ML20138E272
Text
..
o January 12, 1994 MEMORANDUM FOR:
Herbert N. Berkow, Project Director (14H-22)
Project Directorate 11-2 Division of Reactor Projects - I/II FROM:
Robert C. Jones, Chief Reactor Systems Branch Division of Systems Safety and Analysis
SUBJECT:
ST. LUCIE UNIT 2 - DELETION OF MOVABLE INCORE DETECTOR l
OPTION FROM THE TECHNICAL SPECIFICATIONS (TAC NO. M87723)
Plant Name:
St. Lucie Unit 2 Utility:
Florida Power and Light Company TAC No(s).:
M87723 Docket No(s).:
50-389 Project Directorate:
Project Directorate Il-2 Project Manager:
J. Norris Review Branch:
SRXB Review Status:
Complete By letter dated August 23, 1993 Florida Power and Light Company requested a change to the Technical Specifications for St. Lucie Unit 2.
This proposed change would delete the option of using the movable incore detectors.
The Reactor Systems Branch has reviewed the proposed change and finds it acceptable.
Our SER and our SALP evaluation are provided in enclosures 1 and 2 respectively. This completes tgyB;pffort on TAC No. M87723.
Ro8srOb'Jone's, Chief Reactor Systems Branch Division of Systems Safety and Analysis
~
Enclosures:
As stated I
cc:
A. Thadant J. Norris (14H-22) 4 PEB/SALP (10A-19)
Contact:
M. Chatterton/SRXB/DSSA Ext. 504-2889 l
DISTRIBUTION:
Docket File RPerch St. Lucie P/F SRXB R/F MChatterton y
RJones MChatterton R/F l
St. Lucie P/F g ff
SRXB:DSSA SRXB:D S B:DSSA MCHATTERTQF WLYON RJ NES 1/11/94 /#
1 / 12, / 9 4 1 if94 G:\\SL87723 e
r- -
.j {;
\\\\
'e 1900 0 EE$
~
i