ML17285A466

From kanterella
Revision as of 22:38, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1989 for WPPSS-2.W/890509 Ltr
ML17285A466
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1989
From: HUTCHISON L, POWERS C M
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8905220037
Download: ML17285A466 (8)


Text

ACCELERATED D1S1N1BUTION DE M ON STR ON SYSj'Eg 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)4~/sf DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATXON HUTCHXSON,L.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON

SUBJECT:

Monthly operating rept for Apr 1989 for WPN-2.R DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR J ENCL TITLE: Monthly Operating Report (per Tech Specs)NOTES 90509 tr.SIZE: RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR DRE 0 EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 4 4 1 1 10 10 1 1 1 1 1 1 1 1 1 1, 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1 1 1-1 2 2 1 1 1 1 1 1 1 1 1 1'I S h~TO ALL"RIDS" RECIPXENIS'LEASE HELP US K)REMKZ WASTE!CXNZAC1'1HE DOQ3MEM1'GN1'ROL DESK, RCCM Pl-37 (EXT.20079)TO ELOCUTE KRJR NAME FKR DISTKCBVX'ION LISTS FOR DOCUME2GS YOU DGNIT NEZD1 D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30 ii WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 May 9;1989 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555

Dear Sir.:

SUBJECT:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for April 1989 as required by our Technical Specifications 6.9.1.6.Very Truly Yours, C.N.Powers (N/D 927M)WNP-2 Plant Manager CNP/lc Enclosure cc: Nr.Nr,.Ms.Nr.Mr.J.B.Martin C.J.Bosted Dottie Sherman J.T.Wheelock W.H.Lovelace NRC Region V NRC Site Representative (901A)ANI, Farmington CT INPO NRC, Washington D.C.

OPERATING DATA REPORT WNP-2 Oj-Nay-89 1.DOCKET: 50-397 2.REPORTING PERIOD 3.UTILITY CONTACT.Apr-89 OUTAGE+ON-LINE HOURS LEONARD HUTCHI SON (509)'77-2486 719 4.LICENSED THERNAL POWER (NWt): 5.NAMEPLATE RATING (GROSS NWe)a 6.DESIGN ELECTRICAL RATING (NET NWe): 7.NAXIMUN DEPENDABLE CAPACITY (GROSS NWe)." 8.NAXIMUN DEPENDABLE CAPACITY (NET NWe)c 3323 1200.9 1100 1140 1095 9.IF CHANGES OCCUR ABOVE SINCE LAST REPORT~GIVE REASONS.10.POWER TO WHICH RESTRICTED~

'IF ANY (NET NWe)a ii.REASONS FOR RESTRICTIONS, IF ANY!~DMIN-NSIQ QQ IP+QEgQLF 12.13.14.15.16.17.18.19 20.21.22 23 24.25.REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHTDWN HRS HRS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERNAL ENERGY (NWH)GROSS ELECTRICAL ENERGY (NWg)NET ELECTRICAL ENERGY (NWH)UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (NDC NET)UNIT CAPACITY FACTOR (DER NET)UNIT FORCED OUTAGE RATE FORCED OUTAGE HOURS MONTH 719 675.7 0.0 669.8 0.0 1719132 561420 537925 93.2/93.2X 68.3X"68.0/0.0%0.0 YEAR CUMULATIVE 2879 38383.2 2703.8'8921.4 0.0 340.4 2663.2 27827.8 0.0 381.7 712i092 7623229'7 2347280 25380780 2255554 24423862 92.5X 72 5X 92.5/73.5/71.5/58.1/71.2/57.8%3.0%9 1/83.6 2775.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 NONTHB (TYPEqDATE~DURATION)'ONE 27.IF CURRENTLY SHUTDOWN EBTINATED STARTUP DATE: 6/14/89 8905220037 890430 PDR ADOCK 05000397 R PDC v tvett f(I',"'I", Jl't iL>4 CJ~~j'L Ij~v,>>.tvvvt'l lft I" Et 1, I~.I)'I>>.'~7j.If-J~v<>i I I"I Vtt'I I.IJ'ji3>>'.,jt"~jtt 4 I t f'lv~I['l'f t, IJ"<<.jvttjl~j<<tk<<Ivan I j~h v VII vtf,'tll v vC>>j tl 1>>7 I~I If'-\Il 4 I 11 I If s I~I V~+~*vh tv)"I., C Vv'I~>>'I t'I.A~$4>>'v ,t/t I't~, I,"l3<'fl, I~%a~I, ('.t v't lpga QI v va,gt f'"" j'0 P""3'R t'8"PP3 I.,<<i<<v'>If>>

1Cj<<."'."t~",it)j>>ij Jljv J v y tf Qg I I v v I'1 vvg IQ<<')'>>t<<"'.I,tt'

<lgl'I (il;.'"I'I, t<<4.'l" 0'-3"Ii$.t H I>~" jt'jP'I>>II>>w'"2"v i<<'~J3 t I>>I tf'<I(',,",4PP,>>

'..v"'";t.f.)'j.">>lJ d.j";'l'f..>~j>'j.j t;I(I,'>J4"Gl"" ij I'cv/gy1 vt'I I jv v'I,)'I',tt I I tlat.I tgvt j lil>>v II e d' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.WHP-2 flONTH APRIL 1989 DAY AVERAGE DAILY POWER LEVEL (YwE-Het)818 17.DATE'/1/89 COgPI ETED 8Y LB HUTCHISON TELEPHONE (509)377"2486 DAY AVERAGE DAILY POWER LEVEL (h1wE-Het) 817 2.3.5.6.7.8.9.10.12.13.14.15.16.658 813 815 799 805 806 816 816 815 816 816 814 808 807 817 18.19.20.21.22.23.24.25.26.27.28.29'0.31.813 807 803 790 815 817 812 814 817 815 684 INSTRUCT IOHS On this form, list the average daily unit power level in VMe-Net for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100'5 line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

a 0 4 I 1~DOCKET NO.5O-397 UNIT NNlE DnTE 5/I/89 BEKAT PEAICD APRIL 19 89 mcnth, year'NIT SIUTDONNS/REDUCTIONS

'OMPLETED DY LB HUTCHISON TELEPllONE 509 377-2486 FE.~m'xi%Iiol3n~WnhsGH~sc'iV 89-06 4/28/89 S 49.2 C I tatlK v i i~llll'C FUELXX PLANT SHUTDOWN AS SCHEDULED FOR REFUELING OUTAGE R-4 SUht l/NY WNP-2 OPERATED ROUTINELY IN APRIL.SHUTDOWN ON 28TH FOR SCHEDULED REFUELING OUTAGE TYPE F-Forced S-Schcd A-Equip Failure 0-Haint or Test~C-Ref ue ling D-Aegulatory Res triction E-Operator Training h License Examination F-Admin G-Oper Error l)-Other 1-thanual 2-manual Scram 3-pluto Scram 4-Continued 5 neduced Qnad 9-Other SYSTEM Ec COMPOhCNT Exhibit F h H Instructions for Preparation oi'ata E'ntry Sheet ucensee Event Report (LiER)File (NUAEG-Oldl)

(g