MONTHYEARNL-17-049, Unit Nos., 1, 2, and 3, License Amendment Request - Cyber Security Plan Implementation Schedule2017-04-28028 April 2017 Unit Nos., 1, 2, and 3, License Amendment Request - Cyber Security Plan Implementation Schedule Project stage: Request ML17142A4122017-05-22022 May 2017 Acceptance Review for Indian Point Units 1, 2 & 3 - License Amendment Request Cyber Security Plan Milestone 8 Implementation Schedule Project stage: Acceptance Review ML17187A1952017-07-0606 July 2017 Regulatory Audit Plan for July 10-11, 2017, Audit in Support of License Amendment Request to Extend Milestone 8 Implementation Date Project stage: Other NL-17-096, Supplemental Information for License Amendment Request - Cyber Security Plan Implementation Schedule2017-08-0909 August 2017 Supplemental Information for License Amendment Request - Cyber Security Plan Implementation Schedule Project stage: Supplement ML17245A0012017-09-15015 September 2017 Staff Audit Summary Related to License Amendment Request to Extend Milestone 8 Full Implementation Date Project stage: Other ML17278A1802017-09-22022 September 2017 09/22/2017 E-mail from R. Guzman to G. Dahl Administrative Error Identified in ML17245A001, Indian Point Regulatory Audit Summary, LAR to Extend Milestone 8 Full Implementation Project stage: Other NL-17-124, Revised Supplemental Information for License Amendment Request - Cyber Security Plan Implementation Schedule2017-09-28028 September 2017 Revised Supplemental Information for License Amendment Request - Cyber Security Plan Implementation Schedule Project stage: Supplement ML17296A2352017-10-23023 October 2017 Request for Additional Information -10/23/17 E-mail from R.Guzman to R.Louie Cyber Security Plan Milestone 8 Implementation Schedule (CAC Nos. MF9656, MF9657, MF9658; EPID: L-2017-LLA-0217) Project stage: RAI ML17315A0002017-12-0808 December 2017 Issuance of Amendments Cyber Security Plan Implementation Schedule (CAC Nos. MF9656, MF9657, and MF9658; EPID: L-2017-LLA-0217) Project stage: Approval 2017-07-06
[Table View] |
|
---|
Category:Audit Plan
MONTHYEARML21231A1822021-08-26026 August 2021 Unit, No. 3 - Audit Plan in Support of Review of License Amendment Request Regarding the Installation and Use of a New Auxiliary Lifting Device ML17207A1652017-09-0101 September 2017 License Renewal Audit Plan Regarding the Service Water Integrity Program ML17187A1952017-07-0606 July 2017 Regulatory Audit Plan for July 10-11, 2017, Audit in Support of License Amendment Request to Extend Milestone 8 Implementation Date ML17177A4462017-07-0606 July 2017 Audit Plan for Licensee Responses Concerning Seismic Hazard Reevaluations Related to Request for Information -(50.54(F) Letter) Regarding Recommendation 2.1 of the Near-Term Task Force ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML15327A2132015-12-21021 December 2015 Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA ML15301A0932015-10-30030 October 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15124A3402015-05-0606 May 2015 Nuclear Regulatory Commission Plan for the Audit of Entergy Nucleaer Operations, Inc'S. Flooding Hazard Reevaluation Report Submittal Relating to the Fukushima Near-Term Task Force Recommendation 2.1 - Flooding for Indian Point Nuclear Gene ML14356A0032015-02-10010 February 2015 Audit of Licensee Responses to the Expedited Seismic Evaluation Process to Support Implementation of Near-Term Task Force Recommendation 2.1, Seismic ML14121A4312014-05-0505 May 2014 Regulatory Audit Plan for May 27 - 30, 2014, Audit at the Indian Point Facility to Support Review of Near Term Task Force Recommendation 2.1: Flooding Hazard Reevaluation Report (TAC MF3313 & MF3314) ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 2021-08-26
