ML17292B639

From kanterella
Revision as of 18:21, 5 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr
ML17292B639
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1999
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-069, GO2-99-69, NUDOCS 9904220239
Download: ML17292B639 (4)


Text

CATEGORYj.REGULAYINFORMATION DISTRIBUTI SYSTEM(RIDS)ACCESSION NBR:9904220239 DOC.DATE:

99/03/31NOTARIZED:

NOFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPoweAUTH.NAMEAUTHORAFFIL1ATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.

Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION DOCKET05000397

SUBJECT:

Monthlyoperating reptforMar1999forWNP-2.With 990413ltr.CDISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME LPD4-2PDINTERNAL:

ACtggEBMmRGN4COPIESLTTRENCL11111111RECIPIENT IDCODE/NAME CUSHING,J AEOD/SPD/RRAB OC/DBA/PAD COPIESLTTRENCL111111EXTERNAL:

LMITCOMARSHALLNRCPDRNOAC11D1+p,iY(utNNOTETOALL"RIDS'tRECIPIENTS PLEASEHELPUSTOREDUCEWASTE~TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR10ENCL10 WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Ricltland, Washington 99352-0968 April13,1999GO2-99-069 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentContxolDeskWashington, D.C.20555Gentlemen:

Subject:

WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTMARCH1999Transmitted herewithistheMonthlyOperating ReportforthemonthofMarch1999asrequiredbyTechnical Specification 5.6.4.Respectfully, G.O.SmithVicePresident, Generation MailDrop927MCC:EWMerschoff

-NRCRIVJSCushing-NRRNRCSr.ResidentInspector

-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/13999904220239 99033iPDRADQCKOM00397RPDR OPERATING STATUSREPORTforWNP-2Date:April1,19992.3.45.Docket:50-397Reporting Period:MARCH1999UtilityContact:BerniceKasko(509)377-4473DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(NetMW,):NMONTHYEAR11531107CUMULATIVE 7.9.HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MWH)744.0744.00.0749,9902,160.02,160.00.02,270,192 91,001.388,034.23,037.585,600,123 10.Challenges tosafety/relief valves:None UNITSHUTDOWNS DOCKETNO.:50-397UNITNAME:WNP-2DATE:April1,1999COMPLETED BY:BKaskoTELEPHONE:

(509)377M73REPQRTPERIoD:MARCH1999No.NADateTypeF:ForcedS:Scheduled Duration(Hours)Reason(1)Method(2)CauseandCorrective ActionToPreventRecurrence SUhGHARY:

Duetoeconomicdispatchtheplantoperatedat100%powerduringthedayMonday-Fridayandreducedpowerintheeveningsto85%.Duringtheweekendspowerwasreducedto65%.Following anincreaseinpowerto88%onMarch29,theplantwasreducedto70%powertorecoverarepairedASDchannel.Theplantwasreturnedto100%poweronMarch30~.~lREASONA-Equipment FailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining8cLicenseExamination F-Administration G-Operational ErrorH-Other2METHOD1-Manua2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-Other