Public Version of Procedure Temporary Sheet to Emergency Plan Procedure PMP 2081 EPP.020, Activation & Operation of Technical Support Ctr. Revised Index Encl
ML17326B078
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/17/1982
From: CAMPBELL D, SIMMS R, VINCE S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17326B077 List:
References
PROC-820917-01, NUDOCS 8210190040
Download: ML17326B078 (4)


Text

lAS%i'U~'~'O~

OI"+"'"~~0'2

"~'QOg3"'JThistemporary sheetapplies'.oInstruction orProcedure

~~c.papRevisionNo.1Operation o-oneiecnnicai 2OS1EPP.020,:=4IPORAPYThefollowing change(X)instituted effective (Date)newrequirement

()shallbetADD:4.3.4Uponactivation of-theEOF,PublicAffairspersonnel willmovefromtheTSCtotheEOF.BeforeleavingtheTSC,thePublicAffairspersonnel willobtaincopiesofthechronological historylogandgivethemtotheCorrmunications DirectorupontheirarrivaltotheEOF.IntheeventthattheEOFismannedbeforethePublicAffairspersonnel reporttotheTSC,arunnerfromtheOSAwillbedispatched totheEOFwithcopiesofthechronological historylog.Reason:ProvidehistoryoftheeventtoEOFpersonnel withouthavingtotieupthededicated testphones.Thisleavesthededicated testphoneopenfortransmittal ofcurrentkeypointsconcerning theevent.ADD:4.3.5NoteIfthereisnotareleasepresently occurring orifthedatausedinthedosecalculation isnotconsidered asbeingreliable.

ExhibitCmuststillbeprocessed.

ExhibitCcontainsadditional information (besidesdosassessment information) thatmustberelayedtooff-siteagencies.

Reason:Clarifyaproblempointidentified duringanemergency plandrill,Thischangeshouldbemadeapermanent revisiontotheInstruction orProcedure:

o(YEScINO0NOTKNOWN,additional reviewrequiredExpirati'on Date:Procedure RevisionOriginator:

Management Staff:SeniorReactoror:PNSRCDateStandardDist.ListNo.:Distribution:

FormNo.4330REov'h'xlro82i0190040 82i00iWHITE-ORIGINALPDRADOCK05000aiS, CANARY-ORIGINATOR COPYFORMNo.PMI20104REV.2I;FPDR chN4\,k5

~~~~~~~PMPEPPINDE'ONALD C.COOKi'iUCL"AR PLANTPLANTMANAGERPROCEDURE IndexIdent,if1cationNumberTitleRevis.or,.'lo..'ndGateCommentsPMP2081EPP.014EPP.015EPP.016EPP.017EPP.018EPP.019EPP.020EPP.021EPP.022EPP.023EPP.024Off-SiteOoseAssessments SamplingandAnalysisofWaterborne ReleasesCollection andAnalysisofLiquidandGaseousSamplesInterpretation ofLiquidandGaseousSamplesTransportation Accidents Involving Radioactive MaterialAEPEmergency ResponseOrganization Activation andManagement Activation andOperation oftheTechnical SupportCenter(TSC)Activation andOperation oftheOperations StagingAeea(OSA)andPersonnel Accountabi 1ityAct&ation andOperation oftheEmergency Operations FacilityActivation andOperation oftheEmergency ControlCenter(ECC)(AnEmergency Operations Faci1ity)Activation andOperation oftheJointPublicInformation Center(JPIC)(AnEmergency Operations Facility)

Revision04-1-81Revision04-1-81Revision04-1-81Revision04-1-81Revision16-24-82Revision04-1-8$Revision18-24-82Revision15-25-82Revision16-4-82CANCELLEO 82Revision16-24-82TP-1,2-25-82 ExpN/ATP-1,9-9-82 ExpNA3