ML20058C444

From kanterella
Revision as of 10:34, 17 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IST Plan for Pumps & Valves First Interval, Rev 3
ML20058C444
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/23/1993
From: Mays R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20058C432 List:
References
PROC-931123, NUDOCS 9312020457
Download: ML20058C444 (15)


Text

!

i COMANCHE PEAK STEAM ELECTRIC STA110N UNil 1 & Z.

i INSERVICE TESTIN3 PLAN FOR PUMPS AND VALVES FIRST INTERVAL j

i REVISION 3 i

i i

j Frepared By:

k 3 McV4 h

4Ze#

Date: //-2243'

(

(

Approved By:

,,l/ -

Date: //-22 -/f Mtnager, Hect.anical Engineering b

3 /

Approved By:

lear Operations tm 7 Date:

Vice Presicent, 9312O20457 931124 PDR ADDCK 05000445 G

PDR i

i CPSES/IST Plan 1.3 Dates of Test Interval Implementation of this 1989 Edition IST Plan will be completed on CPSES Unit 1 before that unit is returned to power following the third refueling outage and at that time will supercede in its entirety the originel Unit 1 Inservice Testing Plan for Pumps and Valves developed for the first inspection interval. The original Unit 1 IST Plan was implemented per the requirements of the 1986 Edition of Section XI. This 1989 Edition IST Plan constitutes an update of the original Unit 1 IST Plan to a later approved Code edition as allowed by 10CFR50.55a(f)(4)(iv) and as approved by the j

3 NRC staff.

This IST Plan will remain in effect for Unit 1 for the 120 month interval following the date of the Unit 1 commercial i

operation (August 13,1990).

i This IST Plan will remain in effect for Unit 2 for the 120 month interval following the date of the Unit 2 commercial operation (August 3, 1993).

2 If, in the future, it is determined to be advantageous to place both Unit 1 and Unit 2 on the same schedule for periodic 120 month IST Plan updates, then the Unit 2 IST program may be updated coincident with the required update to the Unit 1 program. Alternatively, the Unit 1 IST program may be updated coincident with the required update to the Unit 2 program. This would effectively extend the first test interval for Unit 1 beyond the required 120 months and would therefore require a NRC staff approved exemption from regulation 3

10CFR50.55a(f)(4)(ii) prior to 120 months from the date of the Unit 1 commercial operation.

I 2

1.4 Approval Status This IST Plan was submitted to the NRC staff on July 2, 1992 via TXX-92302 requesting:

1.

Approval to update the Unit 1 IST program to the requirements of the 1989 Edition of ASME Section XI as described in this IST Plan; 2.

Approval of a proposed schedule for phasing in the implementation of this IST Plan for Unit 1; and, 3.

Approval of the Relief Requests contained in Appendix A of this IST Plan for use in the testing of Unit 1 and Unit 2.

COMANCHE PEAK - UNITS 1 AND 2 1-2 Rev. 3 November 19, 1993

m COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 INSERVICE VALVE TESTING PLAN TABLE 1 - AUXILIARY FEEDWATER PAGE 5 0F 11 Test Parameters / Schedule Flow Valve /

Safety fail Position Valve Diagram Actuator Code Cate-Func-Func.

Leak Exercise Safe Indicator Number (Coord )

Type ilg Qu

ggDC, tion Pos.

M Test M

M Remarks l

1AF-0220 M1-0218-1A CK/SA 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu-(C-4)

RR V3 RR V2 lator to Non-Safety Air Supply isolation AF-0221 M1-0218-1A CK/SA i/2 3

A/C A

C LT/2VR CV/Q N/A N/A Safety-Related Air Accumu-(C-4)

RR V3 RR V2 lator to Non-Safety Air M2-0218-2 Supply Isolation (C-5)

AF-0222 M1-0218-1A CK/SA 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu-(C-4)

RR V3 RR V2 lator to Non-Safety Air M2-0218-2 Supply Isolation (C-5) 3 1AF-0223 M1-0218-1A CK/5A 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu-(A-4)

