ML17292B664

From kanterella
Revision as of 18:16, 5 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr
ML17292B664
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1999
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-089, GO2-99-89, NUDOCS 9905190121
Download: ML17292B664 (5)


Text

REGULAZINFORMATION DISTRIBUTIO

.YSTEM(RIDS)ACCESSION NBR:9905190121 DOC.DATE:

99/04/30NOTARIZED:

NODOCKETFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.NAMEAUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.Washington PublicPowerSupplySystemRECIP.NAME

'ECIPIENT AFFILIATION

SUBJECT:

Monthlyoperating'ept forApr1999forWNP-2.With 990507ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME LPD4-2PDINTERNAL:ACRSLECENTER01NCCOPIESLTTRENCL111111RECIPIENT IDCODE/NAME CUSHING,J AEOD/SPD/RRAB OC/DBA/PAD COPIESLTTRENCL111111EXTERNAL:

LMITCOMARSHALLNRCPDR1111NOACD'ENOTETOALL"RZDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTETH'TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR10ENCL10 WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Richland, Washington 99352-0968 May7,1999GO2-99-089 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:

Subject:

WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTAPRIL1999Transmitted herewithistheMonthlyOperating ReportforthemonthofApril1999asrequiredbyTechnical Specification 5,6.4,Respectfully, G.O.SmithVicePresident, Generation MailDrop927M/iCC:EWMerschoff

-NRCRIVJSCushing-NRR.qQ8QNRCSr.ResidentInspector

-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/13999905i90i2i 990430PDRADGCK05000397RPDR OPERATING STATUSREPORTforWNP-2Date:May1,19992.3.4.5.Docket:50-397Reporting Period:APRIL1999UtilityContact:BerniceKasko(509)377-4473DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(NetMW,):115311076.7.8.9HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MWH)MONTH388.2386.2'.0366,627YEAR2,548.22,546.20.02,636,819 CUMULATIVE 91,389.588,420.43,037.585,966,750 10.Challenges tosafety/relief valves:None UNITSHVIOWNSDOCKETNO.:50-397UNITNAME:WNP-2DATE:May1,1999COMPLETED BY:BKaskoTELEPHONE:

(509)377M73REPORTPERIOD:APRIL1999No.99-001Date04/17/99TypeF:ForcedS:Scheduled Duration(Hours)332.8Reason(1)Method(2)HCauseandCorrective ActionToPreventRecurrence SUMMARY:Theplantbeganthemonthat100%powerandcontinued economicdispatchuntilApril17whentheplantwasshutdownforaFuelSavingsDispatchOutage.1REASONA-u>pmentFailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Oyerational ErrorH-Other2METHOD1-Manua2-ManuaScram3-AutoScram4-Continued 5-ReducedLoad9-Other A'tg~