ML17292A592

From kanterella
Revision as of 20:11, 5 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1996 for WNP-2.W/961011 Ltr
ML17292A592
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1996
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-223, NUDOCS 9611190191
Download: ML17292A592 (9)


Text

CATEGORY1REGULAT(INFORMATION DISTRIBUTIONOCSTEM (RIDE)ACCESSION NBR:9611190191 DOC.DATE:

96/10/31NOTARIZED:

NODOCKET¹FACII;:5p-,.397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.IAIAME

AUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.

Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly,operating reptforOct1996forWNP-2Operating LicenseNPF-21.W/961011 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:ERECIPIENT IDCODE/NAME PD4-2PDINTERNAL:

FILECENTER108/DBA/PAD EXTERNALLITCOBRYCEIJHNRCPDRCOPIESLTTRENCL111111111111RECIPIENT IDCODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4NOACCOPIESLTTRENCL11111111110RDUNOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR11ENCL11

~~l WASHINGTON PUBLICPOWERSUPPLYSYSTEMI'.O.Box968~3000GeorgeWashington Way~Richland, Washington 99352-0968

~(509)372-5000October11,1996G02-96-223 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:

Subject:

WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTOCTOBER1996Transmitted herewithistheMonthlyOperating ReportforthemonthofOctober1996asrequiredbyTechnical Specification 6.9.1.6.Respectfully, G.O.SmithPlantGeneralManagerMailDrop9270cc:LJCallan-NRCRIVTGColburn-NRRKEPerkins,Jr.-NRCRIV,WCFONRCSr.ResidentInspector

-927NNSReynolds-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/3999biii90i9i 9b103iPDRADOCK05000397, RPDR IO14hIh;~4'J OPERATING STATUSREPORTforWNP-2Date:November1,19962.'.4.6.7.8.9.10.11.Outage+On-lineHours:745.034861199115311531107nonenoneDocket:50-397Reporting Period:OCTOBER1996UtilityContact:BerniceKasko(509)377-4473LicensedThermalPower(MW,):Nameplate Rating(GrossMW,):DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(GrossMW,):MaximumDependable Capacity-summer(NetMW,):Ifchangesoccurabovesincelastreport,givereasons:Powertowhichrestricted, ifany(NetMW,):Reasonsforrestrictions, ifany:12.13.14.15.16.17.18.19.20.21.22.23.24.25.ReportPeriodHoursHoursReactorCriticalRxReserveShutdownHoursHoursGenerator On-LineUnitReserveShutdownHoursGrossThermalEnergy(MWH)GrossElectrical Energy(MWH)NetElectrical Energy(MWH)UnitServiceFactorUnitAvailability FactorUnitCapacityFactor(MDCNet)UnitCapacityFactor(DERNet)UnitForcedOutageRateForcedOutageHoursMONTH745.0745.00.0745.00.02,432,864 822,140793,218100.0%100.0%96.2%92.3%0.0%0.0YEAR7,320.04,772.8985.94,535.6997.412,400,967 4,103,520 3,907,623 62.0%75.6%48.3%46.3%2.6%123.3CUMULATIVE 104,168.2 74,408.61,730.871,786.11,956.2212,858,517 71,681,000 68,665,941

,68.9%70.8%60.3%59.4%10.5%8,443.026.Shutdowns scheduled overthenext6months(type,date,duration):

Refueling outagebegins4/12/97,durationis42days27.Ifcurrently

shutdown, estimated startupdate;Note:Cumulative UnitCapacityFactors(MDC&DER)arecalculated withweightedaverages.

ttAVERAGEDAILYUNITPOWERLEVELREPORTPERIOD:OCTOBER1996DOCKETNO.:50-397UNIT:WNP-2DATE:November1,1996COMPLETED BY:BKnskoTELEPHONE:

(509)377M73DAYAVERAGEDAILYPOWERLEVEL(NetMWe)AVERAGEDAILYPOWERLEVELDAY(NetMWe)101213141511401143113911311112113711341133106010068926398901136114216171819202122232425262728293031114311381123113711301139114511011042103677910241042104910591087INSTRUCTIONS Onthisform,listtheaveragedailyunitpowerlevelinMWe(net)foreachdayinthereporting month.Computetothenearestwholemegawatt.

Thesefigureswillbeusedtoplotagraphforeachreporting month.Notethatwhenmaximumdependable capacityisusedforthenetelectrical ratingoftheunit,theremaybeoccasions whenthedailyaveragepowerlevelexceedsthe100%line(ortherestricted powerlevelline).Insuchcases,theaveragedailyunitpoweroutputsheetshouldbefootnoted toexplaintheapparentanomaly.

~I~fQ4 UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORTPERIOD:OCTOBER1996DOCKETNOut50-397UNlTNAME.'NP-2 DATE:November1,1996COMPLETED BY:BKaskoTELEPHONE:

(509)377M73No.DateTypeHoursReasonMethodLERNumberSystemComponent CauseandCorrective ActionToPreventRecurrence 96-1210/11/96SZero96-1310/26/96FZeroN/AN/AN/AN/ACHPUMPXXReducedpowertoperformscramtimetesting,turbinevalvetestinganddigitalfeedwater testing.CBMOTORXReducedpowertoperformmaintenance onASDchannel1A2.SUMMARY:AttheendofthemonthWNP-2wasoperating at100%power.TYPEF-ForcedS-Scheduled REASONA-Equipment FailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration 6-Operational ErrorH-OtherMETHOD~1-Menue2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-OtherSYSTEM&COMPONENT G411ttsF&,

IpIAII'