RR V3 RR V2 lator to Non-Safety Air Supply Isolation 2AF-0224 M2-0218-2 CK/SA 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu-(C-4)

RR V3 RR V2 15 tor to Non-Safety Air Supply Isolation 1AF-0224 M1-0218-1A CK/SA 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu-(A-4)

RR V3 RR V2.

lator to Non-Safety Air Supply Isolation 2AF-0223 M2-0218-2 CK/SA 1/2 3

.A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu-(C-4)

RR V3 RR V2 lator to Non-Safety Air Supply Isolation 1AF-0226 M1-0218-1A CK/5A 1/2 3

A/C A

C LT/2VR CV/Q N/A N/A Safety-Related Air Accumu-(B-4)

RR V3 RR V2 lator to Non-Safety Air Supply Isolation 2AF-0227 M2-0218-2 CK/SA 1/2-3-

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Acctinu-t (B-4)

RR V3 RR V2 lator to Non-Safety Air Supply Isolation 1AF-0227-M1-0218-1A CK/SA 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu-(B-4)

RR V3 RR V2 lator to Non-Safety Air Supply Isolation 2AF-0226 M2-0218-2 CK/SA 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu--

4 (B-4)

RR V3' RR V2.

lator to Non-Safety Air Supply Isolation

-1 Rev. 3 November 19, 1993 i

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 INSERVICE VALVE TESTING PLAN TABLE 1 - AUXILIARY FEEDWATER PAGE 6 0F 11 Test Parameters / Schedule Flow Valve /

Safety fail Position Valve Otagram Actuator' Code Cate-Func-Func.

Leak Exercise Safe Indicator Number (Coord.)

Tvoe ligg

[.1g.s.1 ggty,,

tion

_.P_gi.,

M Test Tggi Ig11 Remarks AF-0228 M1-0218-1A CK/SA 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Acc mu-(A-4)

RR V3 RR V2 lator to Non-Safety Air M2-0218-2 Supply Isolation (D/E-4)

AF-0229 M1-0218-1A CK/SA 1/2 3

A/C A

C LT/2VR CV/Q N/A N/A Safety-Related Air Accumu-(A-4)

RR V3 RR V2 lator to Non-Safety Air M2-0218-2 Supply Isolation (D/E-4) 3 1AF-0230 M1-0218-1A CK/SA 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Acc ru-(8-4)

RR V3 RR V2 lator to Non-Safety Air Supply Isolation 2AF-0231 M2-0218-2 CK/SA 2/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu-(F-4)

RR V3 RR V2 lator to Non-Safety Air Supply Isolation 1AF-0231 M1-0218-1A CK/SA 1/2 3

A/C A

C LT/2VR CV/Q-N/A N/A Safety-Related Air Accmu-(B-4)

RR V3 RR V2 lator to Non-Safety Air Supply Isolation 2AF-0230 M2-0218-2 CK/SA 1/2 3

A/C A

C LT/2VR CV/Q N/A N/A Safety-Related Air Accumu-(F-4)

RR V3 RR V2 lator to Non-Safety Air Supply Isolation AF-0232 M1-0218-1 CK/SA 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu4 (F-2)

RR V3 RR V2 lator to Non-Safety Air t

M2-0218-1 Supply isolation (F-2)

AF-0233 M1-0218-1 CK/SA 1/2 3

A/C A

C LT/2YR CV/Q N/A N/A Safety-Related Air Accumu-(F-2)

RR V3 RR V2 lator to Non-Safety Air

.M2-0218-1 Supply 1 solation (F-2)

AF-0234 M1-0218-1 CK/SA 1/2 3

A/C A

C LT/2VR CV/Q N/A N/A Safety-Related Air Accumu-

- (F-1)

RR V3 RR V2 lator to Non-Safety Air M2-0218-1 Supply Isolation (D-1)

Rev. 3 November 19, 1993

~.

~

CWANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 INSERVICE VALVE TESTING PLAN i

i TABLE 2 - COMPONENT COOLING WATER PAGE 2 0F 10 Test Parametcrs/ Schedule Flow Valve /

Safety fail Posit:on Valve Diagram Actuator Code Cate-Func-Func.

