ML17292A933

From kanterella
Revision as of 19:21, 5 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr
ML17292A933
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1997
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, GO2-97-142, NUDOCS 9707220092
Download: ML17292A933 (7)


Text

fyCATEGORY1REGULRTINFORMATION DISTRIBUTIONSTEM (RIDE)ACCESSION NBR:9707220092 DOC.DATE:

97/06/30NOTARIZED:

NODOCKETFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.NAPE AUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.

Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT.

AFFILIATION

SUBJECT:

Monthlyoperating reptforJune1997forWNP-2.W/970715 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR iENCL~SIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME PD4-2PDINTERNAL:~ACRS~

(+FILECENTER,O1~OC/DBA'/PAD'XTERNAL:

LITCOBRYCE,JHNRCPDRCOPIESLTTRENCL111111111111RECIPIENT IDCODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4NOACCOPIESLTTRENCL1111111111NOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFNSD-'5(EXT.

415-2083)

TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:

LTTR11ENCL11f C'

WASHINGTON PUBLICPOWERSUPPLYSYSTEMPO.Box968~Richiand, Washington 99352-0968 July15,1997G02-97-142 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:

Subject:

WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTJUNE1997Transmitted herewithistheMonthlyOperating ReportforthemonthofJune1997asrequiredbyTechnical Specification 5.6.4.Inaccordance withtheguidancecontained inGenericLetter97-02,theformatofthisreporthasbeenamended.Respectfully, G.0,SmithPlantGeneralManagerMailDrop9270CC:EWMerschoff

-NRCRIVTGColburn-NRRKEPerkins,Jr.-NRCRIV,WCFONRCSr.ResidentInspector

-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/399:~Anc~-4,9707220092 970630PDRADQCK0500039'7 RPDRJlllilllllllllllllllll'Illllllllllll!

OPERATING STATUSREPORTforWNP-2Date:July1,19971.Docket:50-3972.Reporting Period:JUNE19973,UtilityContact:BerniceKasko(509)377-44734.DesignElectrical Rating(NetMW,):5..MaximumDependable Capacity-summer(GrossMW,):115311536.7.8.9.HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MWH)MONTH0.00.0696.0-8,485YEAR2,049.22,049.21,248.01,699,500 CUMULATIVE 77,921.875,299.33,204.272,007,775 10.Challenges tosafety/relief valves;SeeAttachedTable UNITSHUTDOWNS DOCKETNO.:50-397UNITNAME:WNP-2DATE:July1,1997COMPLETED BY:BKaskoTELEPHONE:

(509)377M73REPORTPERIOD:JUNE1997No.DateTypeF:ForcedS:Scheduled Duration(Hours)Reason(1)Method(2)CauseandCorrective ActionToPreventRecurrence 97-012970419720.0Plantenteredannualrefueling andmaintenance outage(R-12)onApril19,1997.SUMMARY:Theplantcontinued themonthintheannualplannedrefueling/maintenance outagewhichbeganonApril19,1997.~lREASONA-Equipment FailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Operational ErrorH-Other~2METHOD1-Manual2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-Other SRVCHALLENGES DATETYPEREASOMS-RV-1BMS-RV-1DMS-RV-2AMS-RV-2BMS-RV-2D'S-RV-3AMS-RV-4AMS-RV-4CMS-RV-4DMS-RV-5C6/17/976/17/976/17/976/17/976/17/976/17/976/17/976/17/976/17/976/17/97BBBBBBBBBBCCCCCCCCCCeofActuation ReasonA=Automatic B=RemoteManualC=SpringA=Overpressure B=ADSorothersafetyC=TestD=Inadvertent (Accidental/Spurious)

E=ManualReliefAlloftheMSRVsfunctioned normally.

TherewerenootherMSRVchallenges duringtheperiod.

~g4ptJ.tji~1VI,/J