Public Version of Procedure Temporary Sheet to Emergency Plan Procedure PMP 2081 EPP.020, Activation & Operation of Technical Support Ctr. Revised Index Encl
ML17326B078
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/17/1982
From: Campbell D, Simms R, Vince S
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17326B077 List:
References
PROC-820917-01, NUDOCS 8210190040
Download: ML17326B078 (4)


Text

l AS%i'U~'~'O~ OI" +"'"~~0'2 "~ 'QOg 3"'J This temporary sheet applies '.o Operation o- one iecnnicai ,:= 4IPORA P Y Instruction or Procedure ~~c.

pap 2OS1 EPP . 020 Revision No. 1 The following change ( X ) new requirement ( ) shall be instituted effective (Date) t ADD:

4.3.4 Upon activation of- the EOF, Public Affairs personnel will move from the TSC to the EOF. Before leaving the TSC, the Public Affairs personnel will obtain copies of the chronological history log and give them to the Corrmunications Director upon their arrival to the EOF. In the event that the EOF is manned before the Public Affairs personnel report to the TSC, a runner from the OSA will be dispatched to the EOF with copies of the chronological history log.

Reason: Provide history of the event to EOF personnel without having to tie up the dedicated test phones. This leaves the dedicated test phone open for transmittal of current key points concerning the event.

ADD:

4.3.5 Note If there is not a release presently occurring or if the data used in the dose calculation is not considered as being reliable. Exhibit C must still be processed. Exhibit C contains additional information (besides dos assessment information) that must be relayed to off-site agencies.

Reason: Clarify a problem point identified during an emergency plan drill, This change should be made a permanent revision to the Instruction or Procedure:

o(YES cINO 0 NOT KNOWN, additional review required Expirati'on Date: Procedure Revision Standard Dist. List No.:

Originator: Distribution:

Management Staff:

Senior Reactor or:

PNSRC Date Form No. 4330 ov'h 'xl ro RE ORIGINAL 82i0190040 82i00i WHITE CANARY ORIGINATOR COPY PDR ADOCK 05000aiS, FORM No. PMI 20104 REV. 2 I; F PDR

c h N4\

,k 5

~ ~ ~

~ ~

~ ~

PMP EPP INDE'ONALD C. COOK i'iUCL"AR PLANT PLANT MANAGER PROCEDURE Index Ident, f ti on i 1 ca Title Revi s.or, .'lo ..'nd Comments Number Gate PMP 2081 EPP.014 Off-Site Oose Assessments Revision 0 TP-1,2-25-82 Exp N/A 4-1-81 EPP. 015 Sampling and Analysis of Revision 0 Waterborne Releases 4-1-81 EPP.016 Collection and Analysis of Revision 0 Liquid and Gaseous Samples 4-1-81 EPP.017 Interpretation of Liquid Revision 0 and Gaseous Samples 4-1-81 EPP.018 Transportation Accidents Revision 1 Involving Radioactive 6-24-82 Mater i al EPP.019 AEP Emergency Response Revision 0 Organization Activation and 4-1-8$

Management EPP.020 Activation and Operation of Revision 1 TP-1,9-9-82 Exp NA the Technical Support Center 8-24-82 (TSC)

EPP.021 Activation and Operation of Revision 1 the Operations Staging Aeea 5-25-82 (OSA) and Personnel Accountabi 1 i ty EPP.022 Act&ation and Operation of Revision 1 the Emergency Operations 6-4-82 Facility EPP.023 Activation and Operation of CANCELLEO the Emergency Control Center 82 (ECC) (An Emergency Operations Faci1 i ty)

EPP.024 Activation and Operation of Revision 1 the Joint Public Information 6-24-82 Center (JPIC) (An Emergency Operations Facility) 3