Leak Exercise Safe Indicator Number (Coord.)

Type Sjfr E_1gn gory _ tion Pos.

Jnt Test Igil Int Remarks 2CC-0374 M2-0231 SCK/SA 2

3 C

A C

N/A CV/C5 N/A N/A RCP Themal Barrier Rupture (D-4)

(2)

Isolation CC G11 M1-0231 RE/SA 3/4 2

C A

0/C N/A SRV/

N/A N/A Containment Penetration 3

(F-2)

X 10YR Themal Relief M2-0231-A 1

(C-2) j CC-0618 M1-0231 RE/SA 3/4 2

C A

0/C N/A SRV/

N/A N/A Contairrnent Penetration 3

(F-3)

X 10YR Themal Relief M2-0231-A 1

(C-3)

CC-0629 M1-0231 CK/SA 2

2 A/C A

0/C LTJ/T5 CV/C5 N/A N/A Containment Penetration (C-4)

(3)

Thermal Relief /Contaiment M2-0231 Isolation (A-6)

CC-0E46 M1-0231-A.SCK/SA 2

3 C

A C

N/A CV/C5 N/A N/A RCP Themal Barrier Rupture 4

(2).

Isolation (D-4)

CC-0657 M1-0231-A SCK/SA 2

3 C

A C

N/A CV/C5 N/A N/A RCP Themal Barrier Rupti,Te (D-3)

(2)

Isolation M2-0231 (D-3)

CC-0681 M1-0231-A SCK/SA 2

'3 C

A C

N/A CV/C5 N/A N/A RCP Thermal Barrier Rupture (G-3)

(2)

Isolation M2-0231 (G-3)

Rev. 3 November 19, 1993

)

I COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 INSERVICE VALVE TESTING PLAN TABLE 5 - CONTAINMENT SPRAY PAGE 4 0F 6 Test Parameters / Schedule Flow Valve /

Safety Fail Position Valve Diagram Actuator Code Cate-Func-Func.

Leak Exercise Safe Indicator Number (Coord.)

Tvoe

_Si_zg

(_1_n agry._

tion Pos.

J_ ell

_l:1L Itit Isit R earks 3

LV-4754 M1-0232-A DA/MO 3

3 B

A 0/C N/A MT/Q N/A PIT /

Chmical Additive Flowpath/

(F-5) 2VR Chemical Additive Tank i

M2-0232-A Isolation (F-5)

LV-4755 M1-0232-A DA/MO 3

3 B

A 0/C N/A MT/Q N/A PIT /

Chmical Additive Flowpath/

(F-5).

2VR C;iemical Additive Tank M2-0232-A Isolation

'(F-5)

HV-4758 M1-0232-A GA/MO 16 2

B A

C N/A MT/Q N/A PIT /

Sump Recirculation Flowpath

-(D-2) 2YR Boundary

.M2-0232-A (0-2)

HV-4759 M1-0232-A CA/MO 16 2

B A

C N/A MT/Q N/A PIT /

Stanp Recirculation Flowpath (E-3) 2YR Boundary M2-0232-A' (E-3) t Rev. 3 November 19, 1993 7

. ~.

.. ~... -..

. ~.

- -.. ~ - - -.... - -. -

... ~

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 l

INSERVICE VALVE TESTING PLAN TABLE 13 - SAFETY INJECTION PAGE 3 0F 17 Test Parameters / Schedule Flow Valve /

Safety Fail Position Valve Diagram Actuator Code Cate-Func-Func.

Leak Exercise Safe Indicator i

Number (Coord.)

