ML17284A783

From kanterella
Revision as of 23:29, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1998 for WNP-2.With 981007 Ltr
ML17284A783
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1998
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-98-174, NUDOCS 9810140213
Download: ML17284A783 (6)


Text

CATEGORY 1 REGULAR Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:9810140213 DOC.DATE: 98/09/30 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAI"E AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Sept 1998 for WNP-2.With 981007 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME POSLUSNY,C COPIES LTTR ENCL 1 1 INTERNAL: ACRS RGN4 CE R 1 1 1 1 1 1 AEOD/SPD/RRAB OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D 0 MN NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO.Box 968~Richland, Washington 99352-0968 October 7, 1998 G02-98-174 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT SEPTEMBER 1998 Transmitted herewith is the Monthly Operating Report for the month of September 1998 as required by Technical Specification 5.6.4.Respectfully, G.O.Smith Plant General Manager Mail Drop 927M CC: EW Merschoff-NRC RIV C Poslusny, Jr.-NRR GA Pick-NRC RIV NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/1399/p 98iOi402i3 980930.7 PDR ADOCK 0500039'7," 8'DRQ; l~l*

~~UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: October I, 1998 COMPLETED BY: B Kasko TELEPHONE:

(509)377M73 REPORT PERIOD: SEPTEMBER 1998 No.NA Date Type F: Forced S: Scheduled Duration (Hours)Reason (1)Method (2)Cause and Corrective Action To Prevent Recurrence

SUMMARY

The plant entered and ended the month at full power operation.

1 REASON A-equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other 2 METHOD 1-anua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other v~I"I OPERATING STATUS REPORT for WNP-2 Date: October 1, 1998 2.3;4 5.Docket: 50-397 Reporting Period: SEPTEMBER 1998 Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,): 1153 1107 6.7.8.9.Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 720.0 720.0 0.0 819,113 YEAR 4,387.0 4,166.2 0.0 4,475,644 CUMULATIVE 86,632.3 83,665.2 3,037.5 80,889,501 10.Challenges to safety/relief valves: None