ML17292B392

From kanterella
Revision as of 18:36, 5 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr
ML17292B392
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1998
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-98-083, GO2-98-83, NUDOCS 9805210250
Download: ML17292B392 (10)


Text

CATEGORY1REGULATINFORMATION DISTRIBUTIO YSTEM(RIDS)ACCESSION NBR:9805210250 DOC.DATE:

98/04/30NOTARIZED:

NOFACXL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPoweAUTH.NAMEg

'UTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.

Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION DOCKET05000397

SUBJECT:

Monthlyoperating reptforApr1998forWNP-2.W/980513 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:C.A1TRECIPIENT IDCODE/NAME PD4-2PDINTERNAL:

ACRSECENTECOPIESLTTRENCL11111111RECIPIENT IDCODE/NAME POSLUSNY,C AEOD/SPD/RRAB OC/DBA/PAD COPXESLTTRENCL111111EEXTERNAL:

LITCOBRYCE,JHNRCPDR1111NOAC11DENNOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPXESREQUIRED:

LTTR10ENCL10 4

WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Richland, Washington 99352-0968 May13,1998G02-98-083 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:

Subject:

WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTAPRIL1998Transmitted herewithistheMonthlyOperating ReportforthemonthofApril1998asrequiredbyTechnical Specification 5.6.4.PRespectfully, G.O.SmithPlantGeneralManagerMailDrop927Mcc:EWMerschoff

-NRCRIVCPoslusny, Jr.-NRRKEPerkins,Jr.-NRCRV,WCFONRCSr.ResidentInspector

-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute

,DLWilliams-BPA/399i4'IAl49805210250 980430PDRADOCK05000397RPDRpUIV Id,~h)

OPERATING STATUSREPORTforWNP-2Date:May1,19982.3.45.Docket:50-397Reporting Period:APRIL1998UtilityContact:BerniceKasko(509)377-4473DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(NetMW,):115311076.7.8.9.HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MwH)MON'TH415.1~409.50.0446,168YEAR2,396.02,352.50,02,570,429 CUMULATIVE 84,641.381,851.53,037.578,984,286 10.Challenges tosafety/relief valves:Seeattachedtable 4ha'I'IIIIIIP4IIII'fiII~h,t~~lh UNITSHUTDOWNS REPORTPERIOD:APRIL1998DOCKETNO.:55-397UNITNAME:WNP-2DATE:May1,1998COMPLETED BY:BKaskoTELEPHONE:

(509)377M73No.DateTypeF:ForcedS:Scheduled Duration(Hours)Reason(1)Method(2)CauseandCorrective ActionToPreventRecurrence 98-024/17/98309.5Plantenteredannualrefueling andmaintenance outage(R-13)onApril17,1998SUMMARY:Theplantenteredtheannualplannedrefueling/maintenance outageonApril17,19981REASONA-utpmentFailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Operational ErrorH-Other2METHOD1-Man2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-Other 10f~k'Mlh3"4It4c"-LEl~w%4P,II't COMPONENT 0SRVCHALLENGES DATETYPEREASONCOMMENTSMS-RV-1AMS-RV-1CMS-RV-2CMS-RV-2DMS-RV-3AMS-RV-3DMS-RV-4AMS-RV-4CMS-RV-4DMS-RV-5CMS-RV-1BMS-RV-1DMS-RV-3CMS-RV-4B4/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/98BBBBBBBBBBBBBBBCCCCCCCCCCCCTestingperformed atapproximately 25%power,as-foundsetpressures werewithintolerance SameasaboveSameasaboveSameasaboveSameasaboveSameasaboveSameasaboveSameasaboveSameasaboveSameasaboveTestingperformed atapproximately 25%power,as-foundsetpressures werenotwithintolerance butotherwise strokedasexpected.

TheseSRVsarebeingreplacedandwillberefurbished andretestedSameasaboveSameasaboveSameasaboveeofActuation A=Automatic B=RemoteManualC=SpringReasonA=Overpressure B=ADSorothersafetyC=TestD=Inadvertent (Accidental/Spurious)

E=ManualReliefTherewerenootherSRVchallenges duringtheperiod.

'09r+4'L4'>>CgPg'I'Jk*kTib,