Type ligg

[lgn ggry_

tion

Pog, Igg Test Tgg Jrd Rmarks 8807B M1-0261 GA/MO 6

2 B

A 0/C N/A Ml/Q N/A PIT /

ECCS Recirculation (E-5) 2YR Flowpath/ Passive Pipe M2-0261 Break Isolation (B-6) 3 8808A M1-0262 GA/MO 10 2

B A

0 N/A MT/CS N/A PIT /

ECCS from Accumulators to (C-2)

(3) 2YR Cold Legs Flowpath M2-0263-8 (E-2) 8808B M1-0262 GA/MG lt, 2

B A

0 N/A MT/CS N/A PIT /

ECCS from Accumlators to (C-3)

(3) 2YR Cold Legs Flowpath M2-0263-B (E-3) 8808C M1-0262 GA/MO 10 2

B A

0 N/A MT/CS N/A-PIT /

ECCS from Accumulators to i

(C-5)

(3)-

2YR Cold Legs Flowpath M2-0.63-B (E-5) 88080 M1-0262 GA/MO 10 2

B A ^

0 N/A MT/CS N/A PIT /

ECCS from Accumulators to (C-6)

(3) 2YR

. Cold legs Flowpath M2-0263-B (E-6) 8809A M1-0255-B GA/M0 10 2

A A

0/C LTJ/TS MT/CS N/A PIT /-

ECCS to Cold Legs Flowpath/

(A-2)

(3) 2YR ECCS to Hot Legs Flowpath M2-0263-A Boundary & Passive Pipe (F-1)

Break Isolation & Contain-ment Isolation

-8809B lM1-0263-B GA/MO' 10.

2 A

A 0/C LTJ/TS-MT/CS-N/A

_ PIT /

ECCS to Cold Legs Flowpath/

(A-4)

(3) 2VR -

ECCS to Hot Legs Flowpath M2-0263-A Boundary & Passive Pipe (F-3)

Break isolation & Contain-ment isolation Rev. 3 November 19, 1993

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 INSERVICE VALVE TESTING PLAN TABLE 14 - SERVICE WATER PAGE 1 0F 3 Test Parameters / Schedule Flow Valve /

Safety fail Position Valve Diagrarn Actuator Code Cate-Func-Func.

Leak Exercise Safe Indicator

ggry, tion Pos.

Tmi Test Tnt Lelit Remarks Number (Coord.)

Type Size

[_1_ag r

SW-0016 M1-0233-A CK/SA 10 3

C A

0 N/A CV/Q N/A N/A Service Water Flowpath (C-3)

M2-0233-A (C-3)

SW-0017 M1-0233-A CK/SA 10 3

C A

0 N/A CV/Q N/A N/A Service Water Flowpath (C-5)

H2-0233-A-(C-5) 3 25W-0084 M2-0233 CK/SA 1

3 C

A 0

N/A CV/Q N/A N/A Service Water Flowpath l

(F-4) 3 25W-0085 M2-0233 CK/SA 1

3 C

A 0

N/A CV/Q N/A N/A Service Water Flowpath (F-3)

SW-0373 M1-0233 CK/SA 24 3

C A

0/C N/A CV/Q N/A N/A ServiceWaterFlowpath/

(D-3)

BackflowPrevention(to M2-0233 facilitatepumprestart)&

(B-4)

Service Water Flowpath Boundary (following puno failure)

SW-0374 M1-0233 CK/5A 24 3

C A

0/C N/A CV/Q N/A N/A Service Water Flowpath/

(E-3)

Backflow Prevention (to M2-0233 facilitatepumorestart)&

(D-4)

Service Water Flowpath Boundary (followingpunp failure) 3' 25W-0388-M2-0234 CK/SA 10 3

C A

0 N/A CVD/RF N/A N/A AFW Pump Emergency Supply

.(F-1)'

(1)

Flowpath i

4 4

- l Rev. 3 Noveter 19, 1993

..m. m m -m m

a e.+-

.--c'-

.-+r-

    • =v w

m---

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 INSERVICE VALVE TESTING PLAN 1ABLE 14 - SERVICE WATER PAGE 2 0F 3 Test Pararneters/ Schedule Flow Valve /

Safety Fail Position Valve Diaram Actuator Code Cate-Func-Func.

Leak Exercise Safe Indicator

_ Number (Coord,)

TvDe Size Glass gga, tion Pps.

