279
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/04/2013
From: McCoy G J
NRC/RGN-II/DRP/RPB5
To: Heacock D A
Virginia Electric & Power Co (VEPCO)
References
IR-12-001
Download: ML13063A279 (7)


Text

March 4, 2013

Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 REPORT 05000280/2012001 AND 05000281/2012001

Dear Mr. Heacock:

On February 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you your facility. The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRC Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4551 with any questions you may have regarding this letter.

Sincerely,/RA/ Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

Enclosure:

Surry Inspection / Activity Plan (03/01/2013 06/30/2014) cc w/encl: (See page 3)

_________________________ XSUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE SON:/RA/ GJM:/RA/ NAME SNinh GMcCoy DATE 2/27/2013 02/27/2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 3/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl: Larry Lane Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq. Senior Counsel Dominion Resources Services, Inc. Electronic Mail Distribution Tom Huber Director, Nuclear Licensing & Operations Support Innsbrook Technical Center Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883 Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution Letter to David from Gerald J. McCoy dated March 4, 2013.

SUBJECT: SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT 05000280/2013 AND 05000281/2013 Distribution w/encl: C. Evans L. Douglas OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

Surry Inspection / Activity Plan 03/01/2013

-06/30/2014 Unit Number Page 1 of 2 03/04/2013 08:33:30 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 1 EP-EMERGENCY PREPAREDNESS EXERCISE 1, 2 07/15/2013 07/19/2013 IP 7111401 Exercise Evaluation 1, 2 07/15/2013 07/19/2013 IP 71151 Performance Indicator Verification 2 RP-RP PUBLIC RAD SAFETY BASELINE 1, 2 06/17/2013 06/21/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/17/2013 06/21/2013 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/17/2013 06/21/2013 IP 71151 Performance Indicator Verification 4 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 1, 2 07/08/2013 07/12/2013 IP 71152B Problem Identification and Resolution 1, 2 07/22/2013 07/26/2013 IP 71152B Problem Identification and Resolution 2 ISI-UNIT 1 INSERVICE INSPECTION 1 10/28/2013 11/01/2013 IP 7111108P Inservice Inspection Activities - PWR 1 SGISI-UNIT 1 SG INSERVICE INSPECTION 1 11/04/2013 11/08/2013 IP 7111108P Inservice Inspection Activities - PWR 1 ISI-UNIT 2 IN-SERVICE INSPECTION 2 04/28/2014 05/02/2014 IP 7111108P Inservice Inspection Activities - PWR 2 RP-RP OCCUPATIONAL BASELINE 1, 2 04/28/2014 05/02/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/28/2014 05/02/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/28/2014 05/02/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/28/2014 05/02/2014 IP 71124.04 Occupational Dose Assessment 1, 2 04/28/2014 05/02/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 04/28/2014 05/02/2014 IP 71151 Performance Indicator Verification 1 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 2 05/05/2014 05/09/2014 IP 7111108P Inservice Inspection Activities - PWR 3 RP-RP OCCUPATIONAL BASELINE WEEK2 1, 2 05/12/2014 05/16/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/12/2014 05/16/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/12/2014 05/16/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/12/2014 05/16/2014 IP 71124.04 Occupational Dose Assessment 1, 2 05/12/2014 05/16/2014 IP 71124.05 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Surry Inspection / Activity Plan 03/01/2013

-06/30/2014 Unit Number Page 2 of 2 03/04/2013 08:33:30 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title 3 RP-RP OCCUPATIONAL BASELINE WEEK2 1, 2 05/12/2014 05/16/2014 IP 71151 Performance Indicator Verification Comments: This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.