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] |
Text
!\Eau( UNITED STATES "'>-.. 011,,_ NUCLEAR REGULATORY COMMISSION /!! o WASHINGTON, D.C. 20555-0001 <t 0 : July 6, 2017 '<'/. 1-'? **M: Anthony J. Vitale Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 1, 2 AND 3 -REGULATORY AUDIT PLAN FOR JULY 10-11, 2017, AUDIT IN SUPPORT OF LICENSE AMENDMENT REQUEST TO EXTEND MILESTONE 8 IMPLEMENTATION DATE (CAC NOS. MF9656, MF9657, AND MF9658)
Dear Mr. Vitale:
By application dated April 28, 2017 (Agencywide Documents Access and Management System Accession No. ML 17129A612), Entergy Nuclear Operations, Inc. submitted a license amendment request to implement a change to the Indian Point Energy Center Cyber Security Plan implementation schedule Milestone 8 full implementation date. To support its safety evaluation, the U.S. Nuclear Regulatory Commission staff will conduct an audit at the Indian Point Energy Center in Buchanan, New York, on July 10-11, 2017. The Regulatory Audit Plan is enclosed. If you have any questions, please contact me at 301-415-1030 or Richard.Guzman@nrc.gov. Docket Nos.50-003, 50-247, and 50-286
Enclosure:
Regulatory Audit Plan cc w/encl: Distribution via Listserv Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REGULATORY AUDIT IN SUPPORT OF LICENSE AMENDMENT REQUEST TO IMPLEMENT A CHANGE TO THE INDIAN POINT ENERGY CENTER CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE MILESTONE 8 FULL IMPLEMENTATION DATE ENTERGY NUCLEAR OPERATIONS, INC. INDIAN POINT NUCLEAR GENERATING UNIT NOS. 1, 2, AND 3 DOCKET NOS.50-003, 50-247, AND 50-286 (CAC NOS. MF9656, MF9657, AND MF9658) 1.0 PURPOSE AND SCOPE Entergy Nuclear Operations, Inc. (Entergy, the licensee) submitted a license amendment request (LAR) (Reference 1) to change the Indian Point Energy Center (IPEC) Cyber Security Plan (CSP) Milestone 8 full implementation date as set forth in the CSP implementation schedule approved by Reference 2, as amended by References 3, 4, and 5. The U.S. Nuclear Regulatory Commission (NRC) staff's review of the LAR has commenced in accordance with the Office of Nuclear Reactor Regulation's (NRR's) Office Instruction LIC-101, "License Amendment Review Procedures." The NRC staff has determined that a regulatory audit of the IPEC's LAR will be conducted in accordance with NRR Office Instruction LIC-111, "Regulatory Audits," for the staff to gain a better understanding of the licensee's proposed change to the implementation schedule. A regulatory audit is a planned license or regulation-related activity that includes the examination and evaluation of primarily non-docketed information. A regulatory audit is conducted with the intent to gain understanding, verify information, and/or identify information that will require docketing to support the basis of a licensing or regulatory decision. Performing a regulatory audit of the licensee's information is expected to assist the staff in efficiently conducting its review or gain insights on the licensee's processes or procedures. 2.0 AUDIT AGENDA The audit is scheduled to start on the afternoon of July 1 O, 2017, and finish on July 11, 2017, at IPEC in Buchanan, New York. The agenda will include discussion and/or examination of:
- Definition of "high-risk safety-related Critical Digital Assets (CDA)."
- List of CDA screening results, including CDAs screened into the high-risk safety-related category.
- Specific controls that are implemented in the Entergy fleet Milestone 8 program.
- Discussion of cyber security issues pending in the corrective action program.