Trit Test Tgit Tni Remarks 3

25W-0389 M2-0234 CK/SA 10 3

C A

0 N/A CVD/RF N/A N/A AFW Pump Emergency Supply (F-6)

(1)

Flowpath HV-4285 M1-0233 BF/MO 24 3

B A

0/C N/A MT/r)

N/A PIT /

Service Water Flowpath/

(E-2) 2YR Throttling during Pump M2-0233 Start (D-3)

HV-4287 M1-0233 BF/MO 24 3

8 A

0/C N/A MT/Q N/A PIT /

ServiceWaterFlowpath/

(0-2) 2VR Throttling during Pump M2-0233 Start (B-3)

HV-4393 M1-0234 BF/MO 10 3

B A

0 N/A MT/Q N/A PIT /

Service Water F10wpath (F-6) 2YR M2-0234 (F-6)

HV-4394 M1-0234 BF/MO 10 3

B A

0 N/A MT/Q N/A PIT /

Service Water Flowpath (F-1) 2YR M2-0234 (F-1)

'HV-4395 M1-0234 BF/M0 10 3

8 A

0 N/A MT/RF N/A PIT /

AFW Planp Emergency Supply (G-6)

(2) 2YR Flowpath N2-0234 (G-6) 1 L

Rev. 3 Novenber 19, 1993

. =

g_-----__-

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 INSERVICE VALVE TESTING PLAN TABLE 14 - SERVICE WATER NOTES 3

1.

25W-0388 and 25W-0389. Emergency AFW Supply Check Valves, are disassembled every refueling outage to verify operability. At least one of the two valves is required to open to supply the AFW pumps in the unlikely event that the Class 3 Condensate Storage Tank supply is depleted. Full or part-stroke exercising these valves with flow is not practicable because such testing would necessarily introduce lakewater into the nomally dry emergency crosstle line to the Auxiliary Feedwater System and ultimately could contaminate the steam generators.

2.

HV-4395 and HV-43% Emergency AFW Supply Valves, are full-stroke exercised at refueling outages. These valves provide isolation at the Service Water end of the nomally dry emergency crosstie line to the Auxiliary Feedwater System. At least one of the two valves is required to be coened to supply the AFW pum s in the unlikely event that the Class 3 Condensate Storaga Tank supply is depleted. The valves are provided with motor operators for convenience only and @ not respond automatically to any plant condition. In the event that the valves are required to be opened, ample time exists to reposition the valves manually, if required. Full or part-stroke exercising of these valves during plant operation and cold shutdown is not practicable due to the precautions necessary to prevent introducing lakewater into the normally dry emergency AFW crosstie line and possibly into the steam generators. The exercise test for the valves is a lengthy process requiring draining of the respective Service Water train and subsequent refilling. During this time the Service Water train is unavailable to perfom its nomal safety functions.

1 Rev. 3 i

November 19,1993 1

1 r.

.-v4.,--,,,--=-,-...#.,,-w-#,--,-4,,-r.c

..w-..-

r,,~,-c..

-c,

,----e-we,--,,m-,1-.mm-

-,.w-we,,,.m.e.

w-*e-r.,w.-,.-..w,,.-

~

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES j

FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 1 0F 5 BELOW IS A LEGEN0 FOR THE EFFECTIVE PAGE LISTING:

?

Revision 0 Submitted July 1, 1992 4

Revision 1 February 3, 1993 i

Revision 2 April 30, 1993 Revision 3 November 19, 1993 Pace Revision /Date I

Cover Sheet Revision 3 i (Table of Contents)

April 30, 1993 1-1 Revision 2 1-2 Revision 3 3

1-3 Revision 2 1-4 April 30, 1993 2-1 Revision 0 2-2 Revision 0 2-3 Revision 0 2-4 Revision 0 j

Table 0, Page 1 of 4 Revision 0 Table 0, Page 2 of 4 Revision 0 i

Table 0, Page 3 of 4 Revision 2 l

Table 0, Page 4 of 4 Revision 0 Table 0, Notes, Page 1 Revision 2 3-1 Revision 0 3-2 Revision 0 l

3-3 Revision 0 3-4 Revision 0 3-5 Revision 0 Valve Table Index, Page 1 of 3 Revision 2 Valve Table Index, Page 2 of 3 April 30, 1993 l

