Monthly Operating Rept for Sept 1996 for WNP-2.W/961009 Ltr
ML17292A537
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1996
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-193, NUDOCS 9610160404
Download: ML17292A537 (7)


Text

CATEGORY 1 REGULA~INFORMATION DISTRZBUTZOYSTEM (RIDE)AC C E S S I 0 N N BR 9 6 1 0 1 6 0 4 0 4 DO C~DAT E 9 6/0 9/3 0 NOTA R I 2 E D NO D 0 C K ET I FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION KASKO,B.Washington Publ i c Powe.r Supply System SMITHFG.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for sept 1996 for WNP-2.W/961009 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR

)ENCL (SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME COLBURN,T COPIES LTTR ENCL 1 1 0 INTERNAL: ACRS RG CE5RE Ol 1 1 1 1 1 1 AEOD/SPD/RRAB NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 WASHINGTON PUBLIC POWER.SUPPLY SYSTEM PO.Box 968~3000 George Washington Way~Richland, Washington 993S2-0968

~(509)372-SOOO October 9, 1996 G02-96-193 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT SEPTEMBER 1996 Transmitted herewith is the Monthly Operating Report for the month of September 1996 as required by Technical Specification 6.9.1.6.Respectfully, G.O.Smith Plant General Manager Mail Drop 9270 CC: LJ Callan-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N NS Reynolds-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399 Pbi01,60404 960930 PDR ADOCK 05000397 R PDR lBOO7o l

OPERATING STATUS REPORT for WNP-2 Date: October 1, 1996 2.3.4, 5.6.7.8.9.10.Outage+On-line Hours: 720.0 3486 1199 1153 1153 1107 none none Docket: 50-397 Reporting Period: SEPTEMBER 1996 Utility Contact: Bernice Kasko (509)377-4473 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,);Maximum Dependable Capacity-summer (Gross MW,): Maximum Dependable Capacity-summer (Net MW,): If changes occur above since last report, give reasons: Power to which restricted, if any (Net MW,): Reasons for restrictions, if any: 12.13.14.15.16.17.18.19.20.21.22 23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 720.0 720.0 0.0 720.0 0.0 2,163,228 718,180 689,604 100.0%100.0%86.5%83.1%0.0%0.0 YEAR 6,575.0 4,027.8 985.9 3,790.6 997.4 9,968,103 3,281,380 3,114,405 57.7%72.8%42.8%41.1%3.2%123.3 CUMULATIVE 103,423.2 73,663.6 1,730.8 71)041.1 1,956.2 210,425,653 70,858,860 67,872,723 68.7%70.6%60.1%59.2%10.6%8,443.0 26.Shutdowns scheduled over the next 6 months (type, date, duration):

None 27.If currently shutdown, estimated startup date: Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.

I REPORT PERIOD: SEPTEMBER 1996 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: October 1, 1996 COMPLETED BY: B Kasko TELEPHONE:

(509)377M73 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 741 770 651 977 1098 1106 1089 1110 1059 1100 1074 1012 956 554 551 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 472 588 1134 1127 1103 636 740 1129 1142 1141 1138 1134 1133 1133 1135 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

REPORT PERIOD: SEPTEMBER 1996 UNIT SHUTDOWNS AND POWER REDUCTIONS 4 C~DOCKET NO.: 50-39 UNIT NAME: WNP-2 DATE: October 1, 1996 COMPLETED BY: B Kasko TELEPHONE:

(509)377-4473 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 96-10 9/13/96 S Zero 96-11 9/20/96 S Zero H N/A N/A N/A N/A ZZZZZZ On September 13th power was reduced to 52%at the request of BPA.HC/RB HTEXCH/On September 20th power was reduced to 60%to VALVCX plug a leaking tube in the main condenser and replace some scram solenoid pilot valves.SUhIMARY: At the end of the month WNP-2 was operating at 100%power.TYPE orced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-ŽOlher METHOD~i-Manua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT N GAl 1E tts&H