- Discussion of the timeline for modifications pending to support the cyber security program. 3.0 AUDIT TEAM The audit will be conducted by NRC staff from the Office of Nuclear Security and Incident Response (NSIR)/Division of Physical and Security Policy (DPSP)/Cyber Security Branch (CSB) and the Office of Nuclear Reactor Regulation (NRR)/Division of Risk Assessment (DRA)/PRA Licensing Branch-2 (APLB). Observers at the audit may include the NRA project managers and regional inspectors. The audit team will consist of:
- James Beardsley, Team Leader, Chief, NSIR/DPSP/CSB
- Jeff Rady, Reactor Inspector, Engineering Branch 2, Region I
- Candace de Messieres, Reliability and Risk Analyst, NRR/DRA/APLB, Risk-Informed Licensing Initiatives Team
- Richard Guzman, Sr., Project Manager, NRA, Division of Operating Reactor Licensing (attending by virtual conference)
- Eric Lee, Sr., Cyber Security Specialist, NSIR/DPSP/CSB (attending by virtual conference) 4.0 INFORMATION AND OTHER MATERIAL NECESSARY FOR THE AUDIT No documents are requested prior to the audit. During the audit, documents may be requested by the NRC staff to aid in understanding the scope of the LAA request and the process used for the basis of the LAA. 5.0 LOGISTICS This regulatory audit is starting on July 10, 2017, and will last approximately 1 % days. The NRC staff conducted a conference call on June 26, 2017, to discuss the details of the audit plan. The audit will take place in the Generation Support Building within the Site Owner Controlled Area at IPEC where the necessary reference material and appropriate subject matter experts will be available to support the review. Visitor access will be requested for the entire audit team. The audit team will require the following to support the regulatory audit:
- Telephone available to call NRG headquarters.
- Virtual conferencing capability to facilitate additional NRG staff participation.
- Designated private space for internal NRG staff discussion.
- Wireless internet in meeting spaces. 6.0 DELIVERABLES Following the audit, the NRG staff will prepare an audit summary documenting the information reviewed during the audit and any open items identified as a result of the audit. The NRG staff will also document its understanding of the proposed resolution of any identified open items. The audit summary may be provided to the licensee in draft form for proprietary markup. The audit summary will be placed in the Agencywide Documents Access and Management System (ADAMS).
7.0 REFERENCES
1. Letter from Anthony J. Vitale, Site Vice President, Entergy, Indian Point Energy Center, to NRG, "License Amendment Request -Cyber Security Plan Implementation Schedule, Indian Point Unit Nos. 1, 2, and 3," dated April 28, 2017 (ADAMS Accession No. ML 17129A612). 2. NRG letter to Entergy, "Indian Point Nuclear Generating Unit Nos. 1, 2 and 3 -Issuance of Amendments Re: License Amendment Request -Cyber Security Plan," dated August 2, 2011 (ADAMS Accession No. ML 11152A027). 3. NRG letter to Entergy, "Indian Point Nuclear Generating Unit Nos. 1, 2 and 3 -Issuance of Amendments Re: Cyber Security Plan Implementation Schedule Milestones," dated November 28, 2012 (ADAMS Accession No. ML 12258A268). 4. NRG memorandum to Barry Westreich from Russell Felts, "Review Criteria for Title 10 of the Code of Federal Regulations Part 73.54, Cyber Security Implementation Schedule Milestone 8 License Amendment Requests," dated October 24, 2013 (ADAMS Accession No. ML 13295A467). 5. NRG letter to Entergy, "Indian Point Nuclear Generating Unit Nos. 1, 2 and 3 -Issuance of Amendments Re: Cyber Security Plan Implementation Schedule," dated December 11, 2014 (ADAMS Accession No. ML 14316A526).
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 1, 2 AND 3 -REGULATORY AUDIT PLAN FOR JULY 10-11, 2017, AUDIT IN SUPPORT OF LICENSE AMENDMENT REQUEST TO EXTEND MILESTONE 8 IMPLEMENTATION DATE (CAC NOS. MF9656, MF9657, AND MF9658) DATED JULY 6, 2017 DISTRIBUTION: PUBLIC RidsACRS_MailCTR Resource RidsNrrDorlLp11 Resource RidsNrrDraAplb Resource RidsNrrLALRonewicz Resource RidsNrrPMlndianPoint Resource RidsRgn1 MailCenter Resource JBeardsley, NSIR CAiien, NSIR KLawson-Jenkins, NSIR CDeMessieres, NRR ADAMS A ccess1on N ML 17187A195 o.: OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NAME RGuzman LRonewicz DATE 07/06/2017 07/05/2017 OFFICE NSI R/DPCP/CSB/BC* NRR/DORL/LPL 1/BC NAME JBeardsley JDanna DATE 07/06/2017 07/06/2017 OFFICIAL RECORD COPY *b >Y e-ma1 NRR/DRA/APLA/BC* GCasto 07/06/2017 NRR/DORL/LPL 1/PM RGuzman 07/06/2017