Valve Table Index, Page 3 of 3 April 30, 1993 Table 1, Page 1 of 11 Revision 0 Table 1, Page 2 of 11 Revision 0 Table 1, Page 3 of 11 Revision 0 Table 1, Page 4 of 11 Revision 0 Table 1, Page 5 of 11 Revision 3 Table 1, Page 6 of 11 Revision 3 Table 1, Page 7 of 11 Revision 0 Table 1, Page 8 of 11 Revision 0 Table 1, Page 9 of 11 Revision 2 Table 1, Page 10 of 11 Revision 0 Table 1. Page 11 of 11 Revision 0 Table 1, Notes, Page 1 Revision 2 EPL-1 November 19, 1993

{

y i

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 l

INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL EFFECTIVE PAGE LISTING i

PAGE 2 0F 5 Table 2, Page 1 of 10 Revision 0 Table 2, Page 2 of 10 Revision 3 Table 2, Page 3 of 10 Revision 0 Table 2 Page 4 of 10 April 30,1993 Table 2, Page 5 of 10 Revision 2 Table 2, Page 6 of 10 Revision 2 Table 2, Page 7 of 10 Revision 0 Table 2, Page 8 of 10 Revision 0 Table 2, Page 9 of 10 Revision 0 l

Table 2 Page 10 of 10 Revision 0 l

Table 2, Notes, Page 1 Revision 0 j

Table 2, Notes, Page 2 Revision 0 Table 3, Page 1 of 1 Revision 2 Table 4, Page 1 of 12 Revision 1 Table 4. Page 2 of 12

. Revision 0 Table 4, Page 3 of 12 Revision 0 I

Table 4, Page 4 of 12 Revision 0 i

Table 4, Page 5 of 12 Revision 0 Table 4, Page 6 of 12 Revision 2 Table 4, Page 7 of 12 Revision 0 i

Table 4 Page 8 of 12 Revision 0 i

Table 4 Page 9 of 12 Revision 2 Table 4, Page 10 of 12 Revision 0 Table 4, Page 11 of 12 Revision 2 Table 4, Page 12 of 12 Revision 0 i

Table 4, Notes, Page 1 Revision 0 i

Table 4, Notes Page 2 Revision 0 Table 4, Notes, Page 3 Revision 2 Table 4, Notes, Page 4 Revision 2 Table 5, Page 1 of 6 Revision 0 Table 5, Page 2 of 6 Revision 0 Table 5, Page 3 of 6 Revision 0 Table 5, Page 4 of 6 Revision 3 Table 5, Page 5 of 6 Revision 0 Table 5, Page 6 of 6 Revision 0 Table 5 Notes, Page 1 Revision 0 Table 6, Page 1 of 2 Revision 0 Table 6, Page 2 of 2 Revision 0 Table 7, Page 1 of 4 Revision 0 Table 7, Page 2 of 4 April 30, 1993 Table 7, Page 3 of 4 April 30,1993 Table 7, Page 4 of 4 April 30, 1993 Table 7, Notes, Page 1 Revision 0 EPL-2 November 19, 1993

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 l

INSERVICE TESTING PLAN FOR PUMPS ANO VALVES l

FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 3 0F 5 Table 8, Page 1 of 6 Revision 0 i

