ML17292A361

From kanterella
Revision as of 20:34, 5 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for June 1996 for WNP-2.W/960712 Ltr
ML17292A361
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1996
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-137, NUDOCS 9607170076
Download: ML17292A361 (10)


Text

REGULATOINFORMATION DISTRIBUTION STEM(RIDS)ACCESSION NBR:9607170076 DOC.DATE:

96/06/30NOTARIZED:

NODOCKETIFACIL:50-397-WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.NAMEAUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITHiG.O.

Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT

'AFFILIATION

SUBJECT:

Monthlyoperating reptforJune1996forWNP-2.W/960712 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME PD4-2PDINTERNAL:

ACILECENTOlNCOPIESLTTRENCL11111111RECIPIENT IDCODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB COPIESLTTRENCL111111EXTERNAL:

LITCOBRYCE,JHNRCPDR1111NOAC11NOTETOALL"RIDSl'ECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESKiROOMOWFN5D-5(EXT~415-2083)

TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED(TOTALNUMBEROFCOPIESREQUIRED:

LTTR10ENCL10 oI'4~\t'I WASHINGTON PUBLICPOWERSUPPLYSYSTEMPO.Box968~3000GeorgeWashington Way~Richland, Washington 99352-0968

~(509)372-5000July12,1996G02-96-137 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:

Subject:

WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTJUNE1996Transmitted herewithistheMonthlyOperating ReportforthemonthofJune1996asrequiredbyTechnical Specification 6.9.1.6.Respectfully, G.O.SmithPlantGeneralManager(MailDrop9270)cc:LJCallan-NRCRIVTGColburn-NRRKEPerkins,Jr.-NRCRIV,WCFONRCSr.ResidentInspector

-927NNSReynolds-Winston&StrawnINPOANILibraryUtilityDataInstitute

-DLWilliams

-BPA/399fv~o7i7oo7s 9sossoPDR~"ADGCK0500039'7 RPDR.~~>/i l4%'1'W8=%NP4'ItClH OPERATING STATUSREPORTforWNP-2Date:July1,19962.3.4.5.6.7.8.9.Outage+On-lineHours:720.034861199115311531107noneDocket:50-397Reporting Period:JUNE1996UtilityContact:BerniceKasko(509)377-4473LicensedThermalPower(MW,):Nameplate Rating(GrossMW,):DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(GrossMW,):MaximumDependable Capacity-summer(NetMW,):Ifchangesoccurabovesincelastreport,givereasons:10.Powertowhichrestricted, ifany(NetMW,):11.Reasonsforrestrictions, ifany:none12.13.14.15.16.17.18.19.20.21.22.23.24.25.ReportPeriodHoursHoursReactorCriticalRxReserveShutdownHoursHoursGenerator On-LineUnitReserveShutdownHoursGrossThermalEnergy(MwH)GrossElectrical Energy(MWH)NetElectrical Energy(MWH)UnitServiceFactorUnitAvailability FactorUnitCapacityFactor(MDCNet)UnitCapacityFactor(DERNet)UnitForcedOutageRateForcedOutageHoursONT720.0334.70.0109.00.0121,34317,9806,31215.1%15.1%0.8%0.8%53.3%123.3YEAR4,367.01,819.8985.91,582.6997.44,546,703 1,523,270 1,435,103 36.2%59.1%29.7%28.5%7.3%123.3CUMULATllUg 101,215.2 71,455.61,730.868,833.11,956.2205,004,253 69,100,750 66,193,421 68.0%69.9%59.9%59.0%10.9%8,443.026.Shutdowns scheduled overthenext6months(type,date,duration):

None27.Ifcurrently

shutdown, estimated startupdate:Note:Cumulative UnitCapacityFactors(MDC&DER)arecalculated withweightedaverages.

4I~40ILv4v-Iv%1vvh'l4Iviv44v4 r~ttAVERAGEDAILYUNITPOWERLEVELC~REPORTPERIOD:JUNE1996DOCKETNO.:50-397UNIT:WNP-2DATE:July1,1996COMPLETED BY:BKaskoTELEPHONE:

(509)377-4473DAYAVERAGEDAILYPOWERLEVEL(NetMWe)AVERAGEDAILYPOWERLEVELDAY(NetMWe)1012131415-14-14-14-14-15-15-14-14-14-14-14-14-14-1416'1718192021222324252627282930-17-16-16-16-1669136160145-18-18-17-18-16136INSTRUCTIONS Onthisform,listtheaveragedailyunitpowerlevelinMWe(net)foreachdayinthereporting month.Computetothenearestwholemegawatt.

Thesefigureswillbeusedtoplotagraphforeachreporting month.Notethatwhenmaximumdependable capacityisusedforthenetelectrical ratingoftheunit,theremaybeoccasions whenthedailyaveragepowerlevelexceedsthe100%line(ortherestricted powerlevelline).Insuchcases,theaveragedailyunitpoweroutputsheetshouldbefootnoted toexplaintheapparentanomaly.

1keE4ill UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORTPERIOD:JUNE1996DOCKETNO.:50-397UNITNAME:WNP-2DATE:July1,1996COMPLETED BYBKaskoTELEPHONE:

(509)377M73No.DateTypeHoursReasonMethodLERNumberSystem,Component CauseandCorrective ActionToPreventRecurrence 96-084/13/96S487.7NARCtFUELXXContinuation frompreviousmonth-Plantenteredannualrefueling andmaintenance outage(R-11)onApril13,1996.96-096/25/96F124.3A96~3CHINSTRUDigitalfeedwater controller error,changemadetothecontroller softwaretopreventrecurrence.

SUMMARY:WNP-2exitedtheannualrefueling andmaintenance outage(R-11)onJune21.ThereactorwasmanuallyscrammedonJune24duetoanunexpected plantresponseduringtestingofthenewadjustable speeddrives.AttheendofthemonthWNP-2wasoperating at25%powerandcontinuing withstartuptesting.TYPEF-ForcedS-Scheduled REASONA-Equipment FailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Operational ErrorH-OtherMETHOD1-Manual2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-OtherSYSTEM&COMPONENT NUREG%161 ExhibitsF&H 0~'PD