Monthly Operating Rept for Mar 1992 for Washington Public Power Supply Nuclear Plant 2.W/920408 Ltr
ML17289A493
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1992
From: BAKER J W, HUTCHISON L B
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-92-082, GO2-92-82, NUDOCS 9204280434
Download: ML17289A493 (9)


Text

ACCELERATED D><TRIBUTION DEMONS~TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System BAKER,J.W.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar Washington Public Power Supply Nuclear Plant 2.20408 r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR C ENCL J SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES'ECIPIENT ID CODE/NAME PD5 LA DEAN,W.INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA NRR/DPP,Q/~BE 0 G~FII E 0 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 0

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Bax 968~3000 George Wasbtngton Way~Rtcbiand, Wasbtngton 99352-0968

~(509)372-5000 Docket No.50-397 April 8, 1992 G02-92-082 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555

Dear Sir:

Subject:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT MARCH 1992 Transmitted herewith is the Monthly Operating Report for the month of March 1992 as required by our Technical Specifications 6.9.1.6.Very truly yours, J.W.Baker WNP-2 Plant Manager (MD 927M)LBH:bap Enclosure CC: Mr.W.H.Lovelace, NRC, Washington DC Mr.J.B.Martin, NRC Region V Ms.Dottie Sherman, ANI, Farmington CT Mr.C.Sorensen, NRC Resident Inspector (901A)Mr.J.T.Wheelock, INPO Mr.F.Yost, Utility Data Institute 92042S0434 920331 PDR*DOCK 05000397 I R PDR'I 4g t%C H'1 K N g ql p t 5 i DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: APRIL 1, 1992 COMPLETED BY: LB HUTCHISON TELEPHONE:

(509)377-2486'C UNIT HUTD OWNS REDUCTIONS 0 0 NO.DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT AUSE&CORRECTIVE ACTION TO PREVENT RECURRENCE 92-02 2/25/92 F 436.4 H 92-007 SE RECOMB Concluded outage for modificaiton of Containment Atmospheric Control (CAC)drain piping.

SUMMARY

WNP-2 returned to service on March 19 after completion of plant modifications.

TYPE F-FORCED S-SCHED REASON A-EQUIP FAILURE B-MAINT OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING&LICENSE EXAM F-ADMIN G-OPER ERROR H-OTHER METHOD 1-MANUAL 2-MANUAL SCRAM 3-AUTO SCRAM 4-CONTINUED 5-REDUCED LOAD 9-OTHER SYSTEM&COMPONENT EXHIBIT F&H INSTRUCTIONS FOR PREPARATION OF DATA ENTRY SHEET LICENSEE EVENT REPORT (LER)FILE (NUREG4161)

~'(~ll OPERATING DATA REPORT WNP-2 DATE 01-Apr-,92 1.DOCKET: 50-397 2.REPORTING PERIOD: Mar-92 3.UTILITY CONTACT: OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509)377-2486 744 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRICAL RATING (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe): 9 I F CHANGES OCCUR ABOVE S INCE LAST REPORT I GIVE REASONS None.3323 1200.9 1100 1129 1085 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): ll.REASONS FOR RESTRICTIONS, IF ANY: 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 744 329.9 0.0 307.6 0.0 950983 319990 301461 41.34 41.34'7.34 36.84 58.74 436.4 YEAR 2184 1669.0 0.0 1632.0 0.0 5250611 1781190 1705536 74.74'4.7%72.0%71.04 25.34 552.0 CUMULATIVE 63968.2 45059.7 340.4~43431.9 381.7 124866433 41637010 39963575 67.9c 68.5~0 57.14 56.84 13.6<6855.8 26~SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE i DURATION)Refuelin outa e R-7 startin A ril 17 1992 for.74 da s.27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

~~A RAGE DAILY UNIT POWER L L MONTH: MARCH 1992 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:

50-397 WNP-2 MARCH 1992 LB HUTCHISON (509)377-2486 DAY AVERAGE DAILY POWER LEVEL (M We-NET)DAY AVERAGE DAILY POWER LEVEL (MWe-NET)17.18.19.160 20.775 21.1045 22.1086 23.1085 24.1081 9.1082 10.26.1079 27.]073 12.28.1089 13.29.1085 14.30.1081 15.31.1079 16.INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH.COMPUTE TO THE NEAREST WHOLE MEGAWATI'.

THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH.NOTE THAT WHEN MAXIMUM DEPENDABLE CAPACITY IS USED FOR THE NET ELECTRICAL RATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 1009o LINE (OR THE RESTRICTED POWER LEVEL LINE).IN SUCH CASES, THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.

~~~,~~~I w V