ML20138E500

From kanterella
Revision as of 19:43, 11 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards SE of Second 10-yr Interval Insp Program Plan Associated Request for Relief 18 for Plant.Alternative Contained in Request for Relief 18 Authorized.Part a of Request Denied.Salp Input Also Encl
ML20138E500
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/26/1994
From: Strosnider J
Office of Nuclear Reactor Regulation
To: Norris J
Office of Nuclear Reactor Regulation
Shared Package
ML20136C539 List:
References
FOIA-96-485 NUDOCS 9412010048
Download: ML20138E500 (2)


Text

.

. ?

'ga November 26, 1994 MEMORANDUM T0:

Jan A. Norris, Project Manager s

Project Directorate 11-2 4

Division of Reactor Projects I, II FROM:

Jack R. Strosnider, Chief Materials and Chemical Engineering Branch Division of Engineering

SUBJECT:

EVALUATION OF THE SECOND TEN-YEAR INTERVAL INSPECTION 3

PROGRAM PLAN ASSOCIATED REQUEST FOR RELIEF N0. 18 FOR ST.

LUCIE NUCLEAR PLANT, UNIT 2 The staff, with technical assistance from its contractor, the Idaho National Engineering Laboratory (INEL), has reviewed and evaluated the information provided by Florida Power and Light in its letter dated October 15, 1993, related to the second ten-year interval inservice inspection program plan Request for Relief No. 18 for the St. Lucie Nuclear Plant, Unit 2.

Based on the information submitted, the staff adopts the contractor's conclusions and recommendations presented in the Technical Evaluation Letter Report attached. The alternative contained in Request for Relief No. 18, Part C is authorized pursuant to 10 CFR 50.55a(a)(3)(1). The alternatives contained in Parts B and D of Request for Relief No. 18 are 4

authorized pursuant to 10 CFR 50.55a(a)(3)(i), with conditions. Part A of the request is denied.

4

, is a SALP input related to this task. This submittal completes the technical review to be performed by the Materials and Chemical Engineering Branch under TAC No. M88087.

i Docket No.: 50-389 Attachments: As stated CONTACT: Tom McLellan, EMCB/DE 504-2716 Distribution:

N

'G.C. Lainas, w/o att C$

4 OC b

G.C. Millman, RES p h #g B.W. Brown, INEL DOCKET NAME: G:\\MCLELLAN\\STLUC2.TKM JN Ta receive a copy of this document, Indicate in the box C=Co:ry w/o attachment / enclosure EzCopy with attachment / enclosure N e No copy h

BC:DE:EMCB

/

0FFICE DE:EMCB C

SC:DE:EMCB NAME TMcLellan M'ESullivan k.

JStrosnided, y

DATE 11/18/94 11/8/94 11/11,/94 (

300113 0FFICIAL RECORD COPY

(%LI 2 O / O C Ljf) })(WL

4 - V. ~ November 26, 1994 MEMORANDUM T0: Jan A. Norris, Project Manager Project Directorate II-2 Division of Reactor Projects I, II ) FROM: Jack R. Strosnider, Chief Materials and Chemical Engineering Branch

j:

Division of Engineering

SUBJECT:

EVALUATION' OF THE SECOND TEN-YEAR' INTERVAL INSPECTION 3 ~ PROGRAM PLAN ASSOCIATED REQUEST FOR RELIEF NO.-18 FOR ST. LUCIE NUCLEAR PLANT, UNIT 2 i The staff, with technical assistance from its contractor, the Idaho National l Engineering Laboratory (INEL), has reviewed and evaluated the information provided by Florida Power and Light in its letter dated October 15, 1993, related to the second ten-year interval-inservice inspection program plan { i j Request for Relief No.18 for the St. Lucie Nuclear Plant, Unit 2. Based on the information submitted,- the staff adopts the contractor's conclusions and recommendations presented in the Technical Evaluation Letter Report attached. The alternative contained in Request for Relief 'No. 18, Part C is authorized-pursuant to 10 CFR 50.55a(a)(3)(i). The alternatives contained in Parts B and D of Request for Relief No.18 are authorized pursuant to 10 CFR 50.55a(a)(3)(1), with conditions. Part A of the request is denied. is a SALP input related to this task. This submittal completes the technical review to be performed by the Materials and Chemical Engineering Branch under TAC No. M88087. Docket No.: 50-389 ~ Attachments: As stated CONTACT: Tom McLellan, EMCB/DE 504-2716 Distribution: p Central Files i EMCB.RF/PF G.C. Lainas, w/o att 4 G.C. Millman, RES B.W. Brown, INEL DOCKET NAME: G:\\MCLELLAN\\STLUC2.TKM i T. c.c.sv.. copy of this docu nt, irr2iente in the bon c copy w/o.et.ch nt/.neto.ur. s copy with set.ch nt/. net or. m

u. copy 0FFICE DE:EMCB C

SC:DE:EMCB N BC:DE:EMCB M I NAME TMcLellan M'ESullivan k JStrosnided y, a DATE 11/18/94 11/h/94 11/4/94 ( j OFFICIAL RECORD COPY l}}