1 Table 8, Page 2 of 6 Revision 0 Table 8, Page 3 of 6 Revision 0 Table 8, Page 4 of 6 Revision 0 Table 8 Page 5 of 6 Revision 0 Table 8, Page 6 of 6 Revision 0 Table 8, Notes, Page 1 April 30, 1993 Table 9, Page 1 of 12 Revision 2 Table 9,-Page 2 of 12 Revision 2 Table 9, Page 3 of 12 Revision'2 Table 9, Page 4 of 12 Revision 2 Table 9 Page 5 of 12 April 30, 1993 Table 9, Page 6 of 12 April 30, 1993 Table 9, Page 7 of 12 April 30, 1993 Table 9, Page 8 of 12 April 30, 1993 Table 9, Page 9 of 12 April 30, 1993 Table 9, Page 10 of 12 April 30, 1993 Table 9, Page 11 of 12 April 30, 1993 Table 9, Page 12 of 12 April 30, 1993 Table 9, Notes, Page 1 Revision 0 Table 10, Page 1 of 3 Revision 0 Table 10 Page 2 of 3 Revision 0 Table 10 Page 3 of 3 Revision 0 Table 10, Notes, Page 1 Revision'0 Table 11, Page 1 of 3 Revision 0 Table 11. Page 2 of 3 Revision 0 Table 11, Page 3 of 3 Revision 2 TLble 11, Notes. Page 1 Revision 2 Table 12, Page 1 of 2 Revision 0 Table 12, Page 2 of 2 Revision 0 Table 13, Page 1 of 17 Revision 0 Table 13, Page 2 of 17 Revision 2 Table 13, Page 3 of 17 Revision 3 Table 13, Page 4 of 17 Revision 0 Table 13, Page 5 of 17 Revision 0 Table 13, Page 6 of 17 Revision 2 i

Table 13, Page 7 of 17 Revision 2 i

Table 13 Page 8 of 17 Revision 0 I

Table 13, Page 9 of 17 Revision 0 Table 13, Page 10 of 17 Revision 2 Table 13, Page 11 of 17 Revision 2 Table 13, Page 12 of 17 Revision 2 Table 13, Page 13 of 17 Revision 0 Table 13, Page 14 of 17 Revision 0 Table 13, Page 15 of 17 Revision 1 Table 13, Page 16 of 17 Revision 0 EPL-3 November 19, 1993

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 i

INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 4 0F 5 j

Table 13, Page 17 of 17 Revision 0 Table 13, Notes, Page 1 Revision 2 f

Table 13, Notes, Page 2 April 30, 1993 l

Table 13, Notes, Page 3 April 30, 1993 Table 14, Page 1 of 3 Revision 3 Table 14, Page 2 of 3 Revision 3 i

Table 14, Page 3 of 3 Revision 0 i

Table 14, Notes, Page 1 Revision 3 Table 15, Page 1 of 1 Revision 0 i

Table 15, Notes, Page 1 Revision 0 f

Table 16, Page 1 of 2 Revision 0 Table 16, Page 2 of 2 Revision 0 i

Table 16, Notes, Page 1 Revision 0 Table 17, Page 1 of 12 Revision 2 Table 17 Page 2 of 12 Revision 2 Table 17, Page 3 of 12 Revision 0 Table 17, Page 4 of 12 Revision 0 i

Table 17, Page 5 of 12 Revision 0 Table 17, Page 6 of 12 Revision 0 Table 17, Page 7 of 12 Revision 0 i

Table 17, Page 8 of 12 Revision 2 i

Table 17, Page 9 of 12 Revision 2 Table 17, Page 10 of 12 Revision 2 Table 1-Page 11 of 12 Revision 2 Table 1~

Page 12 of 12 Revision 0 i

Table 1;, Notes, Page 1 April 30, 1993 Table 17, Notes, Page 2 Revision 2 A-1 Revision 0 A-2 April 30, 1993 A-3 April 30, 1993 A-4 Revision 2 A-5 April 30, 1993 i

A-6 April 30, 1993 A-7 Revision 2 A-8 April 30, 1993 A-9 Revision 2 A-10 April 30,1993 A-11 Revision 2 i

A-12

' April 30, 1993 A-13 Revision 2 A-14 April 30, 1993 A-15 Revision 2 A-16 April 30, 1993 A-17 Revision 2 A-18 April 30, 1993 A-19 Revision 2 EPL-4 November 19, 1993

COMANCHE PEAK STEAM ELECTRIC STATION UNIT 1 & 2 INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL EFFECTIVE PAGE LISTING PAGE 5 0F 5 l

EPL, Page 1 of 5 November 19, 1993 EPL, Page 2 of 5 November 19, 1993 EPL, Page 3 of 5 November 19, 1993 EPL, Page 4 of 5 November 19, 1993 EPL, Page 5 of 5 November 19, 1993 l

l 1

l l

l

-i EPL-5 November 19, 1993 i

. - _.. _,